DOI QR코드

DOI QR Code

Algorithm of Level-3 Digital Model Generation for Cable-stayed Bridges and its Applications

Level-3 사장교 디지털 모델 생성을 위한 알고리즘 및 활용

  • Received : 2019.12.06
  • Accepted : 2019.12.19
  • Published : 2019.12.31

Abstract

Digital models for a cable-stayed bridge are defined considering data-driven engineering from design to construction. Algorithms for digital object generation of each component of the cable-stayed bridge were developed. Using these algorithms, Level-3 BIM practices can be realized from design stages. Based on previous practices, digital object library can be accumulated. Basic digital models are modified according to given design conditions by a designer. Once design models are planned, various applications using the models are linked the models such as estimation, drawings and mechanical properties. Federated bridge models are delivered to construction stages. In construction stage, the models can be efficiently revised according to the changed situations during construction phases. In this paper, measured coordinates are imported to the model generation algorithms and revised models are obtained. Augmented reality devices and their applications are proposed. AR simulations in construction site and in office condition are tested. From this pilot test of digital models, it can be said that Level-3 BIM practices can be realized by using in-house modeling algorithms according to different purposes.

Keywords

References

  1. BSI (2013). PAS 1192-2 Specification for information management for the capital/delivery phase of construction projects using building information modelling.
  2. Fuzor Virtual Design Construction(VDC) 2019.
  3. HM Government (2015). Digital Built Britain, Level 3 Building Information Modeling - Strategic Plan.
  4. Lee, K. M., Lee, Y. B., Shim, C.S., Park, K.L. (2010). Bridge Information models for construction of a concrete box-girder bridge, Structure and Infrastructure Engineering, pp. 1-17.
  5. Gaunt, M.(2017). BIM Model-based design delivery, Tideway East, England, UK, Smart Infrastructure and Construction, 170(SC3), pp. 50-58.
  6. Park, S. J. Dang, N. S., Kang, H. R., Shim, C. S. (2017). Design and Constructability Improvement of 3D Concrete Formworks through Analysis of Construction Applications, Journal of Korea Institute of Building Information Modeling, 7(1), pp. 1-8.
  7. Park, S. J., Dang, N. S., Youn D. S., Lon, S., Shim C. S. (2018). Pre-construction Simulation of Precast Bridge Piers and Quality Management using Augmented Reality, Journal of Korea Institute of Building Information Modeling, 8(1), pp. 15-23.
  8. Ralph, G. K., John, I. M. (2013). The Uses of BIM : Classifying and Selecting BIM Uses. TheComputer Integrated Construction Research Group at Pennsylvania State, Version 0.9
  9. Shim, C. S., Dang, N.S., Park, S.J. (2018a). Three-Dimensional Information Delivery for Design and Construction of Prefabricated Bridge Piers, Structural Engineering International, 28(1), pp. 6-12. https://doi.org/10.1080/10168664.2018.1431378
  10. Shim, C. S., Jeon,C. H., Kang, H. R., Dang, N. S., Lon, S. (2018b). Definition of Digital Twin Models for Prediction of Future Performance of Bridges, Journal of Korea Institute of Building Information Modeling. 2(2), pp. 13-22.
  11. Shim, C. S., Kang, H. R, Dang, N. S, Lee, D. K. (2017). Development of BIM-based bridge maintenance system for cable-stayed bridges. Smart Structures Systems. 20(6), pp. 697-708. https://doi.org/10.12989/sss.2017.20.6.697
  12. Shim, C. S., Lee, K. M., Kang, L. S., Hwang, J, Kim, Y. H. (2012). Three-Dimensional Information Model-based Bridge Engineering in Korea. Structural Engineering International. 22(1), pp. 8-13.
  13. Succar, C. (2009). Building information modelling framework : A reasearch and delivery Foundation for industry stakeholders, Automation in Construction, 18(1), pp. 357-375. https://doi.org/10.1016/j.autcon.2008.10.003
  14. Unity 5.6.1f1 (64-bit), 2019.
  15. Vanlande, R., Nicolle, C., Cruz C. (2008). IFC and building lifecycle management, Automation in Construction, 18(1), pp. 70-78. https://doi.org/10.1016/j.autcon.2008.05.001
  16. Yabuki, N., Shitani, T. (2003). An IFC-Based Product Model for RC or PC Slab Bridges, Proceedings of the CIB W78's 20th International Conference on Information Technology for Construction, Waiheke Island, New Zealand, pp. 463-470.