• 제목/요약/키워드: Bridge construction projects

검색결과 64건 처리시간 0.021초

Development of Semantic Risk Breakdown Structure to Support Risk Identification for Bridge Projects

  • Isah, Muritala Adebayo;Jeon, Byung-Ju;Yang, Liu;Kim, Byung-Soo
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.245-252
    • /
    • 2022
  • Risk identification for bridge projects is a knowledge-based and labor-intensive task involving several procedures and stakeholders. Presently, risk information of bridge projects is unstructured and stored in different sources and formats, hindering knowledge sharing, reuse, and automation of the risk identification process. Consequently, there is a need to develop structured and formalized risk information for bridge projects to aid effective risk identification and automation of the risk management processes to ensure project success. This study proposes a semantic risk breakdown structure (SRBS) to support risk identification for bridge projects. SRBS is a searchable hierarchical risk breakdown structure (RBS) developed with python programming language based on a semantic modeling approach. The proposed SRBS for risk identification of bridge projects consists of a 4-level tree structure with 11 categories of risks and 116 potential risks associated with bridge projects. The contributions of this paper are threefold. Firstly, this study fills the gap in knowledge by presenting a formalized risk breakdown structure that could enhance the risk identification of bridge projects. Secondly, the proposed SRBS can assist in the creation of a risk database to support the automation of the risk identification process for bridge projects to reduce manual efforts. Lastly, the proposed SRBS can be used as a risk ontology that could aid the development of an artificial intelligence-based integrated risk management system for construction projects.

  • PDF

교량공사 제3자 피해 손실에 의한 리스크 분석 연구 (A Study on Bridge Construction Risk Analysis for Third-Party Damage)

  • 안성진;남경용
    • 한국건축시공학회지
    • /
    • 제20권2호
    • /
    • pp.137-145
    • /
    • 2020
  • 최근 교량은 장대화, 신공법의 도입에 따른 위험요인의 증가로 교량공사에서의 철저한 안전 및 리스크 관리 체계가 필요하다. 공사 현장 주변에 있는 발주자 건설공사 관련자 및 공사와 관련이 없는 제 3자의 기존 재산에 손해를 발생시킬 수 있어 제3자 피해 손실로 인한 리스크가 명확히 분석되어야 함에도 불구하고 연구가 미비한 실정이다. 본 연구는 교량건설 사업에 대한 국내 주요 보험사의 과거 보험료 지급 실적을 토대로 실제 교량 건설에서 제3자 피해 손실로 인한 손실에 대한 교량건설 특성에 따른 리스크 요인을 분석하고, 정량화된 예측 손실 모델을 개발하고자 하였다. 정량적 교량건설 손실모형 개발을 위해 사고 건당 보험지급액을 총공사비로 나눈 손실비율을 종속변수로 선정하였고, 상부구조, 하부구조, 홍수 및 도급순위가 교량건설 중 제3자 피해에 의한 손실비율에 영향을 미치는 지표로 나타났다. 도출된 결과는 건설프로젝트에 대한 손실 평가 모델 개발에 기존의 프로젝트 내부에서 발생한 손실과 더불어 제3자 피해손실을 고려함으로써 더불어 균형 있는 리스크 평가에 필수적인 지침으로 활용할 수 있다.

교량 공사 프로젝트의 정량적 리스크 평가에 관한 연구 (A Study on the Quantitative Risk Assessment of Bridge Construction Projects)

  • 안성진
    • 한국건축시공학회지
    • /
    • 제20권1호
    • /
    • pp.83-91
    • /
    • 2020
  • 최근의 교량 건설 프로젝트는 교량 건설의 증가추세에 따라 위험 손실에 대비하기 위해 보다 정교한 리스크 관리 조치와 손실 예측을 요구하고 있다. 본 연구는 교량 건설 사업에 대한 국내 주요 보험사의 과거 보험료 지급 실적을 토대로 실제 교량 건설에서 목적물의 손실을 유발하는 위험 요인을 분석하고, 정량화된 예측 손실 모델을 개발하고자 하였다. 정량적 교량건설 손실모형 개발을 위해 사고 건당 보험지급액을 총공사비로 나눈 손실비율을 종속변수로 선정하였고, 독립변수로는 1)기술적 요인: 상부 구조 유형, 하부 구조 유형, 상부 가설방법, 교량 길이 2) 자연재해요인 : 태풍, 홍수 3) 프로젝트 정보: 공사기간, 총공사비를 채택하였다. 선정된 독립변수 중 상부구조, 가설방법 및 프로젝트 기간이 교량건설 손실 비율에 영향을 미치는 지표로 나타났다. 본 연구 결과로 도출된 리스크 지표와 손실예측 함수는 정부 관련기관, 교량 건설 설계 및 시공사, 보험회사에 정량적 피해 예측 및 위험 평가 서비스를 제공하며, 향후 기초 교량 리스크 평가 개발 연구의 가이드라인으로 활용할 수 있다.

