DOI QR코드

DOI QR Code

A Proposal for Using BIM Model Created in Design to Construction Phase - Case Study on preconstruction adopting BIM -

건축 설계 BIM 모델의 시공단계 활용성 향상을 위한 BIM 운영 방안 제시 - 시공전단계 BIM 적용 사례를 중심으로 -

  • Received : 2015.09.23
  • Accepted : 2015.11.26
  • Published : 2015.12.31

Abstract

In order to apply the BIM technology effectively and efficiently during the life-cycle of project, it is important to deliver a accurate information on BIM from designer, and it should be used effectively at construction or maintenance stage. However, stakeholders have created a new BIM model at each phase in many practise adopting BIM, not used BIM generated in design stage. Because they have different purposes for using BIM, and deliver the BIM model without the sufficient explanation or application. It is necessary to define the range of usable BIM in construction phase with analyzing clearly the BIM created in design phase, and determining the difference with required BIM in construction phase. Therefore, this study propose a method for construction c

Keywords

References

  1. BIM Forum (2013). Level of development specification for building information models version 2013. Available online: www.BIMforum.org/lod(2015.03.10.)
  2. Bytheway, Andy (2014) Investing in Information: The Information Management Body of Knowledge, Geneva: Springer.
  3. Eastman, C., Teicholz, P. Sacks, R. Liston, K. (2008). A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors. John Wiley & Sons. 39-41.
  4. Kim, J., Lee, M., Seo, J., Lee, K. & Lim, J. (2013). Ideality and Reality of BIM; A General Contractor's Perspective. Proceeding of Korea Institute of BIM, 3(1), 9-10.
  5. Kim, J., & Ock, J. (2009). A Study on the Development of the Problem Improvement Directions in Enhancing BIM Data Interoperability through IFC. Korean Journal of Construction Engineering and Management, 10(6), 88-98.
  6. Kim, K. & Yu, J. (2015). Integrated Information Management for Composite Object Properties in BIM. Korean Journal of Construction Engineering and Management, 16(2), 97-105. https://doi.org/10.6106/KJCEM.2015.16.2.097
  7. Kim, Wahsung (2010) Revealing Issues and Prospects of Domestic Construction by Analysis of BIM Case Studies, Architectural institute of korea, 54(1), p.65-69.
  8. Lee, Gang (2011) 43가지 질문으로 읽는 BIM, Pixelhouse.
  9. Monteiro, A. & Martins, J. (2013). A survey on modeling guidelines for quantity takeoff-oriented BIM-based design. Automation in Construction, 35, 238-253. https://doi.org/10.1016/j.autcon.2013.05.005
  10. Park, K. H., Kang, M. L., Lee, B. H., Chin, S. Y., Choi, C. H. (2014) The analysis of the effect on BIM adoption and implementation : Korea Land Housing Corporation headquarter project, KBIM, pp.48-55.
  11. Park, S. & Kim, I. (2014). OpenBIM-based Building Information Management System According to Information Level. Journal of the Architectural Institute of Korea, Planning and Design Section, 30(12), 41-48.
  12. Redmond, A., Hore, A., Alshwi, M., & West, R. (2012). Exploring how information exchanges can be enhanced through cloud BIM. Automation in construction, 24, 175-183. https://doi.org/10.1016/j.autcon.2012.02.003
  13. Shin, J., Kwon, S., Lee, K., Choi, S. & Kim, J. (2015). A Study of the Establishment of Framework for Information Exchange based on IFC Model in Domestic Collaborative Design Environment. Korean Journal of Construction Engineering and Management, 16(1), 24-34. https://doi.org/10.6106/KJCEM.2015.16.1.024
  14. Olofsson, T., Lee, G., Eastman, C., & Reed, D. (2007). Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing.

Cited by

  1. 국내 MEP 분야 BIM 활용 실태 조사 및 실무 적용 활성화 방안 제시 vol.10, pp.4, 2015, https://doi.org/10.13161/kibim.2020.10.4.070