• Title/Summary/Keyword: Boring investigation

Search Result 82, Processing Time 0.026 seconds

Investigation and Repair Methods for the Excavated Mountain Area damaged by Rainfall : At the Sunghak Campus, Dong-A University (호우로 인한 절개산지의 피해 조사 및 대책공법 -동아대 승학 캠퍼스를 중심으로-)

  • 정성교;김종대
    • Geotechnical Engineering
    • /
    • v.7 no.2
    • /
    • pp.27-40
    • /
    • 1991
  • The Sunghak Campus, Dong-A University, which located at the excavated area of mountain, has been constructed year by year for about 10 years since 1978. The buildings, steep slopes, road and so on in the Campus area were damaged by heavy rainfall more than 200mm 1 day on August, 1989. The methods used for the investigation and repair methods of the damage are the preliminary investigation, the present condition survey, 50 by 50m grid survey, compasstraverse for locating outcrops, geopysical exploration, geologic survey, boring and laboratory soil testing. Based on the results of investigations, the causes of the failures have been evaluated, and the repair methods have been set up as horizontal drains, removal of the dangerous rock, retaining wall with subsurface drains, the elimination of colluvium and slope stabilization by use of precast concrete grids and so on.

  • PDF

Soil Contamination Analysis and its Treatment for Landfilled Area (폐기물 매립지반 오염도 분석 및 처리방안에 대한 연구)

  • Shin, Eun-Chul;Kang, Jeong-Ku;Jang, Woo-Lam
    • Journal of the Korean Geosynthetics Society
    • /
    • v.8 no.2
    • /
    • pp.1-9
    • /
    • 2009
  • When some structures are constructed over the sanitary landfill, the waste should be treated by means of replacement and other ways. Otherwise, various problems like a ground contamination, settlement, reduction of bearing capacity and others may be generated. To find out the optimal method of treatment, the properties of the ground have to be inspected. In this study, the preliminary investigation was conducted to find out the characteristic of this site which is considered as insanitary waste landfill. Furthermore, the shape and the amount of the waste was investigated by subsurface investigation like a boring and sampling methods. In addition, the degree of ground contamination and disposal method of refuse was examined.

  • PDF

Evaluation of Precision of the Domestic Geotechnical Information Data (국내 지반조사 자료 정밀도 평가)

  • Jang, Yonggu;Jeon, Heungsoo;Chae, Deokho;Cho, Wanjei
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.4
    • /
    • pp.53-60
    • /
    • 2014
  • There have been vast amounts of the site investigation data from the domestic construction sites every year and various national research institutes are constructing the database for the site investigation data. According to the Ministry of Land, Transport and Maritime Affairs, the database for the site investigation has been constructed for covering 154,000 individual boreholes since the computerization project for the geotechnical information started at 2000. It is considered to be high time to evaluate the reliability of the stored DB so that the current DB should be utilized to the various fields related to the planning and site investigation of the construction activities. Therefore, the precision of the stored site investigation data was evaluated via normal distribution for more active sharing and utilization. As a preliminary evaluation of the precision, the locations of the encountered strata from two different sites were analyzed. After the precision of the stored data is determined, the level of reliability of the each category of the stored geotechnical information would be determined and the users would be able to decide which information could be utilized.

A Study on Color System for Korea Children's Museum (국내 어린이박물관의 색채 환경에 관한 연구)

  • Yu, Jin;Lee, Sung-Hoon
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2007.11a
    • /
    • pp.49-53
    • /
    • 2007
  • Children's museum has roles of the characterized place for children as well as the museum for education. Therefore, specific color selection especially for children is one of the most important points to be considered. This study is the short investigation on various interior color systems of children's museums in Korea. In case of Children's Museum in National Museum of Korea, each exhibition area is apparently divided by adopting colors in accord with the subject of each space. Middle color in that museum generally gives stability, and clear color and accent color give better perception and vitality Children's folk Museum has adopted Korean traditional colors, O-Bang Colors, which have indicated Korean tradition for ages. All sections in Incheon Children's Museum are spatially divided, but similar colors of ceiling, wall, and floor give boring atmosphere. Since original colors of furniture in Science section distract attraction of children, proper color selection should be required for better reaction from children. Therefore, this research is aiming for detailed investigation in color system of children's museum and the proper interior color planning of the next children's museums with their main purpose for children in the future.

  • PDF

Investigation and Analysis of Ground Deformation at a Coal Waste Depot in Dogye (도계 석탄폐석 적치장 주변지반의 지형변화 조사 및 분석)

  • Cho, Yong-Chan;Song, Young-Suk;Kim, Kyeong-Su
    • The Journal of Engineering Geology
    • /
    • v.21 no.3
    • /
    • pp.199-212
    • /
    • 2011
  • To investigate the causes of ground deformation around the Dogye coal waste depot in Samcheok city, Gangwon Province, we undertook a field survey and performed boring tests and a topographic analysis using maps compiled in various years. The results of boring tests and analyses of ground fractures indicate that the thickness of the soil layer ranges from 9 to 28.5 m and that ground deformation has occurred to the $240{\sim}250^{\circ}$ direction. The topographic analysis revealed that the topography of the site has changed continuously due to the dumping of coal waste. The causes of ground deformation, investigated by both field surveys and the topographic analysis, were the thick layer of soil at this site, the loading weight of coal waste, and the excavation at the lower part of the slope.

