In order to apply the BIM technology effectively and efficiently during the life-cycle of project, it is important to deliver a accurate information on BIM from designer, and it should be used effectively at construction or maintenance stage. However, stakeholders have created a new BIM model at each phase in many practise adopting BIM, not used BIM generated in design stage. Because they have different purposes for using BIM, and deliver the BIM model without the sufficient explanation or application. It is necessary to define the range of usable BIM in construction phase with analyzing clearly the BIM created in design phase, and determining the difference with required BIM in construction phase. Therefore, this study propose a method for construction c
The usage of Building Information Modelling (BIM) in building projects has enabled improvement in project planning, implementation and collaboration process amongst various stakeholders within architecture, engineering and construction (AEC) industry. However, variations exist in the current practices of BIM implementation and coordination process in the industry. These variations result in inconsistent degree of BIM use across the construction industry. This inconsistency gives rise to several managerial and technological challenges such as data interoperability issues and purposeful integration and exchange of information within the BIM components. In order to tackle the issue, it is essential to analyse the different BIM approaches employed by the industry practitioners. BIM guidelines serve as a critical link between the BIM model, and its subsequent execution. They therefore provide the best reflection of BIM application and processes. This research paper aims to address the variations existing in BIM practices across the construction industry. It includes an extensive study of 21 existing, publicly available BIM-based guidelines in order to establish an understanding of the present state of practice and deduce issues and concerns related to them. All guidelines analysed in this paper are first categorised based on authorship and the release date for efficient comparison. The points of similarity and difference between them are thereby realized and outlined. In addition, the transition of project implementation process from traditional methods to BIM technology is also explained. The existence of inconsistencies in the BIM guidelines reviewed in this paper reflects the need of a BIM 'Code Compliance Check'. The Code Compliance Check will serve as a regulatory project guideline that will further improve the potential of BIM by incorporating a consistent BIM modelling methodology for the entire construction industry.
In the current 2D-based design, design reliability is lowered due to interference and inconsistency between plans, errors in drawings and quantities, etc. At the time of transition to BIM-based 3D design, it is necessary to expand the reliability and usability of BIM by eliminating these errors from the design stage through securing the quality of the BIM digital model. Therefore, in the railway infrastructure design stage, the quality management process and standards of the BIM digital model were defined and quality management index were developed. Based on the rule extracted from the quality management index, a pilot quality management was conducted in connection with the commercial Model-Checker rule, problems and improvement plans were derived, and a rule-based automated quality management plan was prepared.
The main purpose of this paper is to find the phase-in of BIM adoption by focusing on the level of integration. BlM should be aimed at integration and collaboration of all parties furnishing design and construction services to increase the productivity. Therefore, the degree and depth of integration for project collaboration is very important to BlM design process. One of the key advantages of full integration is that is to facilitates the development of detailed information much earlier in the entire design process to improve collaboration among stakeholders. Such integrated use is the ultimate method, but even so, it's not the precondition of BlM. One of the key advantages of relatively low integration as a transition phase is to adopt the BlM earlier than full integration. Such transitional and non-integrated BIM can also reduce the possibility of trial and error in BlM adoption. Therefore, this paper focused on non-integrated use of BlM as a substitute of full IPD by analyzing obstacles in BIM adoption.
본 연구는 BIM 도입 효과를 극대화할 수 있는 현장 적용성 확보에 중점을 둔 철근콘크리트 골조공사의 BIM 견적모델 작성과 BIM기반 견적 업무 프로세스를 표준화한 가이드라인을 제시하는 것을 목적으로 한다. 이를 위하여 기존 지침 및 가이드라인의 BIM 견적모델 작성 범위 및 방식을 고찰하고, 철근콘크리트공사 수량산출 견적 지침 및 기준을 분석하며, 기존 견적 방식과 BIM기반 견적 방식에 대해 비교분석한다. 이를 통하여 BIM기반 견적 업무의 표준 프로세스를 수립하고, 콘크리트/거푸집/철근 견적모델의 작성 및 수량산출 기준을 도출하며, 철근콘크리트공사 BIM기반 수량산출 및 견적 업무의 성과물 목록 및 양식을 제시한다. 본 연구를 통해 작성된 BIM 견적 가이드라인은 BIM기반의 새로운 기술환경에 대한 진입장벽을 낮추고, 견적의 정확성 극대화를 통한 원가절감을 실현하며, BIM 업무와 건설산업의 생산성과 부가가치를 증대시켜, 궁극적으로 건설사업 전 생애주기에서 생산되는 정보를 통합 관리할 수 있는 기반을 구축하고 BIM 생태계를 조성하는데 기여할 것으로 기대한다.
