Since the 2000s, the demand for private demolition works has been gradually increasing as the apartment housing market has been led by redevelopment and reconstruction. In the case of the military, the Ministry of National Defense is consolidating troops from each military unit to reorganize the unit structure in accordance with Defense Reform 2.0; the plan includes reducing the garrison used by each unit to 70% of its current level. Accordingly, the demand for demolition work in the military is also expected to increase. However, the military regulations do not reflect the relevant laws that have been revised recently. This study identifies regulations and system improvements for demolition work suitable for the military based on an analysis of accident cases that have occurred during demolition work, of domestic and foreign laws and regulations related to military demolition work, and of the problems with current military safety management at each stage of planning, design, and construction. The study subsequently proposes improvements for military demolition work, including budget execution adjustment, the establishment of training courses, on-site inspections, the development of guidelines for military demolition work, the provision of risk assessment standards, and the need for the qualification of equipment operators.
This study focused on diagnosing and analyzing the level of sustainable development for each fishing communities by applying the sustainable development index in the fishing communities to support the policy of revitalizing the fishing communities. In terms of methodology, diagnostic indicators for rural areas were used through previous studies and literature surveys, and three categories, five fields and 27 indicators were finally selected through collecting opinions from experts. After deriving the weight for each indicator in detail, the final sustainable development index of the fishing communities was applied to fishing village fraternity. Based on the results of the analysis of the application of sustainable development cases in fishing communities, policy support should be implemented differentially according to regional decline factors and potential growth factors. In the population and social sector, it is necessary to consider ways to reduce population and reduce aging. In the industrial and economic sectors, fishing activation and systematic support for fishing-related industries should be provided. In the marine and built environment sector, the government's active project execution and budget support are required. In addition, it is expected to be used in various ways in the process of developing fishing communities and establishing revitalization plans that reflect the characteristics of the region.
International conference on construction engineering and project management
/
2011.02a
/
pp.510-515
/
2011
Urban renewal projects, in the form of mega-projects, are being actively implemented both nationally and internationally to revitalize inactive cities. These programs, however, are difficult to manage efficiently due to their need for a large budget over a long period of time and due to conflicts with stockholders. Moreover, existing cost and duration management systems are structured with emphasis on the design and construction stage of unit projects, thus limiting their application to long-term mega-projects that are integrated with various facilities. To solve these problems, this study developed a web-based system that can collectively manage the cost and duration of mega-projects at a program level. The unit modules included in the system--CBS organization, construction cost and duration prediction, and total cost and duration prediction--can support decision-making at the early stage of the program. Furthermore, the modules, which include contract management, execution management, change management, and program progress management, support the program operations for its successful accomplishment. The web-based cost and duration management system developed in this study is expected to be used as a valuable tool that supports the successful accomplishment of mega-projects through their efficient management throughout their life cycle.
Purpose: In this study, we proposed a plan to establish and implement a safety and health management system by utilizing corporate resources so that manufacturing companies can effectively respond to the Serious Accident Punishment Act. Methods: We identified critical factors and response strategies necessary for manufacturing companies to respond to the Severe Accident Punishment Act effectively and surveyed employees working at the company regarding their importance and performance. Results: In this study, we presented a method of strategically constructing the response strategies (20) shown in previous studies by matching them with the company's resources (leadership, organization, budget, education, and awareness). In particular, leadership refers to the ability of managers who can prevent serious accidents by carrying out safety and health security obligations to avoid safety and health hazards or risks to employees in the business or workplace that is controlled, operated, and managed. Conclusion: Based on the manager's firm leadership, the system's purpose and direction must be accurately set and sufficiently communicated to members. In addition, for companies to identify and improve risk factors on their own, a Process approach must be established to improve execution by referring to legal standards together with field managers and supervisors.
Korean Journal of Construction Engineering and Management
/
v.11
no.3
/
pp.105-114
/
2010
As the Korean economy went into a recession because of the global financial crisis in 2008, in order to vitalize the Korean economy, the government raised SOC budget and made its execution earlier. To prevent increases in budget for the government financial investment projects, the government controlled the project cost of SOC construction projects by enacting 'Guideline for total project cost management' in 1994 and complementing the relevant system. However, different from government intention, the total project cost of SOC projects were increased drastically. Hence, the government authorities and research institutions insisted the necessity of supplementation and improvement for the total project cost management system. This research is to provide the improvement for the total project cost management system of domestic SOC projects. In this research, As-Is Model was adjusted considering status of the total project cost management in the current SOC projects. Also the cost management of construction projects between domestic and other developed countries was studied, analyzed and compared. Based on the above, problems related to total project cost management of domestic SOC projects were found out and an improved total project cost management was provided to improve these problems.
