• Title/Summary/Keyword: Benefit Estimation Methodology

Search Result 26, Processing Time 0.025 seconds

Comparison of Benefit Estimation Models in Cost-Benefit Analysis: A Case of Chronic Hypertension Management Programs

  • Lim, Ji-Young;Kim, Mi-Ja;Park, Chang-Gi;Kim, Jung-Yun
    • Journal of Korean Academy of Nursing
    • /
    • v.41 no.6
    • /
    • pp.750-757
    • /
    • 2011
  • Purpose: Cost-benefit analysis is one of the most commonly used economic evaluation methods, which helps to inform the economic value of a program to decision makers. However, the selection of a correct benefit estimation method remains critical for accurate cost-benefit analysis. This paper compared benefit estimations among three different benefit estimation models. Methods: Data from community-based chronic hypertension management programs in a city in South Korea were used. Three different benefit estimation methods were compared. The first was a standard deterministic estimation model; second, a repeated-measures deterministic estimation model; and third, a transitional probability estimation model. Results: The estimated net benefit of the three different methods were $1,273.01, $-3,749.42, and $-5,122.55 respectively. Conclusion: The transitional probability estimation model showed the most correct and realistic benefit estimation, as it traced possible paths of changing status between time points and it accounted for both positive and negative benefits.

A Study for Estimation of Benefit from Upgrading Precision Approach Runway Category (정밀접근활주로 등급 상향에 따른 편익산정에 관한 연구)

  • Kim, HuiYang;Kweon, PilJe;Park, JangHoon;Baik, HoJong
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.27 no.3
    • /
    • pp.70-81
    • /
    • 2019
  • The effects of weather on aircraft operations are predominant. In particular, severe weather, such as fog, strong winds, rainfall and snow, can cause delays, diversion or cancellation of operations. Of these, fog is considered the main reason for restricting aircraft operations. Meanwhile, Precision instrument approach using instrument landing system(ILS) has allowed aircraft to land safely even in situations where visibility is limited. However, the precision instrument approach require not only the performance of the aircraft but also the enhancement of the runway. In November 2018, Gimpo international Airport raised the category of the runway 14R from CAT-IIIa to CAT-IIIb to improve aviation safety and operational efficiency. Based on this, the research presented a methodology for estimating benefits according to the category upgrade of the precision approach runway, and estimated the benefits to Gimpo International Airport based on the methodology presented.

Estimation of Water Quality Improvement Benefit Using Replacement Cost Approach (대체비용법을 이용한 하천 수질개선편익 산정)

  • Yeo, Kyu-Dong;Yi, Choong-Sung;Kim, Gil-Ho;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.4
    • /
    • pp.343-353
    • /
    • 2009
  • The objective of this study is to evaluate the effect of the water quality improvement by water discharge through dams and to provide a benefit estimation methodology, taking domestic situation into consideration, by the replacement cost approach analyzed with a sewage treatment plant instead of an alternative dam. To this end, facility that alternates a dam must have same functions of the discharged water from the dam and the two facilities must be able to be compared objectively. To estimate the benefit, estimation methodology of alternative facility's cost is established and criteria of cost.benefit analysis that are duration period and ratio of large scale repairing expense was presented. As a case study, the water quality improvement benefit of Song-Li-Won dam was evaluated, which is planned to be built on Nae-Sung stream in Nak-Dong River system. The results of applying this methodology to Song-Li-Won dam are 644,006 million won of the annual average discharge and 1,351,526 million won of maximum discharge. The usage of the framework in this study is expected for estimation of water quality improvement benefit in case water quality improvement project is performed.