인프라건설 프로젝트 리스크 분석에 따른 손실 정량화 모델 개발 연구: 교량프로젝트를 중심으로 (Development of Loss Model Based on Quantitative Risk Analysis of Infrastructure Construction Project: Focusing on Bridge Construction Project)

  • 오규호;안성진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.208-209
    • /
    • 2022
  • This study aims to analyze the risk factors caused by object damage and third-party damage loss in actual bridge construction based on past insurance premium payment data from major domestic insurers for bridge construction projects, and develop a quantitative loss prediction model. For the development of quantitative bridge construction loss model, the dependent variable was selected as the loss ratio, and the independent variable adopted 1) Technical factors: superstructure type, foundation type, construction method, and bridge length 2) Natural hazards: flood anf Typhoon, 3) Project information: total construction duration, total cost and ranking. Among the selected independent variables, superstructure type, construction method, and project period were shown to affect the ratio of bridge construction losses, while superstructure, foundation, flood and ranking were shown to affect the ratio of the third-party losses.

  • PDF

발주방식에 따른 성능수준 평가에 관한 연구 (Evaluation on Performance Level of Design-Build and Design-Bid-Build (Focused on Bridge Construction Projects))

  • 조규만;김희욱;현창택;구교진
    • 한국건설관리학회논문집
    • /
    • 제8권2호
    • /
    • pp.75-83
    • /
    • 2007
  • 최근 국내의 설계시공일괄방식(이하, 일괄방식)은 설계시공분리방식(이하, 기타방식)에 비해 높은 초기투자비용으로 인하여, 효용성에 대한 의문이 지속되고 있다 한편 발주방식별 성능을 평가한 기존의 연구를 살펴보면, 일괄방식은 공기측면과 품질측면에서 기타방식에 비해 우수한 것으로 보고되고 있다. 비교적 정량적 평가가 가능한 공기측면의 성과와 달리, 품질 측면의 성능은 해당 시설물의 발주자와의 면담을 통하여 만족도 수준을 평가하는 정성적인 평가가 대부분이다. 따라서 이 연구에서는 기존의 연구와는 달리, 2000년 이후 일괄방식과 기타방식으로 발주된 교량계획에 대한 성능수준을 평가하기 위하여, 설계도서 중심으로 계획성, 시공성, 유지관리성 등의 측면에서 평가해 보고자 한다. 이를 통하여 실제로 발주방식별 품질 등의 성능 측면에서 발주방식별 성능수준의 차이를 도출하였다.

강널말뚝 교대의 응력 및 변형 해석 (Analysis of Stress and Strain for Steel Sheet Pile Bridge Abutment)

  • 정하익;유준;오인규;은성운;손인군;이성열;김형구
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2004년도 춘계학술발표회
    • /
    • pp.561-564
    • /
    • 2004
  • Steel sheet pile can be alternative material for bridge abutment for. The steel sheet pile bridge abutment is new and replacement bridge abutment due to its aesthetically attractive and cost effective. Use of embedded steel sheet piling brings savings in dead load, provides a compliant retaining wall, and permits speedier construction. In addition, for replacement bridge projects, traffic interruption can be minimized. It is hoped that this study will encourage designers and constructors to consider a steel substructure option more frequently during the conceptual and preliminary design phases of projects and thereby to take advantage of the potential to construction more efficiently. In this paper, an analysis of stress and strain for steel sheet pile bridge abutment was conducted. From the analysis results, the stress and strain characteristics of steel sheet pile bridge abutment with variations of steel sheet pile parameters is suggested.

  • PDF

건설공사의 확률적 위험도분석평가 (Probabilistic Risk Assessment for Construction Projects)

  • 조효남;임종권;김광섭
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1997년도 가을 학술발표회 논문집
    • /
    • pp.24-31
    • /
    • 1997
  • Recently, in Korea, demand for establishment of systematic risk assessment techniques for construction projects has increased, especially after the large construction failures occurred during construction such as New Haengju Bridge construction projects, subway construction projects, gas explosion accidents etc. Most of existing risk analysis modeling techniques such as Event Tree Analysis and Fault Tree Analysis may not be available for realistic risk assessment of construction projects because it is very complex and difficult to estimate occurrence frequency and failure probability precisely due to a lack of data related to the various risks inherent in construction projects like natural disasters, financial and economic risks, political risks, environmental risks as well as design and construction-related risks. Therefor the main objective of this paper is to suggest systematic probabilistic risk assessment model and demonstrate an approach for probabilistic risk assessment using advanced Event Tree Analysis introducing Fuzzy set theory concepts. It may be stated that the Fuzzy Event Tree AnaIysis may be very usefu1 for the systematic and rational risk assessment for real constructions problems because the approach is able to effectively deal with all the related construction risks in terms of the linguistic variables that incorporate systematically expert's experiences and subjective judgement.

