• Title/Summary/Keyword: Based on a Project Approach

Search Result 624, Processing Time 0.025 seconds

Exploring a BIM-based approach of project management

  • MA, Xiaozhi;XIONG, Feng;DONG, Na
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.241-244
    • /
    • 2015
  • Within the building industry, building information modelling has been widely applied among different organizations, disciplines and project phases. In order to achieve coordination and synergy collaborative effort, it demands organized information flow and communication for effective implementation of project management through the construction process. Although many BIM researches provides solutions for project management, few efforts have involved the whole life-cycle process of project. In this article, BIM-based project management relying on a series of applications of BIM technology was introduced by coupling management requirement of a project with BIM. Through adopting BIM to the life-cycle management of the project and incorporating BIM applications to project management practice, we have developed a BIM-based project management approach that specialize in integrated BIM chain and interface-supporting system. At the end, the developing process of BIM-based project management approach is concluded.

  • PDF

A study on the history of project approach and its application for improving mathematical problem solving skill (수학문제해결력 증진을 위한 프로젝트 활용의 역사와 그 적용의 분석)

  • HAN, Sun Young;LEE, Jang Joo
    • Journal for History of Mathematics
    • /
    • v.28 no.6
    • /
    • pp.333-348
    • /
    • 2015
  • Problem sovling skill is one of the core skills in mathematics education. To improve students' problem solving skill, the project approach or project based learning has been developed and applied. A teaching and learning strategy utilizing 'project' encourages students to understand the problem embedded in the project, find and reflect the solution, which might be effective in improving students' problem solving skill. The present study systematically reviews literature regarding project based learning and analyzes the characteristics of project. The findings from the systematic review illuminate an appropriate approach to apply project based learning in mathematics classrooms.

Case-based Software Project Network Generation by the Least Modification Principle (사례의 수정최소화 기법에 의한 소프트웨어 프로젝트 네트워크 생성시스템)

  • Lee, No-Bok;Lee, Jae-Kyu
    • Asia pacific journal of information systems
    • /
    • v.13 no.1
    • /
    • pp.103-118
    • /
    • 2003
  • Software project planning is usually represented by a project activity network that is composed of stages of tasks to be done and precedence restrictions among them. The project network is very complex and its construction requires a vast amount of field knowledge and experience. So this study proposes a case-based reasoning approach that can generate the project network automatically based on the past cases and modification knowledge. For the case indexing, we have adopted 17 factors, each with a few alternative values. A special structure of this problem is that the modification effort can be identified by each factor independently. Thus it is manageable to identify 85 primitive modification actions(add and delete activities) and estimate its modification efforts in advance. A specific case requires a combination of primitive modifications. Based on the modification effort knowledge, we have adopted the Least Modification approach as a metric of similarity between a new project and past cases. Using the Least Modification approach and modification knowledge base, we can automatically generate the project network. To validate the performance of Least Modification approach, we have compared its performance with an ordinary minimal distance approach for 21 test cases. The experiment showed that the Least Modification approach could reduce the modification effort significantly.

The Effects of a Project-Based Ecological Transition Education Program on Young Children's Awareness of Sustainable Development, Ecological Literacy, and Problem-Solving Abilities (프로젝트 접근법에 기반한 유아 생태전환교육 프로그램이 유아의 지속가능발전인식, 생태소양, 문제해결력에 미치는 효과)

  • Gowoon Park;Jihyun Kim
    • Korean Journal of Childcare and Education
    • /
    • v.20 no.3
    • /
    • pp.125-147
    • /
    • 2024
  • Objective: This study aims to implement an ecological transition education program for young children, based on a project approach, to investigate its effectiveness in enhancing sustainable development awareness, ecological literacy, and problem-solving skills. Methods: In this study, 56 five-year-old children from a preschool in S City were assigned to either a quasi-experimental group or a control group, with 28 children in each group. The project-based ecological transition education program for young children was conducted from July 14 to September 15, 2023. The experimental group explored the themes of 'marine life' and 'pets and animal welfare,' while the control group focused on different topics. The research employed independent sample t-tests and analysis of covariance (ANCOVA) for data analysis. Results: The project-based ecological transition education program effectively enhanced young children's awareness of sustainable development, ecological literacy, and problem-solving skills. Conclusion/Implications: This study is significant in developing an integrated, project-based ecological transition education program within a play-centered curriculum. It demonstrates how sustainable values can be effectively incorporated into play. Furthermore, the findings can serve as foundational data for implementing educational and childcare programs that nurture young children to become ecological citizens, leading sustainable futures.

