A Study on Development of BIM-based Asset Management Model for Maintenance of the Bridge (교량의 유지관리를 위한 BIM기반 자산관리 모델 개발에 관한 연구)

  • Kang, Jong-Min;Lee, Dong-Youl;Park, Jong-Bum;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.3-11
    • /
    • 2012
  • The most of domestic bridge has an used life under 30 years, Future maintenance budgets can be expected to increase. However, because of bridge maintenance budgets are limited, demand for asset management being performed to achieve required performance within available budget is increasing. To perform effective asset management of bridges should be made the best use of information to occur in all phase of construction project. Therefore, the development of system and DB is required to support asset management by effective information management. The objective of this study is the development of the BIM-based bridge asset management model. Through previous research survey, BIM capabilities and asset management components were established and mutual linkages were examined. Bridge asset management model was composed of alternate assessment model. In addition, BIM-based asset management model was performed case studies to verify feasibility and applicability. The proposed model can be applied to a current bridge maintenance procedures and supported to perform effective bridge maintenance tasks within a limited budget.

ENHANCEMENT OF AVAILABILITY OF 4D SIMULATION BASED ON BUILDING INFORMATION MODEL TECHNOLOGY

  • Jong Jin Park;Eon Yong Kim;Hyun Cho;Han Jong Jun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.579-586
    • /
    • 2009
  • 4D simulation integrates the 3 dimensional model of a building with the construction schedule, and it leads to the possibility of virtually checking the construction process and the building itself in advance. However, the existing problem of 4D simulation is the difference between the demands of architects, engineers, and construction site workers in 4D simulation. This study suggests the possible way to enhance the availability of 4D simulation, considering more the practical demands from the construction site. In order to conduct this study, we build a 3D BIM model of a business-residential complex and link the model with the pre-defined construction schedule in order to make a 4D simulation. This study concludes with the optimized 4D simulation methodology based on BIM model considering the demands in perspective of the construction site. It would contribute to the harmonic collaboration among architects, engineers, and labors in the construction site when using 4D simulation based on BIM model.

  • PDF

Seismic Analysis Process of Steel Box girder Bridge based on BIM (강상자형 교량의 BIM기반 내진해석 프로세스)

  • Lee, Heon-Min;Lee, Jin-Kyoung;Yoo, Jae-Myoung;Shin, Hyun-Mock
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.4
    • /
    • pp.421-428
    • /
    • 2011
  • The communication of each others is lack between planing, design, construction and maintenance in domestic construction industry. This problem makes the omission of information and the loss of cost. So, the introduction of BIM can be the solution about that. BIM manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. This is done through 3D information model associated with a three-dimensional(3D) parametric CAD. This study proposes the seismic analysis process of steel box bridge for structural design of bridge construction project based on BIM. The additional process is needed for the purpose that structural data is inherent in the property information of 3D information model. This process has 3D modeling progress done by using the information decided in design phase. The design document of seismic analysis can be derived with the proposed process to steel box bridge.

Implementation of 3D Object Model considering Recycle-Design of PSC Box Girder (PSC 박스 거더의 Recycle-Design을 고려한 3차원 객체 모델 구현)

  • Cho, Sung-Hoon;Park, Jae-Guen;Lee, Heon-Min;Shin, Hyun-Mock
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.23 no.3
    • /
    • pp.325-330
    • /
    • 2010
  • In the fields of design within civil engineering, BIM based Utilization of 3D object model is still far from commercialization. In this paper, BIM based 3D object model is composed for PSC box girder, super structure of railway bridge. The basic unit of the model is part model. The part model is the minimum unit model. And it has hierarchy to reflect the characteristics of structures. Change orders of structural designer must be reflected quickly in the 3D object model. Repetitive change orders are occurred in actual construction process. To prepare that, we classified design variables to parameters. Change orders of structural designer can be reflected quickly in the 3D object model because those parameters are related with information of 3D object model. In this paper, we studied various benefits of BIM based design method with 3D object model in the fields of design within civil engineering, and proposed the efficient application method of 3D object model for PSC box girder.

