• Title/Summary/Keyword: Boring investigation

Search Result 82, Processing Time 0.025 seconds

Evaluation of Near Subsurface 2D Vs Distribution Map using SPT-Uphole Tomography Method (SPT-업홀 토모그래피 기법을 이용한 지반의 2차원 전단파 속도 분포의 도출)

  • Bang, Eun-Seok;Kim, Jong-Tae;Kim, Dong-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3C
    • /
    • pp.143-155
    • /
    • 2006
  • SPT-Uphole tomography method was introduced for the evaluation of near subsurface shear wave velocity (Vs) distribution map. In SPT-Uphole method, SPT (Standard Penetration Test) which is common in geotechnical site investigation was used as a source and several surface geophones in line were used as receivers. Vs distribution map which is the triangular shape around the boring point can be developed by tomography inversion. To obtain the exact travel time information of shear wave component, a procedure using the magnitude summation of vertical and horizontal components was used based on the evaluation of particle motion at the surface. It was verified that proposed method could give reliable Vs distribution map through the numerical study using the FEM (Finite Element Method) model. Finally, SPT-Uphole tomography method was performed at the weathered soil site where several boring data with SPT-N values are available, and the feasibility of proposed method was verified in the field.

Geostatistical Integration Analysis of Geophysical Survey and Borehole Data Applying Digital Map (수치지도를 활용한 탄성파탐사 자료와 시추조사 자료의 지구통계학적 통합 분석)

  • Kim, Hansaem;Kim, Jeongjun;Chung, Choongki
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.3
    • /
    • pp.65-74
    • /
    • 2014
  • Borehole investigation which is mainly used to figure out geotechnical characterizations at construction work has the benefit that it provides a clear and convincing geotechnical information. But it has limitations to get the overall information of the construction site because it is performed at point location. In contrast, geophysical measurements like seismic survey has the advantage that the geological stratum information of a large area can be characterized in a continuous cross-section but the result from geophysics survey has wide range of values and is not suitable to determine the geotechnical design values directly. Therefore it is essential to combine borehole data and geophysics data complementally. Accordingly, in this study, a three-dimensional spatial interpolation of the cross-sectional distribution of seismic refraction was performed using digitizing and geostatistical method (krigring). In the process, digital map were used to increase the trustworthiness of method. Using this map, errors of ground height which are broken out in measurement from boring investigation and geophysical measurements can be revised. After that, average seismic velocity are derived by comparing borehole data with geophysical speed distribution data of each soil layer. During this process, outlier analysis is adapted. On the basis of the average seismic velocity, integrated analysis techniques to determine the three-dimensional geological stratum information is established. Finally, this analysis system is applied to dam construction field.

A Study of Correlation between SPT N-value and Exerted Electrical Energy Required for Ground Drilling I : Basic Study (Laboratory Soil Box Test) (지반굴착에 소요되는 전기에너지와 표준관입시험 N값과의 상관관계 연구 I : 기초연구(실내토조실험))

  • Choi, Changho
    • Journal of the Korean Geosynthetics Society
    • /
    • v.11 no.4
    • /
    • pp.45-53
    • /
    • 2012
  • Ground drilling is a common method to conduct site investigation, soil improvement, and pile installation. In the point of construction ground drilling requires electrical energy to drill a hole in ground in which the energy exerts into the motor located on the head of auger and generates rotational power. In this paper it is verified that the exerted electrical energy is closely related to the strength characteristics of ground. Measurement sensors, recording system, and drilling system were developed to obtain exerted motor current and drilling depth and laboratory soil box tests were carried out. The measured motor current and boring depth were applied to predict SPT N-value and the prediction results were compared to SPT N-value of laboratory tests. The test results show that the exerted electrical energy to bore ground be a good index to estimate SPT N-value.

Uncertainty Analysis of Soft Ground Using Geostatistical Kriging Method (지구통계학 크리깅 기법을 이용한 연약지반의 불확실성 분석)

  • Yoon Gil-Lim;Lee Kang-Woon;Chae Young-Su
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.3
    • /
    • pp.5-17
    • /
    • 2005
  • Spatial uncertainty of Busan marine clay ground, which commonly occurs during site investigation testing, data analysis and transformation modeling, has been described. In this paper geotechnical uncertainty of shear strength indicator $N_k$ has been quantified in both horizontal direction and vertical direction using geostatistical Kriging method. Most of soil data used are from 25 boring tests, 75 laboratory tests, 124 field vane tests and 25 cone penetration tests (CPT). CPT-$N_k$ data for undrained shear strength determination, which are the most important properties in geotechnical design stages, have been analysed. Comparison between cone factor from conventional CPT-based method and that of geostatistical method shows that geostatistical Kriging method is an ideal tool to quantify the spatial variability of uncertainty from self-correlation of soil property of interest, and can be recommended to identify the spatial distribution of consolidation .md shear strength of soils at any sites concerned.

