• Title/Summary/Keyword: Building Construction Management

Search Result 2,661, Processing Time 0.031 seconds

Development of Process Management Manual for Quality Improvement of Green Building (그린빌딩의 품질향상을 위한 공정관리매뉴얼 개발)

  • Kim, Dae-Geon;Hwang, Hyun-Jun;Ryu, Kyoung-Gu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.245-246
    • /
    • 2013
  • The construction of green building has distinct charicteristics by work classification by applying green technologies. Thus if the new technologies are applied to construction, unskiiled worker can experience construction time delay, reconstruction occurrence and quality decrease because of mistakes during the construction and work progress. For this background, we establish the work progress manual to secure quality and performance during the construction phase of green building and provide method to be used in the construction sight operation.

  • PDF

Strategies for Facilitating Post-Construction Evaluation and Management System (건설공사 사후평가 제도 활성화 방안 수립)

  • Lee, Kang-Wook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.379-380
    • /
    • 2023
  • The Post-Construction Evaluation and Management System has been operated over the past 20 years not only to analyze the performance of large-scale construction projects, and but also to provide useful reference data for future similar projects. Although the Post-Construction Evaluation and Management Center has been legally designated and operated since 2020, various problems have been occurring in the operation of the system. Accordingly, this study proposes strategies for facilitating Post-Construction Evaluation and Management System in terms of the following three aspects: (1) improving the implementation rate of post-construction evaluation; (2) improving the information management system related to post-construction evaluation; (3) improving the utilization of post-construction evaluation outcomes. Based on the results of this study, a specific action plan will be prepared, which is expected to contribute to the efficiency of construction project performance management in the future.

  • PDF

Study on Safety Management Status and Policy Directions of Small and Medium-sized Building Construction Field in Seoul (서울시 중·소형 건축공사장의 안전관리 실태와 대책 마련 연구)

  • Kim, Joo-Young;Lee, Jiae;Kim, Jong-Chan
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.361-375
    • /
    • 2021
  • Seoul metropolitan government of South Korea has large population and facilities, and lots of building construction have been performed in urban area. Many safety accidents with causing lives and property damages occurred at construction sites in South Korea and Seoul. Thus, Korea government and Seoul have made efforts to secure the safety of construction sites. In this study, current law and measures by central department and Seoul were analyzed to find limitations and improvement points in construction safety management. Safety inspection results for construction sites in Seoul were investigated to demonstrate the main hazard work and safety risk, and interview surveys targeting safety managing persons were performed according to safety management, inspection, and education. Based on analytical results of current status on safety management, improvement measures were proposed for safety secure on construction safety in Seoul. The proposed measures include improvement of safety management systems, alleviation of safety blind spots according to construction size, strengthening efficiency of safety management, and autonomous safety engagement by construction sites centered.

Setting the New Trends for BIM in Construction: Productivity, Performance, Competitiveness, and Innovation

  • Wang, Xiangyu;Moon, Sungkon
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.21-22
    • /
    • 2015
  • Productivity has been a wide-ranging challenge for the construction industry, both in Australia and globally. Particularly in Western Australia's construction and resources sectors, continuously low productivity will potentially discourage future investments. The emergence of the global marketplace necessitates that the supply chain needs to focus on the concept of the holistic efficiency. The isolated geographical position of Australia only exacerbates this phenomenon. In recent years, Building Information Modelling (BIM) has been suggested as an efficient way to help productivity improve and information management throughout supply chains. This keynote talk will focus on discussing ways of implementing BIM to enhance site productivity focusing on Western Australia's construction projects. It will show new trends of its applications to accomplish an innovative way in construction project management. The talk will also give an insightful summary of integrated methods with state-of-the-art technologies backboned by the BIM cases from construction and oil and gas industry projects.

  • PDF

The Guideline structure for improving sustainability in building construction projects (건축 프로젝트의 친환경성 제고를 위한 사업관리 가이드라인 구성 체계 도출)

  • Hong, Suk-Kyoo;Kim, Chang-Won;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.26-27
    • /
    • 2014
  • Sustainable development has become a growing concern throughout the world. Construction industry also has participated in the efforts to minimize the environmental impacts. In Korea, the government has already established the green construction certification(G-seed) and guidelines for sustainable construction. However, domestic guidelines are focused on the design and construction phase, not on the construction project. In addition, it is difficult to find instructions due to the complex structure based on the work unit. Therefore this study aims to deduct the component structure for sustainable construction guidelines in the planning, design and construction phases by utilizing the Factor Analysis. Following the literature review, a total of 26 criteria were identified. Further, a survey was conducted to capture the perceptions on the importance of the criteria. According to the factor analysis, the criteria can be grouped into 8 factors : Environmental factors management, Management planning, Cost and Design management, Energy management, Material management, Certification and regulation management, General Management and Others.