Methodology for Benefit Evaluation according to Maintenance Method and Timing of National Highway Pavement Section (국도포장 유지보수 공법 및 시기에 따른 편익산정 방안)

  • Do, Myungsik;Kwon, Soo Ahn;Choi, Seunghyun
    • International Journal of Highway Engineering
    • /
    • v.15 no.5
    • /
    • pp.91-99
    • /
    • 2013
  • PURPOSES : This study aims at proposing the methodology for benefit evaluations in pavement maintenance methods and timings using KoPMS(Korean Pavement Management System) software which was developed for efficient pavement management. METHODS : This study classified pavement sections into 4 clusters considering AADT(Annual Average Daily Traffic) and ESAL(Equivalent Single-Axle Load) using cluster analysis and used the deterioration models in each cluster. Increased user costs due to pavement deterioration as time goes by and agent costs for maintenance were estimated. Based on deterioration model and KoPMS software, Methodology for benefit evaluation was proposed in pavement maintenance methods and with/without implementation using real pavement section data. RESULTS : This study verified that considering agent costs only would be constrained to decide pavement maintenance methods and timings, and ascertained that decision making with agent and user costs would be effective. In addition, this study revealed that pavement maintenance methods and timings can be affected by AADT and ESAL and frequent pavement maintenances can be more efficient for benefits in pavement sections with more AADT and ESAL. Also this study found that user costs would be more affected to decision making than agent costs. Moreover, Delay of conducting pavement maintenance caused increased vehicle operating costs and environmental costs because of poor conditions of pavements. CONCLUSIONS : This study proposed LCCA and benefit estimation methodology of pavement with considering agent and user costs. The results of this study can be used for baseline data of efficient pavement asset management.

Quantitative Methodology for Analyzing Propriety of Complement and Salary on Military Organization - Concentrating on Army Doctrine Research Institution - (군(軍) 내 민간인력 적정 규모 및 임금 분석을 위한 정량적 방법론 - 육군 교리업무조직을 중심으로 -)

  • Beak, Byungho;Kim, Yeekhyun;Lee, Yong-Bok;Min, Seunghee;Jee, Yonghoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.1
    • /
    • pp.34-41
    • /
    • 2020
  • There has not been any scientific analysis on appropriate size of workforce and salary for civilian workers in military so far. Thus, this paper conducted analysis on propriety in employment size of military doctrine researchers using system dynamic methodology based on annual military doctrine workload. Vensim software was mainly used to measure complement of the research group based on data from job analysis. Secondly, a multiple regression analysis was performed to study an appropriate wage for researchers based on their expertise and working condition. The data from twenty public research institutions and twenty eight job positions that are performing similar duty with military doctrine researchers was obtained and utilized to create a salary-estimation regression equation in the analysis. Finally, with cost-benefit analysis method this paper studied financial effectiveness of hiring military doctrine researchers. Contingent valuation method, which has been recognized as one of the most effective methodologies in cost-benefit analysis on intangible value, was utilized to measure benefit of hiring the researchers. The methodology presented in this paper can be applied to measure and improve the efficiency of military organization not only in military doctrine research area but also in several military functional area (military training, logistics, administration, combat development, and combat support).

A Model for Man-Machine System Evaluation (II) (인간 - 기계시스템의 평가모델 (II))

  • 이상도;하정진;정중희;이동춘
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.9 no.13
    • /
    • pp.17-22
    • /
    • 1986
  • Man-machine system is an integrated total system which is linked by functions of man and machine, and the value of the system is determined by its compatability. And it is able to evaluate the system value on the aspects of utility, availability, and cost benefit. The authors previously represented the methodology of system utility using transfer functions, and this paper successively discusses the reliability of man-machine system. The reliability estimation and evaluation methodologies are briefly mentioned, and some examples are shown in this paper.

  • PDF

Estimation of Raw Water Quality Improvement Benefit of Water Service Using WTP (지불의사를 이용한 상수도 원수수질개선 편익 산정)