A Fundermental Study on Stabilization in Municipal Waste Landfill Site (도시폐기물 매립지의 안정화에 관한 기초연구)

  • 김은호;김순호
    • Journal of Environmental Health Sciences
    • /
    • v.27 no.1
    • /
    • pp.56-62
    • /
    • 2001
  • The investigation was carried out to analyze the generation and the composition of landfill gas generated from inserted pipe wells into the underground by boring operation and also study the undecomposed waste characteristics by open-cut test at S. waste landfill site in Pusan city. Pilot test was conducted for stabilization. The experimental results from this study were summerized as follows. ; Since COD matter was easuer decomposed than COD matter for continuously biological stabilization in underground, it seemed that BOD and CO $D_{Mn}$ were in the range of 854~4,813mg/$\ell$ and 1,156~6,977mg/$\ell$ and their ratio were generally as high as 0.55~0.74. As C $H_4$ compositions of generated gas were measured in the range of 37.36~60.1%, we could know that C $H_4$ gas was actively generated. Organic matters by open-cut test averaged 13.4~16.6% at each landfill layer, and considering rate of combustible compositions(36.2~66.5%) for landfilling wastes, they have been actively decomposed. The measured and theoretical values of generated gas in waste landfill site were almost similar to C $H_4$ 50.0% and 53.4%, $CO_2$ 39.63% and 45.24%, and after 0.5$^{\circ}C$ with heavy depth and long landfill period. From the results of pilot test for stabilization, after 180 days organic matters were actively decomposed beyond 2.2 times in facultative aerobic lystimeter(B) to exsiting anaerobic lysimeter(A). Therefore, it seemed that landfill site was of benefical to the conversion of facultative aerobic for stabilization.

  • PDF

Case Study of Ground Penetrating Radar for Subsurface Investigation (지하레이더 탐사법을 이용한 지반조사 사례 연구)

  • 문장수;김세환;남욱현;오영철
    • The Journal of Engineering Geology
    • /
    • v.7 no.3
    • /
    • pp.161-171
    • /
    • 1997
  • The exact information on geological structures and characteristics of the subsurface must be acquired to secure quality and safety of constructions. GPR technique, one of the most updated geophysical methods, is known for its applicability to shallow-depth underground surveys. The purpose of this study is to examine the usefulness of GPR method in constructions for detailed subsurface investigations, especially detecting the boundary between basement rock and its overburden. To find appropriate depths of the geological boundaries, it is necessary to obtain velocity of electromagnetic wave propagating into the ground. Wave velocity 0.096 m/ns estimated from velocity analysis using CMP gathers is used for depth conversion from time section. The depths of geological boundaries from GPR profiles are very well correlated with boring data. In addition, GPR survey has found some undulations of the geological boundaries due to weathering, which cannot be provided by conventional coring approaches.

  • PDF

A Study on Public Needs for Privately Owned Public Space (실내공적공간의 공공성에 관한 연구)

  • Yun, Ji-Hye;Kim, Jung-Gon
    • Korean Institute of Interior Design Journal
    • /
    • v.15 no.5 s.58
    • /
    • pp.157-166
    • /
    • 2006
  • Recently, it appears several counterproposals about desirable figures of urban architecture. All of them proposes 'publicity' with cohernt tendency. The reason why it concentrates quantitative expansion of city without united design by urban plannar is that neglect quality values of city. As a solution of poor environment, there cue out the various efforts, about problem of each building, problem of city space, problem of laws and so forth. The reason why necessity of public space was embossed in that architecture extend the activity of citizen and make up the city space. But, each building pursues the private interest, so it is difficult to secure a public space with a high hand. Thus, architecture law has been revised in 1991 and bring the system of open space to match up the publicity and the private interest. Actually, western country brought it and obtained excellent results. While quantity of open space have increased since 1991, a lot of problems revealed in real usage and quality. By means of problem's solution, this study focus on the diversion of recognition for necessity of various open space. In result, on the occasion of approach and openess, except for several building, most glass a facade and the pedestrian can approach easily. Moreover, office buildings near the subway station connected with their low floor. So, the office buildings give openess to pedestrian and a people can approach easily to the buildings. On the occasion of amenity, most have bank and lobby on the first floor and have facilities on the underground floor. It leave open. But the reason why they have bank and lobby is that the space is dry and boring(without elements of nature and rest space). Hence, to make a space full of vitality, it have to plan various design elements and facilities. First of all, plan of indoor public space have to make up facility for the public interest. This study is basic investigation for necessity of indoor public space and through the survey of office buildings, it analyze the character of plan and find out the method of publicity's realization.