Case Study on the Tunnel Collapses during the Construction and Application of Geotechnical Investigation (터널 시공 중 지반 관련 사고 사례의 원인 분석과 지반 조사 결과의 활용에 관한 검토)

  • Park, Nam-Seo;Lee, Chi-Mun;Gang, Sang-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1998.04a
    • /
    • pp.47-60
    • /
    • 1998
  • It is considered in this paper that the main causes of tunnel collapse during the construction were the insufficiency of data of geotechnical investigations, or their limits due to special ground condition such as its heterogeneity and anisotropy It is thought that safety of ground can be affected by the geological conditions such as presences of discontinuities in good intact rocks, and considered to be necessary that awareness of the conditions of discontinuities in advance is important to apply adequate reinforcement measures. It is also shown that a serious accident had occurred because of the unawareness of the permeable alluvial deposits at the top of the tunnel. And it is shown that the example of application of the results of geotechnical investigation such as face-mapping, pilot boring etc. during tunnel construction, and a serious deformation of tunnel under special geological condition. Therefore, it is strongly recommended to perform an adequate geotechnical investigation to confirm the geotechnical conditons of ground before design, and supplimentary investigation is also needed depending on conditions for safe and econonic construction.

  • PDF

Construction Planning and Design of a Long Tunnel (장대 터널의 계획과 설계)

  • 장석부;윤영훈;김용일;김진한
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.117-124
    • /
    • 2000
  • This paper presents the construction planning and the detail design of a 16.2 km long railroad tunnel in a mountainous area. Major design conditions for railroad are the single track, loop-typed alinement, and a maximum grade of 24.5$\textperthousand$. A underground station(double track) with a length of 1.1km is located in the middle of the line for train cross-passing. Tunnel is excavated in highly complex geological conditions including faulted areas, abandoned mine works areas, and various rock types such as sandstone, shale, limestone, and coal seam partly. Drilling and blasting method was adopted because it is more flexible than TBM(Tunnel Boring Machine) as a result of risk assessment for geological conditions in this area. Two working adits were planned to adjust the construction schedule and can be used for ventilation and maintenance in operation phase. New material and concept were introduced to the tunnel drain design. They are expected to improve tunnel drain condition and capability. Rational tunnel support design was tried to consider the various tunnel size and purpose and to use the geological investigation results.

  • PDF

A Study on the Modeling and Diagnostics in Drilling Operation (드릴링 작업의 모델링과 진단법에 관한 연구)

  • Yoon, M.C.
    • Journal of Power System Engineering
    • /
    • v.2 no.2
    • /
    • pp.73-80
    • /
    • 1998
  • The identification of drilling joint dynamics which consists of drilling and structural dynamics and the on-line time series detection of malfunction process is substantial not only for the investigation of the static and dynamic characteristics but also for the analytic realization of diagnostic and control systems in drilling. Therefore, We have discussed on the comparative assessment of two recursive time series modeling algorithms that can represent the drilling operation and detect the abnormal geometric behaviors in precision roundshape machining such as turning, drilling and boring in precision diemaking. For this purpose, simulation and experimental work were performed to show the malfunctional behaviors for drilling operation. For this purpose, a new two recursive approach (Recursive Extended Instrument Variable Method : REIVM, Recursive Least Square Method : RLSM) may be adopted for the on-line system identification and monitoring of a malfunction behavior of drilling process, such as chipping, wear, chatter and hole lobe waviness.

  • PDF

Determination of Segment Sealing Material for a shield TBM tunnel under the Han river in the Bundang railway (분당선 철도 한강 하저터널에서 세그먼트 방수재 선정)

  • Kim Yong-Il;Kim Dong-Hyun;Hwang Nak-Yeon;Jang Sung-Wook;Kim Jang-Su;Hyung Tae-Kyung
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1188-1196
    • /
    • 2004
  • In this paper a determination of the optimal segment sealing material for a tunnel under the Han river between the Sungsoo-dong, Sungdong-Gu and the Chungdaw-dong, Kangnam-Gu in the Bundang railway. The geological investigation results show that some fractured zones exist loca]]y under the northern boundary of the Han river bed, but the other regions consist mostly of hard rocks of good Quality in the tunnel excavation level. Also, a hign water pressure of $5kgf/cm^2$ and a flash inflow of river water due to old boring holes are expected during tunnel excavation. A combined type sealing material of EPDM gasket with expansional rubber is selected as a optimal segment sealing material for the Han river tunnel considering the geological and site conditions.

  • PDF

Determination of a large shield TBM for a tunnel under the Han river in the Bundang railway (분당선 철도 한강 하저터널에서 대구경 쉴드장비 선정)

  • Kim, Yong-Il;Kim, Dong-Hyun;Cho, Sang-Kook
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.569-578
    • /
    • 2003
  • In this paper a determination of the optimal excavation method and machine type for a tunnel under the Han river between the Sungsoo-dong, Sungdong-Gu and the Chungdaw-dong, Kangnam-Gu in the Bundang railway. The geological investigation results show that some fractured zones exist locally under the northern boundary of the Han river bed, but the other regions consist mostly of hard rocks of good quality in the tunnel excavation level. Also, a hign water pressure of $5kgf/cm^2$ and a flash inflow of river water due to old boring holes are expected during tunnel excavation. A EPB shield TBM is selected as a optimal excavation machine for the Han river tunnel considering the geological and ,site conditions.

  • PDF