Journal of the Korean Institute of Landscape Architecture
/
v.18
no.3
s.39
/
pp.171-190
/
1990
It is the purpose of this study to address how to manage the urban vegitation using the concept of Urban Forestry which is relatively new to Korea. When we consider the Urban Forestry as a science, We should understand it interdisciplinary subject which includes Forestry, Horticulture, Urban Planning, Landscape Design, Landuse Planning, Business and Humanities. It may say that people and tree are the fundermental components of Urban Forestry. So there are two ways of Urban Forestry Applications-How people care for trees and How trees care for People-. For the application, this study places the focus on the monetary valuation, tree inventory system and traditional forestry application to urban forest management. Pubic Relation, Communication, Ordinances and Budget are also mentioned as a part of Urban Forestry Policy. Monetary valuation of trees and forests is very important for the proper cognition of their real value. So that, they may be equated and weighed against conflicting uses which would cause to be removed or severely mutilated. A tree inventory system which is the essential part of urban tree management can provide the pertinent information about the present condition of urban tree resource. It may aid in reducing the subjectivity of tree management decisions and stimulate them to be made rapidly and can help reduce potential municipal liability by identifying serious problems in time for corrective maintenance practices to be applied for the maximize community benefits and minimimize public nuisances or hazards. Managers can derive the information from the inventory and use it for the various management plan. When we see the structure of tree inventory system as one of the data base management system, Computer is the best equipment for the efficient management plan. Public relation and communication is also important factors to care the people for urban vegetation management. Volunteer management system is a good example for the public relation and communication. Those skills are need to develop for using the priceless, valuable human resources. Budget holds the key to the execution of Urban Forestry. Good inventory can provide for efficient budgeting stratiges through it's scientific analysis for the way of maximum benefits and minimum costs. Forest can be play a vital role for the aesthetic improvement and recreation in the city. This study suggests that the traditional sivicultural application not only improve the quality of scenic beauty and recreation but also the products of timber. So it is more needed to study for strong and scientific application to urban forest management.
Korean Journal of Construction Engineering and Management
/
v.20
no.6
/
pp.3-10
/
2019
The entire duration of the long-term continuous construction contract project cannot be expected when calculating the initial budget as the construction of the contract is carried out annually according to the budget composition. In addition, the statutes related to the defect liability and execution of contracts have not been established systematically in relation to the contract. Therefore, there are many problems at the actual construction site with regard to the defect liability or the performance of the contract in relation to the contract. In this study, the following improvement directions were presented for the efficient operation of the contracts: First, the defect liability is legal and should be specified in an Act rather than an enforcement decree. Second, if the parties to the contract vary in the following order in the contract, the special agreement should be specified in the enforcement decree. Third, in the event of an indirect cost due to the extension of the period of the long-term continuous work, the contingency items of the total project cost management policy should be utilized. Fourth, in the case of general construction contract conditions, clauses related to the purchase of the premium of the CAR, inspection, taking over, defect repair, and defect inspection shall be supplemented.
When EU was formed in the late 1950s, the income gap or economic development between member nations was similar so that the interest in execution of regional policies at the level of union was relatively small, with just Italy showing some interest relatively. In 1975, however, ERDF was founded, and nations such as Spain or Portugal that were falling behind in economic development compared to existing member nations joined EU, and the regional policy of the union gradually gained attention. Accordingly, EU gradually increased the budget size for regional policies so that through 1980s and 1990s, the budget size grew over 4 times. In 2004 and 2007, 12 Central-Eastern European nations with great gaps in income level with existing member countries joined EU all at once, so that the resolution of regional inequality among member nations arose as an important assignment in the development of the community. Accordingly, EU has modified the overall goals and basis of regional policies to deal with this matter. From such perspectives, this report examined the development process of regional policies executed by EU for the last 50 years. In the conclusion parts, the issues that appeared in the process of executing EU's regional policies were also examined at the same time.
This research suggests video solutions and efficient implementations for low-budget performances. This study adopts Millumin as a mapping server, which reflects the character of small theatres with a lower budget that doesn't use more than four projectors in a show. By comparing pros and cons of media servers, the study discovers how to employ an appropriate server as well as to participate in a pre-video production stage, which increases the artistry of directing and reduces unnecessary graphics. Meanwhile, with the participation of an interpretive programmer, this study suggests a way to manage the rehearsal time and to increase the artistry of directing. In addition, this study analyses the relationship between the video's visual motive source in the story's development, crisis, climax, twist and the provided narrative based on "Trace U the musical (2018)", by this analyzation, the relationship between storytelling and the video is fully shown. A visual motive is related to the action of actors, the movement of dancers, the music, the lyrics and the lines. Furthermore, the provided narrative confirms that the existence of an actual relationship with the turning point of the plots, characters' emotion, suggestions of sub-plot and the twists of own story. In conclusion, it implies a video of small theatres can not be separated from the probability of the narrative.sh an efficient ad execution strategy that reflected the characteristics of mobile devices.
In the current procurement system in Korean military, the army, navy and air force have their own distributors, military branches and warehouses. However, especially, it has been hard to have the economy of scale because most of suppliers have shipped their order from the suppliers to each of Korean military directly. Koran military considers the transportation cost as one of the management cost factors among various kinds of cost. Furthermore they have contracted with the suppliers in annual and collectively on the transportation. Hence they have been in trouble with getting efficiency of Defense budget execution because it is hard to make a decision of Defense budget with real transportation cost. Moreover Korean army, navy and air force have their own supply chain separately, so they can not cooperate flexible and quickly when they need. Therefore, in this research, we provide a benchmarking of DTCI (Defense Transportation Coordination Initiative) which has been proved that it has improved the procurement system in US implementing the integrated transportation system with 3PL and military. In addition we propose advanced integrated shipping model using Hub & Spoke system for Korean military. In order to prove its effect, we simulate our model based on the real data of the suppliers' delivery to compare with the current system when it comes to how much we can save the cost. Our research can provide evidence that the integrated procurement system in Korean military will improve Korean military procurement system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.