A Study of Correlation between SPT N-value and Exerted Electrical Energy Required for Ground Drilling I : Basic Study (Laboratory Soil Box Test)  

Choi, Changho (Dept. of Geotechnical Engineering, Korea Institute of Construction Technology)
Publication Information
Journal of the Korean Geosynthetics Society / v.11, no.4, 2012 , pp. 45-53 More about this Journal
Abstract
Ground drilling is a common method to conduct site investigation, soil improvement, and pile installation. In the point of construction ground drilling requires electrical energy to drill a hole in ground in which the energy exerts into the motor located on the head of auger and generates rotational power. In this paper it is verified that the exerted electrical energy is closely related to the strength characteristics of ground. Measurement sensors, recording system, and drilling system were developed to obtain exerted motor current and drilling depth and laboratory soil box tests were carried out. The measured motor current and boring depth were applied to predict SPT N-value and the prediction results were compared to SPT N-value of laboratory tests. The test results show that the exerted electrical energy to bore ground be a good index to estimate SPT N-value.
Keywords
Ground drilling; Electrical energy; SPT N-value; Laboratory soil box test;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Bowles, J. E. (1996), Foundation Analysis and Design, 5th Ed., McGraw-Hill, pp.154-162.
2 Chai, S.-G. (2000), "Q&A: Characteristics and application of prebored pile method", Geotechnical Engineering, Korean Geotechnical Society, Vol.16, No.7, pp.83-88.
3 Choi, C., Cho, J., Chung, H., Lee, Y. (2007a), "SPT N-value Estimation from Exerted Electrical Motor Energy for Preboring Pile Installation," Proceedings of 7th Japnanese-Korean-French Seminar on Geo-Environmental Engineering, Grenoble, France, pp.293-298.
4 Choi, C., Cho, J., Lee, Y., Chung, H.-I., Park, Y.-B. (2007b), "A Study for Predicting Rotational Curtting Torque from Electrical Energy Required for Ground Drilling", Journal of Korean Geotechnical Society, Vol.23, No.7, pp.1-8.
5 Fang, H.-Y. (1991), Foundation Engineering Handbook, Van Nostrand Reinhood, New York, pp.123-456.
6 Geotechnical Engineering Research Group (2003), Plan, design, and construction of pile foundation in practice, Gunsul-JeongBo, pp.456-463.
7 Korea Nation Housing Cooperation (2004), Solutions of Structural Problems for Engineers, pp.40-48. (in Korean)
8 Lee, M. W. and Yi, C. T. (1989), Improvement of design and construction quality dontrol of pile foundation, Korea Institute of construction Technology, Research report, pp.123-456.
9 Lee, W. J. (2000), Measurement of pile load transfer using fiber-optic sensor and characteristics of bored precast pile bearing capacity, Ph. D. Thesis, Dept. of Civil and Envoronmental Engr., Korea University.
10 NI (2012), National Instrument web site, www.ni.com.
11 Oh, Y. T., Kwon, W. T. and Chu, C. N. (2001a), "Cutting Torque Control in Drilling Part 1 : Design of a Cutting Torque Controller", Journal of the Korean Society of Precision Engineering, Vol.18, No.8, pp.96-106.
12 Oh, Y. T., Kim, G. D. and Chu, C. N. (2001a), "Cutting Torque Control in Drilling Part 2 : Drilling Torque Control Using Spindle Motor Current and Its Effect on Drill Flank Wear", Journal of the Korean Society of Precision Engineering, Vol.18, No.8, pp.107-115.
13 Park, Y.-H., Kim, N.-Y. and Yook, J.-H. (2004), Design and Construction of SIP Method(II), Korea Expressway Corporation Research Report, pp.35-39.
14 Park, J.-B. (2000), Bearing Capacity of Displacement in-situ Concrete Pile, Ph. D. Thesis, Dept. of Civil Engr., Hanyang University.
15 Perko, H. A. (2000), "Energy Method for Predicting the Installation Torque of Helical Foundations and Anchors", New Technological and Design Developments in Deep Foundations, ASCE, Geotechnical Special Publication No.100, pp.123-456.