• 제목/요약/키워드: Blasting work

검색결과 124건 처리시간 0.017초

화약산업의 발파안전대책 - 소음진동 및 안전거리 설정을 중심으로 - (A Study of the Safe Measure Industrial Explosives)

  • 안명석
    • 화약ㆍ발파
    • /
    • 제9권4호
    • /
    • pp.13-21
    • /
    • 1991
  • This study is concerned with the disasters that occure in the field of industrial explosives and analyzed by two side the disaster of the manufacturing factory and that of the field, and is studied about the safety and the countermeasure. The industrial explosives accidents occure just accidentaly and unforeseeable, and reappearance experiments are more difficult. The 3E of J.H. Harvey was applied in this study to establish the counter measure of preventation of accidents, overcoming these restricted factores. As a method of technical safety countermeasures. The blasting vibration formula which had been conformed from the Seoul Subway Construction work during 1980-1984 year, was uilized, and, using the formula $V=Kw^{0.5}D^{-1.5}$ for the gneiss which is widely distributed in Pusan area, an index of the minimum and maximum amount of gun powder, to be used according to safety distance was made, and it helped the gun powder managing technician's practical business. During the fore work discharging, the safety distances of felling were theoretically established based on the writer ${\diagdown}s$ experiences of more than 10 years on this field.

  • PDF

건설 현장에서 안전성 향상을 위한 지반진동.소음.비산먼지 측정자료의 분석에 관한 연구 -영남지역의 퇴적암.화성암층에서의 발파 및 항타작업을 중심으로- (A Study on Data Analysis of Ground Vibration.Noise Dust Dispersion Measurement for Enhancing Safety at the Construction Sites - Focussed on Blasting and Piling in Sedimentary and Igneous Rocks in the Youngnam Area -)

  • 안명석;류창하;박종남
    • 화약ㆍ발파
    • /
    • 제19권3호
    • /
    • pp.91-104
    • /
    • 2001
  • As in Korean environments with mountainous and hilly areas, the rock generally has to be removed in construction or civil engineering work in tunnelling or excavation for development in urban area. Explosives should be used for blasting, which may cause serious problems on local people for their claim for compensation due to ground vibration, noise. For safe and economic blasting, geology and engineering characteristics of rocks such as discontinuities of rock or weathering are very important factors, together with site characteristics for prediction of ground vibration. In this study, conducted were the detailed study for major rocks most widely distributed in the South-east area, in-situ geological survey, geological and geochemical analysis, and further laboratory uniaxial rock stress, seismic velocity of core samples together with in-situ seismic velocity measurements. Regulations on ground vibration and noise were reviewed for assessing their adaptabilities, and a total of 4,856 measured blasting vibration data were examined for enhancing the confidence level in estimating the predictive formulation using scaled distance statistically.

  • PDF

터널발파-구조물 병행시공을 위한 영향평가 연구 (A Case Study on the Construction of Concrete Structures in Parallel with Tunnel Blasting)

  • 류창하;최병희;김양균;유정훈
    • 화약ㆍ발파
    • /
    • 제21권4호
    • /
    • pp.11-21
    • /
    • 2003
  • 3.6km 장대터널인 미시령터널의 시공기간 단축과 공사비 절감을 위해 터널 발파와 콘크리트 구조물 병행시공 평가 연구를 수행하였다. 이를 위해 기존에 제시된 양생중인 콘크리트 구조물에 대한 진동허용기준을 분석하여 본 현장에 적합한 기준을 제시하였고, 10여회의 발파계측을 통해 약 130점 이상의 계측자료를 획득하여 대상 현장에서의 진동추정식을 도출하였다. 그 결과 발파와 콘크리트 구조물 병행시공을 위한 안전한 작업 지침으로서, 발파시 지발당 최대 장약량에 따라 타설이 가능한 막장으로부터의 안전이격거리가 제시되었다. 이에 대한 실제 검증을 위해 터널내 4곳에 일정한 거리마다 콘크리트 블록을 타설한 후 지속적인 발파 진동을 밭게 한 후 28일 강도시험을 실시하였으며 제시된 지침의 타당성을 확인할 수 있었다.