최근 설계 협업 시스템의 점차 발전됨과 함께, BIM 기반의 정보교환이 차세대 건설 프로젝트의 성공적 수행에 주요 요소로써 작용하고 있다. BIM 협업 중 발생하는 데이터 호환 문제에 대한 해결책을 제시하고 있는 많은 연구들이 수행되고 있지만, 여전히 다양한 BIM 저작도구로부터 생산되는 BIM 데이터의 교환은 디자인과 엔지니어링 분석 단계에서 발생하고 있다. 그리하여 본 논문은 현업 설계 프로세스 내에서 발생하는 데이터 정보 교환에 대한 문제점의 발생 원인을 분석하고 BIM 기반의 설계 협업 환경의 개선을 위한 BIM 정보 교환 프레임워크를 제안하였다. Open-BIM 기반의 정보 교환 환경의 정착을 저해하는 요소를 발견하기 위해서는 현재와 앞으로 수행될 BIM 기반 설계 협업 프로세스 환경변화에 대한 분석이 우선적으로 수행되어야 한다. 협업 설계 프로세스 내 원활한 정보 교환의 저해 요인 분석을 통해 본 연구는 Open-API와 IFC기반의 BIM 협업 지원 시스템을 제안한다. BIM 무결성 피드백 시스템이라 명명된 API 솔루션은 IFC 기반의 데이터 교환에서 발생하는 상호 불일치성을 판별하고 report를 작성해 주는 기능을 수행한다. 또한, 본 연구는 IFC기반의 정보 교환 프레임워크 시스템을 제안하였으며, 앞서 언급한 API를 탑재하고 있으며 BCF 플러그 인을 지원하는 시스템을 통해 BIM 설계 협업 단계 내에서 정보 교환의 유연성을 도모하고 있다.
The 9th International Conference on Construction Engineering and Project Management
/
pp.94-102
/
2022
Construction workers are engaged in many activities that may expose them to serious hazards, such as falling, unguarded machinery, or being struck by heavy construction equipment. Despite extensive research in building information modeling (BIM) for safety management, current approaches, detecting safety issues after design completion, may limit the opportunities to prevent predictable and potential accidents when decisions of building materials and systems are made. In this respect, this research proposes a proactive approach to detecting safety issues from the early design phase. This research aims to explore accident precursors and integrate them into BIM for tracking safety hazards during the design development process. Accident precursors can be identified from construction incident reports published by OSHA using a text mining technique. Through BIM-integrated accident precursors, construction safety hazards can be identified during the design phase. The results will contribute to supporting a successful transition from the design stage to the construction stage that considers a safe construction workplace. This will advance the body of knowledge about construction safety management by elucidating a hypothesis that safety hazards can be detected during the design phase involving decisions about materials, building elements, and equipment. In addition, the proactive approach will help the Architecture, Engineering and Construction (AEC) industry eliminate occupational safety hazards before near-miss situations appear on construction sites.
최근 세계적으로 크게 발전되고 있는 비정형 건축은 디지털 기술에 크게 의존하고 있으며, 이를 실현하기 위한 디지털 기술 또한 빠른 속도로 발전하여 왔다. 본 연구에서는 디지털기술이 적용된 비정형 건축 작품들이 출현하기 시작한 1990년대부터 현재까지의 건축 사례들과 적용된 디지털 기술의 시대적 특징을 살펴보고 디지털 기술의 현 주소와 나아갈 방향을 제시하였다.
본 연구는 공공시설공사에서 VE의 코스트모델과 공사현장의 진도관리, 그리고 공사비 분쟁에서 공간정보의 부재로 인한 공종별 공사비 내역 정보의 한계를 인식하고, 이를 극복하기 위하여 공사비의 인식체계를 공간단위로 전환하는 개선 방안의 하나로 제안하는 건축물 세부공간단위의 공사비 원가계산방법에 관한 것이다. 본 연구를 통해 제시한 공간단위의 공사원가 산정 시스템은 공사비를 구성하는 모든 공간 단위에서, 모든 공종, 공종을 구성하는 모든 자재, 노무 및 모든 비용 항목에 대한 정밀하고도 다차원적인 파악이 가능하게 하는 것이다.
In this paper, we would like to share our ongoing research on global population and demographic shifts and the corresponding need for diverse responses. As population growth varies worldwide, the pressing issue is the current global housing shortage. The USA alone lacks 4 million homes, underlining the urgency for new construction and renewal of existing. Our focus is primarily on new building processes, which must also incorporate elements of renewal for future sustainability. Our research addresses several key questions: How will roles for construction professionals change? What should be the primary goal of the design process? What types of technologies are currently available, and which aspects of the process can be enhanced with AI? A significant part of our study is exploring sustainable building methods that reduce embodied carbon and increase speed of construction. Our goal is to extend the transition from smart homes to cities, analyzing the evolution towards smart communities and cities. A critical aspect of our research is the 'kit of parts concept, involving prefabrication and modular construction. This approach is essential for both rebuilding and new projects, potentially lowering costs in manufacturing and design for long term. Lastly, we present a detailed comparison of the construction industry with manufacturing.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.