• Title/Summary/Keyword: BIM based Architectural Design

Search Result 171, Processing Time 0.024 seconds

A Framework Development for BIM-based Object-Oriented Physical Modeling for Building Thermal Simulation (객체지향 물리적 모델링 기법을 활용한 BIM기반 통합 건물에너지 성능분석 모델 구축 및 활용을 위한 프레임워크 개발 - 건물 열부하 시뮬레이션 중심으로 -)

  • Jeong, WoonSeong
    • KIEAE Journal
    • /
    • v.15 no.5
    • /
    • pp.95-105
    • /
    • 2015
  • Purpose: This paper presents a framework development for BIM (Building Information Modeling)-based OOPM (Object-Oriented Physical Modeling) for Building Thermal Simulation. The framework facilitates decision-making in the design process by integrating two object-oriented modeling approaches (BIM and OOPM) and efficiently providing object-based thermal simulation results into the BIM environment. Method: The framework consists of a system interface between BIM and OOPM-based building energy modeling (BEM) and the visualization of simulation results for building designers. The interface enables a BIM models to be translated into OOPM-based BEM automatically and the thermal simulation from the created BEM model immediately. The visualization module enables the simulation results to be presented in BIM for building designers to comprehend the relationships between design decisions and the building performances. For the framework implementation, we utilized the Modelica Buildings Library developed by the Lawrence Berkeley National Laboratory as a thermal simulation solver. We also conducted an experiment to validate the framework simulation results and demonstrate our framework. Result: This paper demonstrates a new methodology to integrate BIM and OOPM-based BEM for building thermal simulation, which enables an automatic translation BIM into OOPM-based BEM with high efficiency and accuracy.

Establishment of Rebar Quantity Estimation in BIM-based Initial Design Phase (BIM기반 초기 설계 단계 철근 물량 산출 프로세스 구축)

  • Song, Chi-Ho;Kim, Chee-Kyeong;Lee, Si Eun;Choi, Hyunchul
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.29 no.5
    • /
    • pp.447-454
    • /
    • 2016
  • In the meantime, looking at the present status of how to estimationte the quantity of rebar based on 3D BIM getting the limelight in these days, commercial BIM tools provide rebar modeling functions however it takes a vast amount of modeling time for modeling of rebar in use of that function hence there is no BIM software at present for practical use. Therefore, in this study, we organized and presented a practical rebar quantity estimationtion process in BIM-based design work-site and intended to develop a program named Rebar Automatic Arrangement Program - hereinafter called RAAP - which enables automatic rebar arrangement based on much more precise cross-sectional information of bars in column, beam, slab and wall than the one from existing 2D method under the conditions without any cross-sectional information in the initial design phase. In addition, we intended to establish rebar quantity estimationtion process in the initial design phase through interworking of modeling & quantity estimationtion functions in consideration of joint, anchoring length of BuilderHUB as a BIM software with RAAP. The results from this study are practical in developing a technology that is able to estimationte quantity with more improved reliability than the one from existing 2D-based methods with less effort when the quantity of framework is estimationted in the uncompleted state of cross-sectional design for structural members in the initial design phase of a construction project. And it is expected that it could be utilized as a basic study from which a reasonable quantity estimationtion program can be established in the initial design phase.

A Study on the Automation Process of BIM Library Creation of Air Handling Unit - Development of Revit API module for efficiency and uniformity of library creation - (공기조화기의 BIM 라이브러리 생성 자동화 프로세스에 관한 연구 - 라이브러리 생성의 효율성과 통일성 확보를 위한 Revit API 모듈 개발 -)

  • Kim, Han-Joo;Choi, Myung-Hwan;Kim, Jay-Jung
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.4
    • /
    • pp.75-82
    • /
    • 2018
  • BIM(Building Information Modeling) based design process can initiatively conduct a task through all phases from early design step to construction and maintenance step. Also BIM efficiently manage the building's energy by reflecting 3D design and construction life cycle. This paper proposes an efficient process to build AHU's BIM-based library. This study involves analyzing an AHU model for development of design module, and making the template model using the same 12 parts including the shapes of ducts, doors and frames. In consideration of each shape's direction and the status of existence, which are detailed shapes of parts upon making the template model, all the shapes of the AHU model can be expressed. By applying parametric modeling to the template model, a quick and precise modification and transformation can be conducted, thus the efficiency is enhanced. A user selects an AHU model from a 2D model selection program, and extracts shape information. The final AHU shape is completed through the automation work of unnecessary shape deletion by bringing the extracted shape information to the template model. This enables the user to build efficient AHU's BIM-based library, since the quick and precise modification and transformation of the template model are possibile, and all AHU model shapes can be expressed.

An Estimation Model of Historical Cost Using BIM Library for Road Project (도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축)

  • Moon, HyounSeok;Ju, KiBeom
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.4
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

BIM Model Quality Improvement by Case Study Analysis (품질검증 사례 분석을 통한 BIM모델 품질개선 방안)

  • Kwon, O-Cheol;Cho, Joo-Won;Jo, Chan-Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.3
    • /
    • pp.164-174
    • /
    • 2012
  • The recent introduction of BIM technology has raised the interest on the BIM quality assurance and management more than ever. This study aims to consider the ways of BIM quality improvement by analyzing the most frequent issues rising from multiple BIM projects. For this purpose, the 12 test models from BIM education program hosted by buildingSMART Korea are investigated based on the requirements in the public BIM guidelines. All the BIM issues generated are categorized by the criteria applied and analyzed for each kind of building element. The results showed that more than half of the issued at least could be cleared out by improving modeling habits and technical guides.