뇌관당 파쇄암량을 고려한 발파작업수량 산정 연구 (A Study on the Estimation of Total Amounts of Blasted Rock by Detonator Volume used in the Blasting)

  • 김민규;안명석
    • 화약ㆍ발파
    • /
    • 제21권1호
    • /
    • pp.41-47
    • /
    • 2003
  • 도로, 항만, 터파기 등의 공사에서 대량의 발파 작업이 선행되는 경우가 빈번하다. 발파작업은 시공을 맡은 원청 회사측에서 직접 행하는 수도 있지만 대개는 전문적으로 발파를 시행하는 업체에게 하청을 주게 마련이다. 이럴 경우 종종 발파작업이 완료된 이후 원청회사와 하청회사 사이에 발파작업 수량에 대한 원만한 합의를 보지 못할 경우가 있는 이럴 경우 쌍방 혹은 쌍방이 위임한 제3자가 발파작업 수량을 추정하게 된다. 사후에 발파작업수량을 추정하는 방법으로는 일위대가표를 적용한 추정, 시행된 발파의 비장약량을 적용한 추정, 발파작업일보를 비교하여 뇌관당 발파암량을 적용하는 방법들이 있다. 본 연구에서는 특정한 사례를 통하여 뇌관당 발파암량을 적용하여 발파작업수량을 추정하는 방법을 소개하고 이 방법이 다른 여타의 추정 방법에 비하여 가장 신회성이 높음을 입증하였다.

터널 내 작업소음 평가 (The Evaluation of Work Noise in Tunnel under Construction)

  • 윤창연
    • 설비공학논문집
    • /
    • 제26권3호
    • /
    • pp.103-107
    • /
    • 2014
  • To assess a various of workplace noise environment in the tunnel construction site, the measurement is performed while tunnel constructing work. This study focuses on the sound attenuation according to the sound frequency characteristics and the distance from various works in the tunnel. Also, the noise distribution while blasting work is measured according to distance in this study. In addition, the boring processing, muck treatment, and tunnel lining by distance are measured for the noise distributions.

건설현장에서의 제조 발파 설계에 관한 고찰 (A Study on Controlled Blasting Design in Construction Field)

  • 이화창
    • 화약ㆍ발파
    • /
    • 제14권1호
    • /
    • pp.49-63
    • /
    • 1996
  • 발파는 폭약의 폭발에너지를 이용해서 물체를 파괴하는 작업으로 그 이용면은 대단히 넓고, 파괴의 대상인 피파괴물의 종류도 암석, 광석, 석탄등 자연물과 콘크리트, 철재로 된 구조물, 교량구조나 건축물 등 모든 물체에 적용되고 있다. 따라서 발파를 목적에 맞도록 합리적으로 실시하기 위해서는 피파괴물의 성질이나 폭약의 성질을 충분히 이해한 후에 관계하는 모든 조건을 면밀하게 고려해서 계획과 설계를 하여야 한다. 그리고 또한 주변상황과 환경에 대한 영향을 고려하여 안전성이 높은 발파패턴을 선택하여야 하며 진동, 폭풍압, 비산석 등이 재해요인을 억제할 수 있는 방호대책을 세워야 한다. 본고에서는 이와 같은 제어발과 기술에 대해 검토하고자 한다.

  • PDF

발파해체시 낙하충격진동 예측에 관한 연구 (A Study for Felling Impact Vibration Prediction from Blasting Demolition)

  • 임대규;임영기
    • 화약ㆍ발파
    • /
    • 제22권3호
    • /
    • pp.43-55
    • /
    • 2004
  • 최근 들어 타워형 구조물의 사용 연한이 초과함에 따라 구조물 안전 진단 결과에 따라 철거 작업 혹은 국부적인 성능개선 공사론 수행하고 있다. 그러나 철거 작업시 가능한 한 휴지기간(Shut down)을 단축하여야 한다는 측면 및 경제성 측면에서 발파해체공법은 매우 매력적인 철거수단으로 관심이 증대되고 있으나, 철거시 발생되는 진동으로 인해 인접한 정밀 기기류에 대한 영향을 우려하여 철거 기간과 비용측면에서 상대적으로 불리한 기계식 철거공법을 선호하고 있다. 따라서, 본 연구는 연돌과 같은 타워형 구조물의 발파해체시 붕괴된 부재가 지면과 충돌시 발생되는 지반진동 수준을 예측하는 기법과 진동을 저감할 수 있는 각종 방법에 대한 효과를 축소모형시험을 통해 도출하였다.

