Since its beginning the military has continued updating its equipments and facilities by modernizing and expanding them. However, with rapidly growing technologies and business management skills, the time for military facilities' evolvement seems unavoidable. The Defense Installations Agency (DIA) has come to a conclusion that application of BIM is necessary. Since its decision, the DIA has been researching the use of BIM and developing guidelines for its application. Nevertheless, the speed of instructions and practical implementation of its model have been behind its plan due to various reasons. To overcome its limitations, the DIA has come up with three-step-solution: basic experience, budgeting, and expansion. Due to numerous number of projects of BIM, it is almost impractical to implement all of them concurrently. The methodological approach of the research employs the Delphi survey method to quantitatively analyze qualitative information drawn from experts' opinions. By applying the Delphi survey method, the first round of the survey drew lists of constraints, BIM application scenarios as well as BIM promotion measures. Afterwards, at the second round of the survey, criticality of each item collected at the 1st round was analyzed to reach a conclusion. Finally, constraints against BIM application were analyzed, and BIM application scenarios and promotion measures for the BIM were introduced.
Recently, BIM has been widely applying in civil engineering projects centering on the private construction industry in order to establish self guidelines for spreading in practice. However, most BIM technologies and software are based on the architectural projects. In these environments, it is not easy to apply the BIM to a infrastructure field. Even BIM standards with IFC (Industry Foundation Classes) are also focusing on architectural projects. Especially, both private and public sectors do not know about how BIM delivery system should be performed, and how such deliverable should be submitted to the government yet. Thus, we need to analyze an application level of BIM S/W (Software) in real projects and verify their interoperability. Besides, since there are not any common standards that can exchange IFC models for civil engineering projects, we have many issues in converting as-built infrastructure models into IFC and delivering their design documents to the government. Accordingly, this study aims to perform a BIM process with commercial software for real road project after a detailed design process is finished and verify interoperability between diverse BIM software for securing BIM data reliability.
본 연구에서는 BIM과 GIS간 공간정보 상호 운용성을 위해 BIM과 GIS의 대표적인 중립 모델인 IFC와 CityGML간의 상호 운용성을 위한 속성 정보 맵핑을 위한 규칙 정의 메타 데이터를 제안하고 구현 한다. 이를 위해 IFC와 CityGML의 맵핑을 위한 구조를 분석하고 이를 바탕으로 BIM과 GIS간 정보 상호 운용성을 위한 속성 정보 맵핑을 위한 메타 데이터를 제안한다. 메타 데이터는 BIM 모델과 GIS 모델 간의 연결을 위한 연결 정보, 관점 별 맵핑 규칙, 맵핑 규칙을 정의한 연산자와 속성 정의로 구성된다. 이 구조를 설계하고 XML로 표현하였으며, 이를 이용해 속성 정보를 자동 맵핑하는 시스템을 구현하였다.
Digital models for a cable-stayed bridge are defined considering data-driven engineering from design to construction. Algorithms for digital object generation of each component of the cable-stayed bridge were developed. Using these algorithms, Level-3 BIM practices can be realized from design stages. Based on previous practices, digital object library can be accumulated. Basic digital models are modified according to given design conditions by a designer. Once design models are planned, various applications using the models are linked the models such as estimation, drawings and mechanical properties. Federated bridge models are delivered to construction stages. In construction stage, the models can be efficiently revised according to the changed situations during construction phases. In this paper, measured coordinates are imported to the model generation algorithms and revised models are obtained. Augmented reality devices and their applications are proposed. AR simulations in construction site and in office condition are tested. From this pilot test of digital models, it can be said that Level-3 BIM practices can be realized by using in-house modeling algorithms according to different purposes.
구조물의 "3차원 설계"는 성공적인 BIM(building information modeling) 정착을 위한 핵심 기술이다. 이를 위해 다양한 BIM 라이브러리들이 개발되고 있지만 선형기반으로 구조물이 가설되는 교통 인프라의 설계업무에 적용하기에는 한계가 있다. 상용화된 BIM 소프트웨어들이 지원하는 라이브러리를 계획된 선형을 기반으로 구조물이 가설되는 교통 인프라의 설계업무에 적용하는 것은 사용성 측면에서 한계가 있다. 더욱이 조합을 고려하지 않고 개발된 라이브러리로 생성된 모델은 다양한 설계변경 상황에 대응하기가 쉽지 않다. 따라서 본 논문에서는 교통인프라 구조물인 철도 교량을 대상으로, 유관 시설 또는 부재에 대한 3차원 객체를 설계변경에 효율적으로 대처할 수 있도록 매개변수 기법을 적용한 'BIM기반 3D 모델 생성자동화 모듈'을 구축하였다. 모듈의 주요기능은 기준선형을 바탕으로 기준경로를 도출하고 다른 객체와의 조합을 고려하여 목표객체를 연장 및 배열하는 것이다. 또한 모듈의 조합으로 구성된 철도교량의 통합모델에 대하여 설계변수를 입력할 수 있는 사용자 인터페이스를 구성하여 설계변경 대응능력에 대한 적용성을 검증하였다.