A View from the Bottom: Project-Oriented Risk Mining Approach for Overseas Construction Projects

  • Lee, JeeHee;Son, JeongWook;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.97-100
    • /
    • 2015
  • Analysis of construction tender documents in overseas projects is a very important issue from a risk management point of view. Unfortunately, majority of construction firms are biased by winning contracts without in-depth analysis of tender documents. As a result, many contractors have incurred loss in overseas projects. Although a lot of risk analysis techniques have been introduced, most of them focus project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to control and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized and assess them. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining, data mining, and information visualization. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

Solution of the Resource Constrained Project Scheduling Problem on the Foundation of a Term-Based Approach (Term-Based Approach를 기초로한 자원제한프로젝트스케줄링 문제의 해결)

  • Kim, Pok-Son
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.24 no.2
    • /
    • pp.218-224
    • /
    • 2014
  • The logic-based scheduling language RCPSV may be used to model resource-constrained project scheduling problems with variants for minimizing the project completion time. A diagram-based, nonredundant enumeration algorithm for the RCPSV-problem is proposed and the correctness of the algorithm is proved.

A Study on the Approach Method for the Excavation of the Outstanding Projects in the Agricultural Sector (농업분야 국제개발협력 우량사업 발굴을 위한 접근법 연구)

  • Ji, Seong Tae
    • Journal of Agricultural Extension & Community Development
    • /
    • v.21 no.3
    • /
    • pp.181-213
    • /
    • 2014
  • This study analyzes the approach method for the excavation of the outstanding projects in order to improve the ODA quality in the agricultural sector in a situation of the recent quantitative expansion of the Korea's ODA. This analysis is based on the ODA development paradigm of the international society, Korea's ODA development trends, the problems of system, procedure and contents. The analysis drew five approaches, such as an approach based on the strategies, an approach based on the comparative advantage, an approach based on the partnership, an approach based on the networking, an approach of modeling. If each approach method is applied to the excavation of project closely linked to other approach methods, it would be easier to excavate outstanding project. And it could lead to enhancement of project effectiveness. This study introduced the KAPEX program which excavate the customized ODA projects through the application of these approach methods.

A Qualitative Approach to eIT Project Management (e-비즈니스 IT 프로젝트 관리의 정성적 접근 모형의 개발)

  • Jeong, Gi-Ho
    • Journal of Information Technology Services
    • /
    • v.1 no.1
    • /
    • pp.45-55
    • /
    • 2002
  • This paper suggests a new approach to IT project management based on a regular project meeting results to consider the recent project environment. The greater part of recent IT projects are related to e-business transformation. Transforming to e-business is a new problem very different from those they have been worked, in several point of views. Under e-business era, therefore any IT project is being implemented in more complex, dynamic and uncertain environment than traditional. That is, project leaders must consider more factors to control projects including resources, quality, risks, and technologies, and human resources. The project organizations and software corporations thus need to develop and establish new concepts or methodologies to manage e-business projects. In this point of view, an entropy model in this study is introduced for estimating and managing the uncertainty in project control using multi-attributes of project meeting. This paper proposes a new frame work based on entropy model using project meeting results to consider eIT project environment with a small pilot study.

A Multilevel Project-Oriented Risk-Mining Framework for Overseas Construction Projects

  • Son, JeongWook;Lee, JeeHee;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.39-40
    • /
    • 2015
  • As international construction market increases, the importance of risk management in international construction project is emphasized. Unfortunately, current risk management practice does not sufficiently deal with project risks. Although a lot of risk analysis techniques have been introduced, most of them focus on project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to manage and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

Smart City Challenge Project Case Study: Based on Suwon Smart City New 1794 Project (스마트시티 챌린지 프로젝트 사례 연구: 수원 스마트시티 New 1794 Project 기반으로)

  • Yoon, Chang Jin;Seo, Eung Kyo;Kim, Tae Hyung
    • The Journal of Information Systems
    • /
    • v.30 no.2
    • /
    • pp.243-259
    • /
    • 2021
  • Purpose The beginning of innovation and creation, Haenggung-dong, Paldal-gu, Suwon-si: Suwon Hwaseong Fortress, which began in 1794 by King Jeongjo in accordance with the spirit of Beopgochangsin, mobilized the abilities of traditional techniques, new science and technology, and artists New starting point for urban innovation in Suwon: Based on 5G technology possessed by leading companies in the global ICT industry in Hwaseong (Haenggung-dong), a product of cutting-edge evidence, solve various urban problems through public, private, industrial and academic governance, and a new business model It aims to reorganize into the space where this is created. Design/methodology/approach The New 1794 Project is a 2019 demonstration project requested by the Ministry of Land, Infrastructure and Transport for "Suwon Smart City Challenge Project: Haenggung-dong, Paldal-gu, Suwon-si," developed by the Dankook University SW Design Convergence Center, and the main project from 2020 to 2022. The smart city project strategy should be implemented based on partnerships with multiple stakeholders, and the bottom-up approach and the traditional top-down must be able to coexist. Therefore, the smart city solution applied a horizontal governance method. Findings In this study, the definition of the New 1794 Project, which is the key to defining smart cities in relation to all analyzed aspects, was developed.