저층건축물 인근 발파작업시 진동 및 폭음이 층별로 미치는 영향 연구 (A Study on the Influence of Blasting Vibration and Sound on Each floor in Building during Blasting Operation)

  • 이신;김상욱;을지나란플래브토톡;강대우
    • 화약ㆍ발파
    • /
    • 제22권3호
    • /
    • pp.35-41
    • /
    • 2004
  • 국내에는 좁은 국토면적에 많은 주택 또는 건축물을 보급하기 위해 새로운 부지조성을 위한 공사가 도심에서 근접하여 이루어지고 있다. 이 새로운 부지조성을 위해 인근 건축물과 아주 근접하여 시공하는 경우가 많아지고 있으나, 이에 타공법보다 경제적으로 암반을 파쇄하기 위하여 발파작업을 선호하고 있는 실정이나, 도심지에서 발파작업으로 인해 진동 및 폭음 등으로 주변 보안물건에 피해가 발생하였다고 민원을 제기하는 경우가 많이 발생한다. 따라서 본 연구는 ${\bigcirc }{\bigcirc}$지역의 "양산 물금지구 택지조성을 위한 토취장의 발파지점에서 450 - 800M 부근에 위치한 저층건축물(${\bigcirc}{\bigcirc}$빌라 4층)에 1층과 4층에 진동과 폭음을 동시에 계측하여 발파작업으로 인한 진동 및 폭음이 저층건축물(${\bigcirc}{\bigcirc}$빌라)의 층별로 미치는 영향을 검토하였다. 과거 발파 영향권을 분석한 결과 고층아파트는 고층으로 진동이 이동하여 감소현상을 보였으나 본 연구에서 저층 건축물(${\bigcirc}{\bigcirc}$빌라)은 저층보다 윗층(4층)의 경우가 많은 진동크기를 나타내었으며 향후 발파작업시 고층아파트보다 저층건축물이 존재 할 경우 보다 발파작업에 주의하여야 할 것으로 나타났다.

공내 매질이 구조물의 발파이격거리에 미치는 영향에 관한 연구 (A Study on the Effect of the Stemming Hole medium to the Blasting Separation Distance of Structure)

  • 강희섭;정중규;방명석
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제21권1호
    • /
    • pp.100-108
    • /
    • 2017
  • 최근에 도시화와 산업화 및 교통망의 지속적인 확보로 인하여 발파공사를 시행하는 공사장이 증가하고 있다. 발파공사는 주변 주민들의 주거환경과 인접시설물들의 안전에 큰 영향을 미치므로 이에 대한 대책이 필요하다. 본 연구에서는 발파피해를 줄이기 위한 방법 중에서 발파공내의 발파메커니즘을 규명하고 개선하였다. 일반적인 공법에서 발생하는 천공경과 폭약경 사이의 차이로 인한 공간에서 디커플링효과를 규명하고, 이 공간의 매질을 변화시킴으로서 발파 시 진동발생의 규모를 규명하였다. 발파시험은 도로, 철도, 산업단지에서 실시하고, 발파진동을 측정하였다. 측정된 진동속도를 회귀분석하여 발파진동추정식을 산정하고 이를 이용하여 이격거리를 산정하였다. 공내 매질이 공기보다는 물처럼 비중이 큰 경우에 충격력은 크나 폭발 지연시간이 짧아 진동전달거리가 작아 이격거리를 크게 확보할 수 있다.

지중진동 측정을 통한 흙막이 근접발파 영향 연구 (Study on the Effect of Near Blasting to Earth Retaining Wall by Measuring Underground Vibrations)

  • 조래훈;정병호
    • 화약ㆍ발파
    • /
    • 제33권4호
    • /
    • pp.14-24
    • /
    • 2015
  • 근접발파진동이 흙막이 안정성에 미치는 영향을 알아보기 위해 3개 현장에서 시험발파를 시행하였다. 시험결과 동일거리의 지중에서 측정된 진동은 지표에서 측정된 진동의 10~52% 수준으로 작아 어스앵커 정착장 등 지중에 설치된 구조물은 지표에 있는 구조물에 비해 상대적으로 발파진동에 안전함을 확인하였다. 측정된 3개 현장의 지표 및 지중진동 PPV를 통합 회귀분석하여 진동추정식을 도출하였으며, 이를 활용 지중 및 지표에서 양생중인 콘크리트에 대해 양생시간별 허용진동기준을 만족하는 발파패턴별 최소이격거리를 산정하였다. 근거리 발파진동 측정, 흙막이 계측치 변화 확인, 구조물 변형여부 육안관찰을 통해 확인한 결과 특별히 흙막이 안정성에 불리한 불연속면이 발달하지 않는 한 지발당장약량 2.4kg 이하의 발파작업은 흙막이 안정성에 유의미한 영향을 미치지 않는 것으로 판단된다.