Disc Cutter Consumptions Prediction on Applying Shield TBM at the Han Riverbed Tunnel (한강하저터널의 쉴드TBM 적용시 디스크 커터 소모량 예측과 소모량)

  • Choi, Jung-Myung;Jung, Hyuk-Sang;Chun, Byung-Sik;Lee, Yong-Joo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.562-570
    • /
    • 2010
  • This study was conducted to estimate the number of disc cutter consumption and to predict amount of disc cutters when a shield TBM(Tunnel Boring Machine) of the Han Riverbed Tunnel was applied. In fact, it is almost impossible to change the machine after starting the excavation using the shield TBM method. Therefore, it is important to design an appropriate equipment in the shield method - an efficiency choice of the operation equipment plays a key role in the shield tunnel processing. For the above reason, the disc cutter consumption prediction is quite important so that the detailed analysis is required. A number of disc cutter consumption was predicted by the three methods, viz. KOMATSU, MITSUBISHI and NTNU. In addition, the predicted results were compared with field data. The prediction of disc cutter consumption showed that 237 for KOMATSU, 501 for MITSUBISHI, and 634 for NTNU, respectively. However, a total number of 1,263 disc cutter consumption were investigated during the tunnel construction. It was found that there was a huge difference between the predicted and real values of the disc cutter consumption. The more detailed investigation showed that the disc cutter was worn out bluntly in the northbound tunnel, meanwhile it was worn out sharply in the southbound tunnel. In particular, the disc cutter consumption in the southbound tunnel was increased rapidly because of rear abrasion for remaining mucks in the chamber.

  • PDF

Case Study of Derivation of Input-Parameters for Ground-Structure Stability on Foliation-Parallel Faults in Folded Metamorphic Rocks (단층 발달 습곡지반 상 구조물 안정성을 위한 설계정수 도출 사례 연구)

  • Ihm, Myeong Hyeok
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.467-472
    • /
    • 2020
  • Methods for deriving design input-parameters to ensure the stability of a structure on a common ground are generally well known. Folded metamorphic rocks, such as the study area, are highly foliated and have small faults parallel to the foliation, resulting in special research methods and tests to derive design input parameters, Etc. are required. The metamorphic rock ground with foliation development of several mm intervals has a direct shear test on the foliation surface, the strike/dip mapping of the foliation, the boring investigation to determine the continuity of the foliation, and the rock mass rating of the metamorphic rock. etc. are required. In the case of a large number of small foliation-parallel faults developed along a specific foliation plane, it is essential to analyze the lineament, surface geologic mapping for fault tracing, and direct shear test. Folded ground requires additional geological-structural-domain analysis, discontinuity analysis of stereonet, electrical resistivity exploration along the fold axis, and so on.

A Case Study of Bridge Scour Vulnerability Evaluation and Prioritization for National Highway Bridges in the National Capital Region (수도권 국도교량 세굴위험도 평가 및 등급화 사례 연구)

  • Park, Jae-Hyun;Kim, Jeong-Hun;An, Seong-Chul;Lee, Ju-Hyung;Chung, Moon-Kyung;Kwak, Ki-Seok
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.2
    • /
    • pp.7-21
    • /
    • 2008
  • Foundation failure due to bridge scour during floods is the leading cause of bridge failure. Performed were the evaluation of bridge scour vulnerability and prioritization on real bridges registered in the National Highway Bridge Inventory of the capital region. The case studies for 30 national highway bridges consist of site investigation including boring test, bridge scour analysis fur the design flood, bearing capacity evaluation of the bridge foundation before and after scour, comprehensive evaluation of bridge scour vulnerability, and prioritization. Nine of 26 spread (feting bridges showed the potential future vulnerability to scour with significant decrease in the bearing capacity of foundations due to scour and the remaining 17 spread footing bridges were expected to maintain their stability to resist the effects of scour. Three of 4 pile foundation bridges exhibited considerable decrease in the bearing capacity of foundation after scour.