• Title/Summary/Keyword: Building Automation

Search Result 494, Processing Time 0.024 seconds

Study on Subway Emergency System Based on Wireless Sensor Network (무선 센서 네트워크 기반의 지하철 응급 상황 조치 시스템에 관한 연구)

  • Choi, Ho-Jin;Park, Jong-An;Pyun, Jae-Young
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.7 no.5
    • /
    • pp.139-146
    • /
    • 2008
  • Wireless sensor network-related application system can perform functions such as environmental pollution monitoring, building control, home automation in future. In this paper, we present wireless sensor network based system for subway station in order to reduce the damage of the people and the subway station due to fire. Sensor nodes in this system can sense temperature, illumination, smoke, and human body in real time and detect the accident in the subway station. These real-time sensing and wireless networking minimize casualties and damage to property.

  • PDF

An Implementation of Hybrid-Simulation in Manufacturing Environments using Object-Oriented Methodology (객체지향 기법을 이용한 공장운용 환경 하에서의 혼합시뮬레이션 구현)

  • 김성식
    • Journal of the Korea Society for Simulation
    • /
    • v.7 no.1
    • /
    • pp.15-26
    • /
    • 1998
  • In building a shell-based FMS, which is known as one of the top-down approaches in the field of factory automation, we may take a hybrid simulation into consideration. The modeling of a hybrid simulation consists of real physical entities, virtual simulation, and central clock algorithm, etc. to carry out the whole system operation. In this paper, we sow a way to construct a hybrid simulation software system in manufacturing environments. We bring in the object-oriented methodology in system design and it can contribute in dealing with a wide variety of production types and configurations. Some classes such as project, product, process, order, schedule, stage are defined. These are used and tested by implementing a specific LSI circuit assembly line process.

  • PDF

Fast 3D reconstruction method based on UAV photography

  • Wang, Jiang-An;Ma, Huang-Te;Wang, Chun-Mei;He, Yong-Jie
    • ETRI Journal
    • /
    • v.40 no.6
    • /
    • pp.788-793
    • /
    • 2018
  • 3D reconstruction of urban architecture, land, and roads is an important part of building a "digital city." Unmanned aerial vehicles (UAVs) are gradually replacing other platforms, such as satellites and aircraft, in geographical image collection; the reason for this is not only lower cost and higher efficiency, but also higher data accuracy and a larger amount of obtained information. Recent 3D reconstruction algorithms have a high degree of automation, but their computation time is long and the reconstruction models may have many voids. This paper decomposes the object into multiple regional parallel reconstructions using the clustering principle, to reduce the computation time and improve the model quality. It is proposed to detect the planar area under low resolution, and then reduce the number of point clouds in the complex area.

$CO_2$제어 개보수 평가

  • Schell, Mike;Smith, Doug
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.32 no.6
    • /
    • pp.49-56
    • /
    • 2003
  • CO2환기제어는 신축건물에서 흔히 사용되고 있지만, 기존의 건물에서는 그 적용 예가 흔하지는 않다. 아마도 개보수라는 것이 가능하다고 여겨지는 자원절감이나 이익에 대한 방대한 기록이 요구되기 때문이며 게다가 제어에 관한 개보수는 복잡하다는 인식에 기인한다. 공교롭게도, 에너지 사용 패턴에 대하 명확한 기록이 있는 기존의 건물에 가장 에너지절약적인 기회가 많다는 사실이다. 이 기고문에서는 기존 건물의 CO2개보수에 관하여 그 성능 평가에 대한 방법론을 제시하고 있으며, 현장 평가와 이 방법론을 적용한 A-등급 사무소 건물에서의 개보수를 통한 성능개선에 관하여 분석하고 있다. 대상은 첨단 DDC시스템이 있는 미국 환경청의 에너지스타 등급을 획득한 건물이다.

  • PDF

The research about RTPM system construction that apply use case modeling methodology

  • Eun Young-Ahn;Kyung Hwan-Kim;Jae Jun-Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.464-471
    • /
    • 2009
  • Robot and application of IT skill of construction industry are slow comparatively than another thing industry by the feature. This research proposes progress management and real time information gathering through construction automation and RFID focused on steel structure construction. Building for RTPM system, must consider various variables and surrounding situation in construction field and it is the most important and difficult matter that draw right requirement and grasp relation between this requirements to accomplish one suitable task considering these environment. Therefore, in this study analyzes requirement and target for RTPM system based on scenario that is easy to draw requirement and apply this to use case model. Presented method suggests that represent relation between goals and way that refines goal systematically from requirement of RTPM system. And it could express for visualization through the Way that attaches nonfunctional elements of system with system internal goal.

