During the core drilling for the design of a railway bridge crossing over the inferred fault system along the river, fracture zone, extends vertically more than the bottom of borehole, filled with fault gouge was found. The safety of bridge could be threatened by the excessive subsidence or the reduced bearing capacity of bedrock, if a fault would be developed under or around the pier foundation. Thus, a close examination of the fault was required to rearrange pier locations away from the fault or to select a reinforcement method if necessary. Geophysical methods, seismic reflection method and electrical resistivity survey over the water covered area, were applied to delineate the weak zone associated with the fault system. The results of geophysical survey clearly showed a number of faults extending vertically more than 50m. Reinforcement was not desirable because of the high cost and the water contamination, etc. The pier locations were thus rearranged based on the results of geophysical surveys to avoid the undesirable situations, and additional core drillings on the rearranged pier locations were carried out. The bedrock conditions at the additional drilling sites turned out to be acceptable for the construction of piers.
The problems associated with constructing high-speed concrete track embankments over soft compressible soil has lead to the development and/or extensive use of many of the ground improvement techniques used today. Drains, surcharge loading, and geosynthetic reinforcement, have all been used to solve the settlement and embankment stability issues associated with construction on soft soils. However, when time constraints are critical to the success of the project, owners have resorted to another innovative approach. Especially, the design criteria of residual settlement is limited as 30mm for concrete track embankment, it is very difficult to satisfy this standard using the former construction method. Pile net method consist of vertical columns that are designed to transfer the load of the embankment through the soft compressible soil layer to a firm foundation and one or more layers of geosynthetic reinforcement placed between the top of the columns and the bottom of the embankment. This paper will present the guidelines for the design of pile net method to supported embankments. These guidelines were developed based on a review of current design methodologies and a parametric study of design variables using numerical modeling.
Precast prestressed double-tee slab may be designed by the PCI Design Handbook. It is based on the bridge construction and is required for reorganization for the use of buildings in the domestic construction environments. Much enhanced sections are developed from the reforming process on the determined design factors in the previous experimental works on double tees. Pre-determined shape, reinforcement detail, and 5000 psi concrete strength can not be expected as the best solution for the domestic construction requirements because large amount of use on that systems are anticipated. Flexural tests are performed on four full-scale 12.5m proto-type models, "least depth double tee", which are resulted from the optimization process. Domestic superimposed live load regulation, domestic material properties which is available to product, building design requirements and economy in construction are considered as the main factors to establish. the first two sections are double tee section for 1.2 ton/$\m^2$ market live load with straight and one-point depressed strands and the second two are for 0.6 ton/$\m^2$ parking live load with those strand types. All of the specimens tested fully comply with the flexural strength requirements as specified by ACI 318-95. However, the research has shown that following improved considerations are needed for better result in practice. The locations and method of connection for the lowest bottom mild bar, connection method between precast and cast-in-place concrete, and dap-end reinforcement are need to be improved.
The problems associated with constructing high-speed concrete track embankments over soft compressible soil has lead to the development and/or extensive use of many of the ground improvement techniques used today. Drains, surcharge loading, and geosynthetic reinforcement, have all been used to solve the settlement and embankment stability issues associated with construction on soft soils. Geosynthetic-reinforced embankment supporting piles method consist of vertical columns that are designed to transfer the load of the embankment through the soft compressible soil layer to a firm foundation and one or more layers of geosynthetic reinforcement placed between the top of the columns and the bottom of the embankment. In the paper, the evaluations of a seismic performance of geosynthetic-reinforced embankment piles for a ultra soft ground during earthquake were studied. the equivalent linear analysis was performed by SHAKE for soft ground. A seismic performance analysis of Piles was performed by GROUP PILE and PLAXIS for geosynthetic-reinforced embankment piles. Guidelines is required for pile displacement during earthquake. Conclusions of the studies come up with a idea for soil stiffness, conditions of pile cap, pile length and span.
Xie, Qiang;Sinaei, Hamid;Shariati, Mahdi;Khorami, Majid;Mohamad, Edy Tonnizam;Bui, Dieu Tien
Steel and Composite Structures
/
v.30
no.5
/
pp.433-441
/
2019
The aim of this research is reinforcing of concrete with variety of fiber reinforced polymer (FRP) configurations and investigates the load capacity and ductility of these connections using an experimental investigation. Six scaled-down RC exterior joints were tested under moderately monotonic loads. The results show that, the shape of the FRP had a different effect on the joint capacity and the connection ductility coefficient. The greatest effect on increasing the ductility factor was seen in the sample where two reinforcement plates were used on both sides of the beam web (RCS5 sample). For the sample with the presence of FRP plates at the top and bottom of the beam (RCS3 sample), the ductility factor was reduced even the load capacity of this sample increased. Except for the RCS3 sample, the rest of the samples exhibited an increase in the ductility factor due to the FRP reinforcement.
