A Proposal for Using BIM Model Created in Design to Construction Phase - Case Study on preconstruction adopting BIM - (건축 설계 BIM 모델의 시공단계 활용성 향상을 위한 BIM 운영 방안 제시 - 시공전단계 BIM 적용 사례를 중심으로 -)

  • Yoon, Su-Won;Kim, Seong-ah;Choi, Jong-Moon;Keum, Dae-Youn;Jo, Chan-Won
    • Journal of KIBIM
    • /
    • v.5 no.4
    • /
    • pp.1-10
    • /
    • 2015
  • In order to apply the BIM technology effectively and efficiently during the life-cycle of project, it is important to deliver a accurate information on BIM from designer, and it should be used effectively at construction or maintenance stage. However, stakeholders have created a new BIM model at each phase in many practise adopting BIM, not used BIM generated in design stage. Because they have different purposes for using BIM, and deliver the BIM model without the sufficient explanation or application. It is necessary to define the range of usable BIM in construction phase with analyzing clearly the BIM created in design phase, and determining the difference with required BIM in construction phase. Therefore, this study propose a method for construction c

An Analytical Appraisal of Building Information Modelling (BIM) Guidelines to Identify Variations in the Procedures

  • Das, Dakshata;Moon, Sungkon
    • Journal of KIBIM
    • /
    • v.6 no.3
    • /
    • pp.1-14
    • /
    • 2016
  • The usage of Building Information Modelling (BIM) in building projects has enabled improvement in project planning, implementation and collaboration process amongst various stakeholders within architecture, engineering and construction (AEC) industry. However, variations exist in the current practices of BIM implementation and coordination process in the industry. These variations result in inconsistent degree of BIM use across the construction industry. This inconsistency gives rise to several managerial and technological challenges such as data interoperability issues and purposeful integration and exchange of information within the BIM components. In order to tackle the issue, it is essential to analyse the different BIM approaches employed by the industry practitioners. BIM guidelines serve as a critical link between the BIM model, and its subsequent execution. They therefore provide the best reflection of BIM application and processes. This research paper aims to address the variations existing in BIM practices across the construction industry. It includes an extensive study of 21 existing, publicly available BIM-based guidelines in order to establish an understanding of the present state of practice and deduce issues and concerns related to them. All guidelines analysed in this paper are first categorised based on authorship and the release date for efficient comparison. The points of similarity and difference between them are thereby realized and outlined. In addition, the transition of project implementation process from traditional methods to BIM technology is also explained. The existence of inconsistencies in the BIM guidelines reviewed in this paper reflects the need of a BIM 'Code Compliance Check'. The Code Compliance Check will serve as a regulatory project guideline that will further improve the potential of BIM by incorporating a consistent BIM modelling methodology for the entire construction industry.

Rule-based Review and Automated Quality Management Process of BIM deliverables for Railway Infrastructures (철도인프라 BIM 성과물의 품질검토 절차 및 룰 기반 적용성 검토)

  • Kang, Jeon-Yong;Hasan, Syed Mobeen;Min, Ji-Sun;An, Joon-Sang;Choi, Jae-Woong
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.23-34
    • /
    • 2022
  • In the current 2D-based design, design reliability is lowered due to interference and inconsistency between plans, errors in drawings and quantities, etc. At the time of transition to BIM-based 3D design, it is necessary to expand the reliability and usability of BIM by eliminating these errors from the design stage through securing the quality of the BIM digital model. Therefore, in the railway infrastructure design stage, the quality management process and standards of the BIM digital model were defined and quality management index were developed. Based on the rule extracted from the quality management index, a pilot quality management was conducted in connection with the commercial Model-Checker rule, problems and improvement plans were derived, and a rule-based automated quality management plan was prepared.

A study on the non-integrated use of BlM (비통합적 BlM의 적용 가능성에 관한 연구)

  • Choi, Jong-Chon;Kim, Khil-Chae
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.8 no.2
    • /
    • pp.21-28
    • /
    • 2008
  • The main purpose of this paper is to find the phase-in of BIM adoption by focusing on the level of integration. BlM should be aimed at integration and collaboration of all parties furnishing design and construction services to increase the productivity. Therefore, the degree and depth of integration for project collaboration is very important to BlM design process. One of the key advantages of full integration is that is to facilitates the development of detailed information much earlier in the entire design process to improve collaboration among stakeholders. Such integrated use is the ultimate method, but even so, it's not the precondition of BlM. One of the key advantages of relatively low integration as a transition phase is to adopt the BlM earlier than full integration. Such transitional and non-integrated BIM can also reduce the possibility of trial and error in BlM adoption. Therefore, this paper focused on non-integrated use of BlM as a substitute of full IPD by analyzing obstacles in BIM adoption.

  • PDF

BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Reinforced Concrete Structures (철근콘크리트골조 BIM기반 수량산출 및 견적 가이드라인 수립)

  • Joo, Seon U;Kim, Chee-Kyeong;Kim, Si-Uk;Noh, Jun-Oh
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.6
    • /
    • pp.567-576
    • /
    • 2017
  • The object of this research is an establishment of BIM-based quantity takeoff(QTO) and cost estimation guidelines for reinforcement concrete structures focused on improvement of field applicability in transition period from 2D drawing-based environment to 3D BIM-based environment. Preliminary studies on existing guidelines and standards for BIM modeling, QTO and cost estimation of reinforcement concrete structures are performed, and then a standardization of BIM-based cost estimation process is proposed through comparative analysis between 2D drawing-based cost estimation process and 3D BIM-based. In addition, modeling, QTO, and cost estimation processes of cost-BIM model for RC structures are conducted. The contributions of this research and the guidelines suggested by this research are 1) lowering barriers to entity to the new BIM-based environment for small size companies, 2) reducing construction cost by a close estimate, 3) establishing the foundation for integrated management of informations through construction project life cycle, 4) and ultimately, developing the BIM ecosystems.