Analysis of Substitutability of 2D Electronic Drawing Using the BIM Model -Focusing on the Electronic Delivery System in Road Field- (BIM 모델을 활용한 2D 전자도면 대체 가능성 분석 -도로분야 전자납품체계를 대상으로-)

  • Seo, Myoung-Bae;Ju, Ki-Beom;Kim, Nam-Gon
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.11
    • /
    • pp.441-450
    • /
    • 2013
  • With the recent increase in BIM orders in civil engineering, project owners are supplied with BIM-based products. Due to the lack of related guidelines, however, and the vague regulations on the creation and level of drawings as well as on the products list, many owners receive BIM-based products along with the existing 2D products. This can lead to task overlapping by designers or contractors and can cause the owners to have more data to maintain. If the existing 2D-based electronic supply system is changed to a BIM ordering system to reduce such a burden, it is necessary to examine the 2D products that can be extracted from or substituted for the BIM model so as to minimize the overlapping products. Therefore, in this study, BIM modeling of road construction projects whose enforcement plan by the Ministry of Land and Transportation has been completed was conducted, and based on the study results, the possibility of extracting 2D drawings from a total of 3,767 drawing items was determined. The results showed that 2,549 drawing items (67%) could be extracted as 2D drawings from the BIM model, and in particular, drawing items related to general connection work, earthwork, and amenities work could be most effectively substituted. The results of this study can be used as the base data for reducing the number of 2D drawings or substituting them in developing a BIM-based product supply system in the future.

Derivation of BIM/GIS Platform Application Scenarios and Definition of Specific Functions in Construction Planning and Design (건설 기획 및 설계 단계 BIM/GIS 통합 플랫폼 활용을 위한 시나리오 도출 및 상세기능 정의)

  • Youn, Junhee;Kang, Tae-Wook;Choi, Hyun-Sang;Kim, Changyoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7340-7349
    • /
    • 2014
  • BIM (Building Information Model) and GIS (Geographic Information System) are applied widely to all stages (Planning - Design - Building - Maintenance) of construction. Recently, research for designing an integrated BIM/GIS platform has been conducted to determine the synergy effects. This paper reports the derivation of BIM/GIS platform application scenarios and definition of specific functions in construction planning and design phases. First, BIM/GIS application scenarios and platform functions are derived for each phase based on an analysis of business affairs. Second, SW functions, which compose platform function, are defined. In the construction planning phase, location selection and route location business affairs were analyzed. Preliminary design and detailed design business affairs were analyzed in the construction design phase. The result of this research can be used for BIM/GIS integrated platform design in the future.

Extension of the IFC Schema for Road Subsidiary Facility (도로 부대시설 수용을 위한 IFC 스키마 확장 개발)

  • Cho, Geun-Ha;Ju, Ki-Beom
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7385-7392
    • /
    • 2014
  • Extension IFC schema of subsidiary facilities were developed for the purpose of establishing an information model standard for roads. The IFC entities, types and properties for subsidiary facilities were defined through an analysis of the road design documents for the extraction physical component and design information. The converter and viewer for applying the new schema were then developed. Subsidiary facilities BIM models were converted to new IFC models to verify the research results. Standard BIM-based delivery and verification systems are enabled by using a standard model converted by new schema. Furthermore, it can establish an open BIM environment using an IFC over the entire life cycle of the civil engineering project.

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

BIM-Based Integrated Module for Apartment Environmental Performance and Energy Analysis (BIM기반 공동주택 환경성능 및 에너지 해석 시스템 통합 개발)

  • Suh, Hye-Soo;Lee, Soo-Hyun;Lim, Jae-Sang;Choi, Cheol-Ho
    • Journal of KIBIM
    • /
    • v.4 no.2
    • /
    • pp.1-9
    • /
    • 2014
  • As interest in green building has increased, construction market has evolved through BIM-based architecture also, BIM-based technologies have been developed simultaneously. Due to this aspect, the need of environmental analysis software utilizing BIM data became essential. This study shows that BIM-based integrated module provides objective analysis to proceed quick decision-making for a proposal. In addition to that, this integrated module creates a model through BIM data to analyze and report residential environment and energy consumption such as, daylight, view, ventilation and privacy in order to practically apply the BIM technology from the schematic design.

Definition of requirements for creating BIM models for the development of SCAN to BIM guidelines (SCAN to BIM 지침 개발을 위한 BIM 기반 조달프로세스와 모델의 요구사항)

  • Kim, Do-Young
    • Journal of KIBIM
    • /
    • v.11 no.1
    • /
    • pp.11-20
    • /
    • 2021
  • In the domestic construction field, BIM and 3D scanning technology are combined to perform reverse engineering. It is necessary to develop guidelines or processes for domestic situations through 3D scenario investigation and reverse engineering projects using BIM. Using the case of actual construction service that performed reverse engineering, we analyze the areas that need to be reinforced compared to the existing advanced cases when creating guidelines. It is recommended to encourage the convergence between 3D scanning and BIM, and to define the requirements and levels of the BIM model in the procedure.