Park, Jeongsun;Park, Sanghyeok;Park, Eunhye;Lee, Myunggwan
Journal of Korea Society of Digital Industry and Information Management
/
v.18
no.2
/
pp.77-91
/
2022
Social innovation refers to activities that solve social problems by developing new ideas in cooperation with actors close to the field for the purpose of preserving the sustainability of society. In the field of social innovation, voices calling for a bottom-up method that starts with citizen participation are growing, and the need to improve public officials' awareness of social innovation and strengthen professionalism is being raised. In the era of Covid 19 and the 4th industrial revolution, digital literacy is being emphasized to us. In the field of social innovation, the need to strengthen social activities using digital media is growing. In this paper, an example of online social innovation project education based on the design thinking methodology was presented for public officials in Busan to improve their awareness of social innovation and secure expertise, and the effect of job competency reinforcement was statistically verified. As a result of statistical analysis, the average difference between the 'online communication' factor and the 'online empathy' factor was the largest, and it can be interpreted that digital literacy for social innovation has been strengthened.
In Korea, small reservoirs have been constructed for the supply of agricultural water, but most of them have been over 50 years from the year of construction. Aging agricultural reservoirs are being investigated for serious defects such as leaks and movements in slope, which are very vulnerable to safety. Accordingly, grouting methods are used to reinforce aging agricultural reservoirs in Korea. However, cement used as a grouting injection material consumes natural resources and generates a large amount of greenhouse gases during production. In addition, there is a problem that sufficient reinforcement is not made due to various factors such as the injection amount, the compounding ratio, the injection pressure, and etc. Therefore, due to these problems, the development of new materials and methods that can replace the grouting method and cement is required. In order to solve these problems, this study conducted an laboratory test on the surface stabilizer used to secure the stability of road and rail slopes. In addition, the program was analyzed and the reinforcing effect was examined when the surface stabilizer was used as reinforcement material for aging agricultural reservoir. As a result of the laboratory test, when the surface stabilizer is mixed, the increase of cohesion is possible up to 9% and there is no change in the friction angle. The results of the program analysis showed that the 1.0m reinforcement of slopes increased the factor of safety by 1.4 times, making it possible to reinforce the aging agricultural reservoir using surface stabilizers. And as a reinforcement method, it was analyzed that it is most appropriate to reinforce the slope and the bottom of slope simultaneously.
This study was carried out to investigate the bending strength of the Larix glulam beams which were reinforced with CFRP (Carbon fiber reinforced plastic) of which the reinforcement ratios were 0.7% and 2.1% by volume. In the bending test, the rupture shape of the reinforced glulam shows that the reinforced glulam broke firstly in the lowest bottom layer on which tension was loaded, but did not in the upper part reinforced with the CFRP layer. The upper part of the reinforced layer kept strength and did not break when the reinforced glulam broke firstly at the bottom part of the reinforced layer, but broke secondly as loading was increased. In the glulam beams reinforced with CFRP of which the reinforcement ratio was 0.7% by volume, the bending strength of the reinforced beams was increased by 28% at the first break. When beams broke up to the upper part of the reinforced layer, the bending strength of the reinforced beams was increased by 55%, compared to those of control glulam beams. When the glulam beams were reinforced with CFRP of which the reinforcement ratio was 2.1% by volume, the bending strength of the reinforced beams was increased by 77%, compared to those of control glulam beams. The ratio of the height of calculated neutral axis using failure mode recommended by Romani and the height of actual neutral axis using strain gauge was 1.03 and agreed well.
There is a possibility of poor-state concrete filling condition due to segregation and interlocking of aggregate and paste when a high performance concrete is used at reinforced concrete structure without compaction. This study was conducted to evaluate the flexural behavior of high performance concrete beams with design parameters such as c, t and different concrete filling conditions. Different concrete filling conditions were intentionally made such that the first type specimen was soundly cast to obtain the perfect concrete filling condition. Second type was cast in such a way that up to the longitudinal tensile reinforcement from the top, good concrete was filled while poor concrete was poured for the bottom part to simulate the poor strength, workability and unsatisfactory compaction. Third type was cast in such a was that up to the neutral axis of the beam section from the top, good concrete was filled while so did for the bottom part as the second type. The test results were analyzed in terms of load-displacement response, failure pattern, crack width and crack spacing. The test results indicate that have no effect of concrete filling conditions on the yielding strength of structures. But, have a grate influence on the stiffness and ductility of structures.
Journal of Korean Association for Spatial Structures
/
v.20
no.3
/
pp.71-79
/
2020
In this paper, the hybrid prefabricated retrofit method that improve structural performance and reduce construction period was developed by using a finite element analysis. The hybrid prefabricated retrofit method consist of a Z-shaped side plate, a L-shaped lower plate, and a bottom plate containing an steel plate with openings. This shape has advantage that a retrofit method is possible regardless of the size of the beams and a follow-up process such as reinforcement bars placing are not required. The finite element analysis of hybrid Prefabricated retrofit method showed the most ideal stress distribution when the thickness of bottom plate was 10mm, the thickness of the L-shaped lower plate was 5mm, the thickness of the Z-shaped side plate was 2.5mm, and the bolt spacing was 200mm. The bending strength equation of Hybrid prefabricated retrofit method was proposed through the plastic stress distribution method in KDS 41 31 00. The result of Comparison the proposed equation with the finite element analysis, it is determined that the design of hybrid prefabricated retrofit method is possible through the KDS 41 31 00.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.