  • PDF

Challenges and suggestions of resource planning for standardized concurrent construction

  • Chen, Xingbin;Li, Sining;Kim, Jung In;Fang, Yuan
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.41-49
    • /
    • 2020
  • Concurrent construction offers considerable improvement for shorten the project duration of its production process. Therefore, standardized concurrent construction is widely applied in building construction projects. However, resources planning for standardized concurrent construction project is manually developed by construction manager. This practice is not effective since it is time-consuming and error-prone for managers to identify all project-specific information, distinguish different activity-resource types, interpret these types and analyze how they affect resource allocated on an ad hoc basis. Therefore, this research investigates the opportunity for leveraging activity modeling to enable automated resource planning for standardized concurrent construction during project development, with identifying the characteristics of construction activities under standardized concurrent planning and determining the activity-resources types that affects resource planning. Both will function as a basis for modeling these construction activities in a computer-interpretable manner and for automation in resource planning.

  • PDF

A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim;Jungsik Choi;Inhan Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.419-425
    • /
    • 2013
  • Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

  • PDF

A Study for Deriving Target CMV (Compaction Meter Value) of Intelligent Compaction Earthwork Quality Control (토공사 지능형 다짐 품질관리를 위한 목표 CMV(Compaction Meter Value) 도출 방안에 관한 연구)

  • Choi, Changho;Jeong, Yeong-Hoon;Baek, Sung-Ha;Kim, Jin-Young;Kim, Namgyu;Cho, Jin-Woo
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.9
    • /
    • pp.25-36
    • /
    • 2021
  • Recently, the intelligent compaction technology for quality control of earthworks has brought attention as a quality control standard for earthworks. In this study, intelligent compaction technology and earthwork quality control methods were investigated and earthwork quality control procedures using intelligent compaction technology were considered based on field tests. Through the field compaction test of the silty sand (SM) fill material, it was confirmed that CMV and bearing capcaity index from plate load tests increased as the number of compactions increased. Based on the field test data, the average CMV and quality control target CMV were derived. The target CMV (34.2) was calculated through the correlation with the bearing capacity index of the plate load test, and the target CMV (36.6) was calculated through the analysis of the CMV increase rate. In this paper, the on-site compaction quality management procedure and methodology using intelligent compaction technology were discussed, and an intelligent compaction quality management method was proposed to promote the applicability of the technology.

A Framework for the Computer-aided Shop Drawing (철근 배근시공도 설계 자동화 프레임워크)

  • Maeng, Seung-Ryol;Gong, Heon-Taek
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.12
    • /
    • pp.556-565
    • /
    • 2009
  • In this paper, we propose a CAD software framework to automatically generate a shop drawing. Shop drawing is to draw the geometric figures representing an arrangement of steel bars for a concrete building on its structural design, based on its construction specifications and the design rules, and its well-formed process lead to be automated. A key point of the design automation is to minimize the user interactions by automatically recognizing the design specifications and to finally generate the shape of the geometric figures. The graphic pipeline of the proposed framework consists of four stages; a specification DB, specification extraction, binding, and rendering. To effectively extract all specifications only for a figure from the DB and bind them to its shape, we use a hierarchical approach; the specifications are classified into three common, structural, and figure classes, and each attribute is extracted in design phases. Based on our framework, we implemented a specialized CAD for shop drawing using AutoCAD and could easily update it according to user's demands.

A Study on Development of Disaster Prevention Automation System on IT using One-chip Type PLC (원칩형 PLC를 이용한 IT 기반 방재용 자동화시스템 개발에 관한 연구)

  • Kwak, Dong-Kurl
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.16 no.2
    • /
    • pp.97-104
    • /
    • 2011
  • This paper deals with the quick and precise disaster prevention automation system (DPAS) based on information communication technology (IT) that detects fire and disasters in the building automatically and quickly and then activates the facilities to extinguish fire and disasters, monitoring such situation in a real time through wire-wireless communication network. The proposed DPAS is applied a programmable logic controller (PLC) of one-chip type which is smallsize and lightweight and also has highly sensitive-precise reliabilities. The one-chip type PLC analyzes detected signals from sensors in a case of fire and disasters, then activates fire extinguishing facilities for rapid suppression. The detected data is also transferred to a remote situation room through wire-wireless network of RS232c and bluetooth communication. The transferred data sounds an emergency alarm signal, and operates a monitoring program. The proposed DPAS based on IT will minimize the life and wealth loss from rapid measures while prevents fire and disasters.