  • PDF

축하중 및 횡하중을 받는 강널말뚝 교대에 관한 연구 (A Study on Axially and Laterally Loaded Steel Sheet Pile Bridge Abutment)

  • 정하익;오인규;유준;은성운;손인군;이성열;김형구;이영호
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2003년도 봄 학술발표회 논문집
    • /
    • pp.427-430
    • /
    • 2003
  • Steel piling for abutments of new and replacement bridges can be aesthetically attractive and cost effective. Use of embedded steel sheet piling brings savings in dead load, provides a compliant retaining wall, and permits speedier construction. In addition, for replacement bridge projects, traffic interruption can be minimized. It is hoped that this study will encourage designers and constructors to consider a steel substructure option more frequently during the conceptual and preliminary design phases of projects and thereby to take advantage of the Potential to construction more efficiently.

  • PDF

Quantity Surveyors' Perception of Cost Impact Factors in Hong Kong Civil Engineering Projects

  • Chiu, Wai Yee Betty;Lau, Hat Lan Ellen
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권3호
    • /
    • pp.1-9
    • /
    • 2015
  • Project cost is an important concern in any construction project. Although there has been a lot of studies on factors affecting the cost of construction projects, there seems no consensus as what cost factors have direct influence on the cost of civil engineering projects. This study therefore aims to bridge the current knowledge gap by examining quantity surveyors' perception of the factor structure among nineteen costing attributes identified based on literature review. Questionnaire was used to elicit responses from quantity surveyors working in the Hong Kong construction industry. Principal component analysis is conducted to extract the factor structure of the cost attributes and the attributes are grouped into three factor components, namely the contract management factor, the project management factor and the monetary value factor. Understanding these cost impact factors could be crucial in managing civil engineering projects, since it allows the project stakeholders and quantity surveyors to take precautionary steps to identify the cost management problems and areas for improvement and could even help to avoid cost deviations in engineering projects.

교랑 공사에 동시공학 적용을 위한 체크리스트 도출 (Checklist for the application of concurrent engineering in bridge construction)

  • 박세만;박태일;김형관
    • 한국건설관리학회논문집
    • /
    • 제14권1호
    • /
    • pp.3-11
    • /
    • 2013
  • 건설프로젝트가 대형화, 복합화, 그리고 장기화됨에 따라, 혁신적인 신공법의 개발과 건설 프로세스의 첨단화에 대한 건설 시장의 요구도 지속적으로 증가하고 있다. 이에 건설 분야에서는, 빠른 상품 개발과 품질향상을 위하여 산업분야에서 널리 쓰였던 동시공학의 건설프로젝트 적용을 고려하게 되었다. 하지만 동시공학의 개념들은 선진화된 관리시스템의 부재 및 개념의 학술적 정립 미비로 인하여, 실제 건설 현장에 충분히 활용되지 못하였다. 이에 본 연구는 대표적인 장기, 대형 프로젝트인 교량공사를 대상으로 성공적인 동시공학 적용을 위한 체크리스트를 도출하였다. 국내 건설 분야에 동시공학 실제 적용 사례와 문헌고찰을 통해 일차적으로 동시공학의 건설 산업적용을 위한 체크리스트를 도출한 뒤, 교량전문가 인터뷰를 바탕으로 이전 단계에 도출된 체크리스트를 교량공사의 특성에 맞게 수정하고 발전시켜 교량공사에 성공적인 동시공학 적용을 위한 체크리스트를 확정하였다. 또한 188 명의 관련 업무 수행자들의 설문조사를 바탕으로 체크리스트의 유용성을 검증하고 중요도 실행도 분석으로 우선적인 관리가 요구되는 필수요소를 확인하였다. 본 연구를 통하여 도출된 체크리스트는 교량건설 프로젝트의 진행에 있어 체계적인 사전검토와 건설 단계별 프로세스의 종합적 분석을 가능케 하여, 동시공학의 실무 활용성을 증대시킨다는 점에서 그 의의가 높다고 판단된다.