A Study of the Establishment of Framework for Information Exchange based on IFC Model in Domestic Collaborative Design Environment (국내 협업 설계 환경에서의 IFC기반 정보 교환 프레임워크 구축에 관한 연구)

  • Shin, Joonghwan;Kwon, Soonwook;Lee, Kyuhyup;Choi, Sangduck;Kim, Jinman
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.24-34
    • /
    • 2015
  • As recent multilateral collaboration design system has been advanced, BIM based data exchange is a key factor for successful next generation building project. Even though many studies have been trying to set up a data compatibility system for collaboration, There are still a lot of problem in data exchange between design and engineering phase. Therefore, In this study, we analysis causes of problem for information exchange and suggest a IFC based Information exchange framework for improving BIM based design collaboration environment. In order to find out problems that hinder establishment of advanced open BIM information exchange, proper analysis about transition of process from current and to-be BIM based design collaboration process is important, at first. From analysis of main obstacles to information exchange, this research suggests solution plan using open API and IFC based BIM collaboration supporting system. The suggested open API solution named Integrity feedback system perform a role making up for weak point derived from IFC based data exchange. And main system suggestion about framework for IFC based information exchange reflect technological system support, requirement of function for collaboration including API/BCF plug-in.

Prevention through Design (PtD) of integrating accident precursors in BIM

  • Chang, Soowon;Oh, Heung Jin;Lee, JeeHee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.94-102
    • /
    • 2022
  • Construction workers are engaged in many activities that may expose them to serious hazards, such as falling, unguarded machinery, or being struck by heavy construction equipment. Despite extensive research in building information modeling (BIM) for safety management, current approaches, detecting safety issues after design completion, may limit the opportunities to prevent predictable and potential accidents when decisions of building materials and systems are made. In this respect, this research proposes a proactive approach to detecting safety issues from the early design phase. This research aims to explore accident precursors and integrate them into BIM for tracking safety hazards during the design development process. Accident precursors can be identified from construction incident reports published by OSHA using a text mining technique. Through BIM-integrated accident precursors, construction safety hazards can be identified during the design phase. The results will contribute to supporting a successful transition from the design stage to the construction stage that considers a safe construction workplace. This will advance the body of knowledge about construction safety management by elucidating a hypothesis that safety hazards can be detected during the design phase involving decisions about materials, building elements, and equipment. In addition, the proactive approach will help the Architecture, Engineering and Construction (AEC) industry eliminate occupational safety hazards before near-miss situations appear on construction sites.

  • PDF

The Transition of Digital Technologies for Irregular Shaped Buildings (비정형 건축물 구현을 위한 디지털 기술의 변천에 관한 연구)

  • Ryu, Jeong-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.9
    • /
    • pp.4210-4215
    • /
    • 2011
  • The irregular shaped buildings have depended on the digital technology for their design and construction. The digital technology also has been developed for years at fast pace. This paper examined the cases of the irregular shaped buildings from 1990, when the result of the architectural works were begun to emerge to the world, up to the present and characteristics of the digital technology of those periods.

A Study on the Cost Estimating Method based on Spatial Unit Focused on Improving Limitation Caused by Lack of Spatial Information of the Cost Based on Work Type (공간단위 공사비 산정방법에 관한 연구 - 공종별 공사비의 공간정보 부재로 인한 한계점 개선을 중심으로 -)

  • Lee, Ki-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.131-139
    • /
    • 2011
  • In this Study, the Cost of Public Facility Construction in the VE Cost Model, and the Progress of the Construction Site Management, and Cost due to the Lack of Cpatial Information in Dispute Cost Work Type Recognize the limits of Historical Information, and to Overcome the Perception of Cost and Space Systems Unit In the Process of Transition that Began Seeking Ways to Improve Through this Study, Different Parts of the Proposed Area of Construction Work Unit System, the Core of Calculating Hourly and Detailed Engineering Information and Cost Information Generated Extension to Configure the Construction Unit in Every Space, Every Work Unit System, All Materials That Make Up Work Unit System, Unit Labor Costs, And All of the Configuration Items Enables Precise And Multidimensional Understanding is That.

New or Renew: Constructing Tomorrow with Kit of Parts

  • Ilkay Standard;Sena Kucukayan
    • International Journal of High-Rise Buildings
    • /
    • v.13 no.1
    • /
    • pp.97-102
    • /
    • 2024
  • In this paper, we would like to share our ongoing research on global population and demographic shifts and the corresponding need for diverse responses. As population growth varies worldwide, the pressing issue is the current global housing shortage. The USA alone lacks 4 million homes, underlining the urgency for new construction and renewal of existing. Our focus is primarily on new building processes, which must also incorporate elements of renewal for future sustainability. Our research addresses several key questions: How will roles for construction professionals change? What should be the primary goal of the design process? What types of technologies are currently available, and which aspects of the process can be enhanced with AI? A significant part of our study is exploring sustainable building methods that reduce embodied carbon and increase speed of construction. Our goal is to extend the transition from smart homes to cities, analyzing the evolution towards smart communities and cities. A critical aspect of our research is the 'kit of parts concept, involving prefabrication and modular construction. This approach is essential for both rebuilding and new projects, potentially lowering costs in manufacturing and design for long term. Lastly, we present a detailed comparison of the construction industry with manufacturing.