  • Yeo, Kyul Dong;Yi, Choong Sung;Lee, Sang Won;Shim, Myung Pil
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5B
    • /
    • pp.419-427
    • /
    • 2009
  • In existing studies about benefit of water quality improvement using WTP, the object of survey is described pre-policy water quality as "current water quality" and improved (post-policy) water quality as "boatable, fishable and swimmable". Multiply WTP by the number of households of basin is total benefit. The existing studies are not benefit of a specific water resource business but benefit of a policy on unsubstantial water resource business. Because of a lack of objectivity and oversimplification, it is difficult for survey respondents to understand an object of survey. The purpose of this study is to evaluate a benefit estimation methodology for raw water quality improvement in water resource development business. After conducting a survey of WTP of 1,000 housewives who is using water service in the National Capital region, the relational expression of water quality improvement (BOD) and WTP is derived by using statistical analysis of the survey. As a case study, the stream water quality improvement benefit of Song Li Won multipurpose dam was evaluated, which is planned to be built at the local secondary stream section on Nae Sung stream in Nak-Dong River system. As a result of study, annual average benefit evaluation is 5,980 million won on the average annual planned discharge, 8,663 million won on the planned discharge during the period except for wet season (July to October), 11,905 million won on the planned discharge during water quality declining period and 14,502 million won on the planned discharge during water quality declining period respectively. By using the relational expression of BOD-WTP, it is easy to estimate the benefit without regard for water quality.

Valuation of Public Data Using Stated Preference Method: The Case of Agriculture Soil Database (진술선호방법을 이용한 공공 데이터의 가치 평가: 농업토양정보 데이터베이스 사례)

  • Lee, Sang-Ho;Ha, Sung-Ho;Jeong, Ki-Ho
    • The Journal of Information Systems
    • /
    • v.27 no.4
    • /
    • pp.149-165
    • /
    • 2018
  • Purpose As Korean economy has been sluggish in recent years, firms' interest in publicly financed projects has increased due to the relatively increasing proportion in the economy. Since 1999, publicly financed projects in Korea need to undergo preliminary feasibility study to evaluate economic efficiency and policy quality if they are larger than a certain scale. The benefits of public projects are one of the most important factors in the preliminary feasibility study but are difficult to estimate due to their nature. Design/methodology/approach This study estimates the benefits of the agricultural soil information database, a public database in Korea. The method used in the study is the stated preference method which is formally used in Korea's preliminary feasibility study. Data are collected through surveys and a logit model is constructed to be estimated by the maximum likelihood estimation method. Findings As the first study evaluating a public database, this study can be used as a baseline in all public database projects developed in the future. In addition, this study can contribute to improving the understanding of both private companies and public organizations who are interested in the cost-benefit analysis and estimation procedure for the publicly financed projects.

A Benefit Analysis of Using Common Random Numbers When Optimizing a System by Simulation Experiments (시뮬레이션을 통한 시스템 최적화 과정에서 공통 난수 활용의 이점 분석)

  • 박진원
    • Journal of the Korea Society for Simulation
    • /
    • v.9 no.4
    • /
    • pp.1-10
    • /
    • 2000
  • One of the primary goals of the simulation experiments is to understand the overall system behavior and to analyze the system, ultimately to optimize the system. Optimizing the system includes determining the optimum condition of the system parameters of interest. This paper is concerned with the simulation methodology for estimating the unknown objective function for the system of interest and optimizing the system with respect to the controllable factors. In the process of estimating the unknown objective function, which is assumed to be a second order spline function, we use common random numbers for different set of the controllable factors resulting in more accurate parameter estimation for the objective function. We will show some mathematical result for the benefit of using common random numbers.

  • PDF

Economic-based approach for predicting optimal water pipe renewal period based on risk and failure rate

  • Kim, Kibum;Seo, Jeewon;Hyung, Jinseok;Kim, Taehyeon;Kim, Jaehag;Koo, Jayong
    • Environmental Engineering Research
    • /
    • v.24 no.1
    • /
    • pp.63-73
    • /
    • 2019
  • This study suggests a method for calculating the benefits of water pipe renewal based on an estimate of the water supply suspension risk. The proposed method based on five benefit items is more direct and specific than other benefit estimation methods. In addition, a methodology evaluating the economics of pipe renewal based on pipe failure rate is proposed for estimating the optimal renewal point from an economic perspective. By estimating the optimal renewal period based on a yearly benefit cost ratio per pipe in a case study area, it was possible to draft an optimal renewal plan for the subject region from an economic perspective. Compared with other methodologies, a reasonable optimal renewal period was derived from an economic point of view. The result of this study may be used to develop future water pipe renewal plans. Moreover, the proposed methodologies and results derived from this study can be applied to asset management plans.