Collaborative Process to Facilitate BIM-based Clash Detection Tasks for Enhancing Constructability

  • Seo, Jung-Ho;Lee, Baek-Rae;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.299-314
    • /
    • 2012
  • One of reasons for introducing Building Information Modeling (BIM) is to support clash detection tasks by means of a 3D product model. In the conventional construction project process, clashes have been found during construction phase. However, it can cause cost overrun and time delay. In order to investigate and correct clash detections at design phase, relevant business process and guide for this task should be provided. This study aims to identify hindrances in clash detection tasks at the design phase and analyze its current process using IDEF0 model. Despite the convenience of IDEF0 as a systems analysis tool, professional participants might have difficulties to understand their own tasks according to business process. For this reason, in this research, Business Process Model and Notation (BPMN) is introduced to provide ideal process and required decision making governance. The provide BPMN model will provide insights for a BIM-based collaborative environment to enhance the constructability through the construction project.

A Study on the Adaptability of BIM-based Integrated Building Design Process in Domestic Architectural Design Firms (BIM기반 통합설계프로세스의 국내 적용 가능성에 관한 연구)

  • Lee, Jin-Hee;Jun, Han-Jong
    • Korean Institute of Interior Design Journal
    • /
    • v.16 no.6
    • /
    • pp.19-27
    • /
    • 2007
  • As AEC(architecture, engineering and construction) industry becomes larger and more complex, much information is going into each part and phase. Therefore, the existing building design process has to change and collaboration is emphasized among participants in various fields. The purpose of this study is to compare and analyze existing building design process and integrated building design process based on BIM using a IDEF0 methodology. And then, it establishes a desirable domestic integrated building design process application plan focusing on the design phase of domestic cases. As a result of analysis, flowing conclusions are included ; Firstly, problems occur on the existing building design process that are accomplished with focusing on the outcome. It makes much errors because of 2D-based information. Another problems is that collaboration doesn't go on smoothly. But, integrated building design process is accomplished with the collaboration and the coordination which pursues change and perfects cooperation. Secondly, BIM is a process of effecting optimum integrating, re-using information, and expense reduction throughout the life-cycle of a building. Moreover, it establishes a basis for the integrated building design process to build a collaboration system.

A Study on the Evaluation Items of BIM Process Maturity Measurement Model (BIM 프로세스 성숙도 측정 모델의 평가항목에 대한 연구)

  • Lee, Jae-sung;Ock, Jong-ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.3
    • /
    • pp.281-295
    • /
    • 2016
  • Lately, the management of domestic BIM performance is quite lacking, as the evaluation and management data from successful cases of BIM implementation both on projects and in companies, and related effects (time, cost and other physical gains) are not well kept for future use in BIM development. In order to overcome the above obstacles, a systematic approach to evaluating BIM adoption with focus on particular elements like BIM implementation environment and processes, and the physical factors yielded by BIM, is necessary. In this study, objective and detailed assessment indicators and weights that are appropriate for the domestic situation were derived through research for purposes of developing a web-based BIM maturity measurement program that is tailor-made for the Korean construction atmosphere. Through a company's self-maturity measurement, excellent quality of BIM deliverables and output can be achieved and managed. Furthermore, the domestic BIM capacity can gradually increase since design firms' BIM capability can be judged during procurement basing on measurement indicators.

BIM Clash Quality Control by Expert System (전문가시스템을 활용한 BIM 물리적 품질 검토방법에 관한 기초연구)

  • Kwon, Ocheol;Cho, Joowon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.1
    • /
    • pp.22-35
    • /
    • 2015
  • As BIM in the construction industry has been activated, the building information reliability - design quality is getting important. Meanwhile, it is still difficult to reflect the quality control experience to the modelling since the current methods are strongly rely on a certain BIM tools or systems with formal logics and limited information for quality checking. Therefore, the checking results may contain a lot of issues unrelated or unnecessary to the BIM qualities. In order to overcome this problem, we firstly performed clash check using a conventional checking tool and secondly interpret the results by an Expert System to filter out more meaningful results. We found this study gave a confirmation that it is possible to improve clash quality control when we link the expert experience to the rule-based automatic checking system.

Version Control System for BIM-based Collaborative Architectural Design (BIM 기반의 협력적인 건축 설계를 위한 Version Control 시스템)

  • Bae, Hong-Min;Kim, Byung-Seo;Chung, Jae-Hee
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.17 no.3
    • /
    • pp.275-282
    • /
    • 2017
  • Revit program is one of the architectural design programs based on the BIM (Building Information Modeling) technology, which is attracting attention as a next-generation three-dimensional architectural design technique. Revit is a program that enhances the information input side and makes it easy to understand components by making it an object called an information family of components from the design stage, but there is no program that easily compares the drawing output files extracted from this program. It is difficult to analyze the changes to the same drawings modified at the time of collaboration and easily share the drawing information. In this paper, we propose and implement a version management system for the output files on the same drawing, so that the parallel collaboration work of output drawing files through Revit can be efficiently performed. We propose an improved KMP algorithm.