이 연구의 목적은 구성주의 교육이론 기반의 BIM/IPD(통합프로젝트수행)교육에 적합한 BIM협업 교육모델제안과 그 교육모델의 효율성을 검증하는 것이다. BIM/IPD기반 협업능력은 건설 전 분야 걸쳐 필요한 역량으로 보고 있다. '구성주의 협업 프로세스' 교육 방식을 실험군(구성주의 협업프로세스)과 대조군(빌딩스마트 협회 BIM 코디네이터 과정)에 적용하여 학습 전후의 상호작용 과정에서 학습효과의 개선을 인지측정(협업의 만족도, 협업의 수준)하고 실무능력(협업고도화지수측정)측정을 통한 '구성주의 협업프로세스'의 학습효과를 검증하는 것이다.
최근 건설분야에 3차원 설계기술인 BIM이 의무화 되면서 다양한 활용사례에 대한 연구가 증가하고 있다. 특히 4차산업혁명의 핵심기술 중의 하나인 가상현실 기술과 BIM이 융합되면 사전 설계검토, 시공시뮬레이션 등 다양한 분야에 활용될 수 있다. 하지만 현재까지 가상현실 접목기술이 단순 프로토타입 수준이거나 모델하우스 정도에만 활용되고 있다. 또한 품질이 높은 가상현실 콘텐츠 제작시 비용이 많이 들기 때문에 관련 분야의 활성화가 어려운 상황이다. 이에 본 논문에서는 가상건설분야 활용도 및 품질을 높이기 위해 BIM을 활용해서 가상현실 콘텐츠를 제작할 때 시간 소요가 많이 발생하는 재질 매핑 시간을 단축시키는 연구를 진행하였다. 이를 위해 BIM 모델시 재질 매핑 가능하도록 객체 속성을 부여하였고, 건설분야에 가장 많이 활용되는 재질을 구성하였으며, 속성과 재질을 자동으로 매핑해 주는 자동화 머터리얼 기능 개발과 최종 테스트를 진행하였다. 테스트를 위해서 10개의 모델을 활용해서 3회 반복 테스트를 하여 최종적으로 약 50.16%의 생산성 향상을 달성하였다. 향후에는 재질 매핑 자동화 기능 고도화를 포함하여 대용량 BIM 모델을 기반으로 물리적인 데이터 경량화를 포함하여 BIM 데이터를 기반으로 가상현실 콘텐츠 제작과 관련된 생산성 향상 연구를 진행할 예정이다.
A Building Information Model (BIM) is an attempt to simulate the process of building structures in a three-dimensional (3D) digital space. While the technology is usually applied to structured buildings, bridges, and underground facilities, it is rarely applied to an unstructured environment of earthwork operations. If a BIM is used for earthworks, the 3D simulation can be used for construction equipment guidance and earthwork management. This paper presents a real-time, 3D earthwork BIM that provides a 3D graphical simulation of excavators in conjunction with geographic modeling. Developing a real-time, 3D earthwork BIM requires handling a variety of factors, such as geographical information and vehicular movement. This paper mainly focuses on the management of these attributes and provides a database design for storing and retrieving data. In an example application, a prototype of the 3D earthwork BIM is presented to understand what it would provide when used during earthwork operations at a construction site.
Nowadays Building Information Modeling (BIM) is a significant source of sharing project information in the construction industry. This method of sharing the information enhances the project understanding among stakeholders. Modeling of information using BIM is becoming an essential part of many construction projects around the globe. Despite rapid adoption of BIM in construction industry still, some sectors of the industry like earthwork have not yet reaped its full benefits. BIM has brought a paradigm shift through identification and integration of the roles and responsibilities of project participants on a single platform. BIM is a 3D model-based process which provides the insight into the efficient project planning and design. The 3D modeling can also be used significantly for the design of temporary structures in an earthwork project. This paper presents the quantity take-off methodology and parametric modeling technique for creating the temporary structures using 3D BIM process. A case study is conducted to implement the proposed temporary structure family design on a real site project. The study presented is beneficial for the earthwork project stakeholders to extract the relevant information using 3D BIM models in a project. It provides an opportunity to calculate the quantity of material required for a project accurately.
본 연구는 BIM기반의 U-안전모니터링에 대한 연구가 주된 내용이다. 연구절차는 다음과 같다. 첫째, 연구의 배경 및 필요성과 연구의 목적 및 연구범위, 방법을 제시하였다. 둘째, BIM의 개념을 설명하고 BIM기반의 U-안전모니터링의 선행되어야 할 고려사항이나 조건 등을 조사하였다. 셋째, 수치지도 사업현황파악 및 BIM 기반 U-안전모니터링구축의 필요요건, BIM과 연동되는 U-안전모니터링시스템이 보다 공간을 확장한 지역영속성계획인 DCP의 적용성에 대하여 조사하였다. 넷째, 연구결과를 토대로 미래 U-안전모니터링을 제시하였다. 마지막으로 결론부분에는 DCP기반의 U-안전모니터링의 발전방향에 논하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.