  • PDF

The Improvement Plan of Organization Management Through the Survey of Actual Condition in Construction Work (건설공사(建設工事) 실무분석(實務分析)을 통한 조직관리(組織管理) 개선방안(改善方案))

  • Choi, Byung-Ju;Cui, Xian;Choi, Suk-Woo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.121-129
    • /
    • 2008
  • Domestic exoteric construction market by opening of world construction market with recent FTA of rapidly change. On these time, need quality increase of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of good quality. Therefore, must establish direction to inspects and must advance forward formation government official's present actual conditions for building company's QI. This study is as following if summarize studying result of formation government official to improve quality in construction spot. First, formation's CEO will for QI need side improvement the formation government official enemy by important thing. Second, at checking activity and systematic action that participate of responsible persons cooperation enterprise space-time by complete charge department organization should be achieved. Third, complete charge department for quality control operation large size construction firm substantially formation Organizational well operate, but heavy hydrogen building company was construed by greatly unprepared misgovernment. AHP analysis result complete charge department is serious necessity, and the CEO under direct control organizational structure was construed by thing which can bring excellent effect in operation management side of quality business side and formation. Therefore, heavy hydrogen building company should does to occupy competitive power high position with tissue at active quality complete charge deputy.

Application of Construction Management techniques in Small Construction Projects (소규모 프로젝트의 효율적인 공사관리방안)

  • Lee, Sang-Beom;Lee, Dong-Un
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.4
    • /
    • pp.95-102
    • /
    • 2003
  • A construction project's period is limited by the order manufacture. And a construction project is requested a specific place, and has the characteristic to be irregular. Today, construction is to be representative high-cost and low-efficiency. This kind of problems appears in small construction projects more often than large construction projects. According to this facts, we recognized necessity of making practical application in methods of construction management. Also, we suggest application and establishment of integrated responsibility management department, PMIS(Project Management Information System) and Data Base. From now on, methods of construction management could be good opportunities for small construction projects and local construction companies. Therefore, small and local construction companies should try to improve their abilities. Likewise, the countries systematize to constitute the relation laws.

A Study on the Integrated Management System for Rebar Information in Building Construction (건설공사 철근정보관리 개선방안에 관한 연구)

  • Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.99-106
    • /
    • 2005
  • With labor shortage and high-wage, the construction cost is rising and the construction-business is dull, demanding the construction environment of Korea to raise profitability through major cost savings and rationalization of construction management. Therefore, in this study, to improve many problems found in calculating rebar quantity for capital expenditure programming which is considered the beginning stage of rebar work. and to improve problems such as no grasping of rebar loss due to lack of systematic management in order/purchase stage and construction management stage, a rebar information-management-system was found and preyed. The relation database was designed for the rebar information management system by analyzing work process of a rebar manufacturing plant, as the rebar information that is necessary in a rebar manufacturing plant if similar to that of a purchasing department of general construction company. The Proposed rebar information management system was implemented in two large rebar production plants. The implementation of the proposed system showed that the system increased work efficiency, reduced the management manpower, and improved the project-integrated management

A Basic Study on the Derivation of Vulnerability Factors for Safety Management of old Buildings (노후 건축물의 안전관리를 위한 취약성 요소 도출 기본연구)

  • Oh, Gyuho;Cha, Inhyuck;Ahn, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.275-276
    • /
    • 2023
  • In order to prevent disaster risks caused by building aging in advance, the prevailing opinion is that it is urgent to actively improve systems such as mandatory safety inspections, and to calculate risks and develop safety management systems due to building aging. The need for systematic risk management continues to be emphasized in the process of safety inspection and repair of old buildings, but the risk management and safety management techniques of each construction entity have not been established in practice. Accordingly, this study aims to analyze the vulnerability factors of aging buildings and provide basic data on the development of a risk rating calculation model for old buildings and the efficiency of safety management systems in the future.

  • PDF

Priliminary Study on the Construction Management of Facade System Using Cable-net (케이블넷을 이용한 파사드 시스템의 시공관리를 위한 기초연구)

  • Moon, Sang-Deok;Ock, Jong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.189-191
    • /
    • 2013
  • Analysis of cable net facade by examing the literature and technical manual for it's characteristics, types, elements of construction management. And it will be performed research on the construction quality management such as development of guidelines and specification, analysis of the structural behavior.

  • PDF