• Title/Summary/Keyword: BIM Level

Search Result 154, Processing Time 0.026 seconds

How Much Discrepancy Can Happen from BIM-based Quantity Take?

  • Kim, Seong-Ah;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.263-267
    • /
    • 2015
  • Stakeholders of a construction project expect cost savings through fast and accurate cost analysis by performing BIM-based quantity take-off (BQT). However, authors have observed that there can be discrepancies in the results of BQT depending on the level of development (LOD) and modeling methods. In addition, since quantity take-off methods are different depending on the construction work items, the combination of LOD, modeling methods of BIM, features of construction work items can cause serious overestimate or underestimate in BQT results. It is necessary to identify what kind of problems can happen and how those problems can be avoided in various construction work items, since the discrepancy of quantity take-off results has great impact on not only cost analysis but also the determination of contract amount and it can cause claims, poor construction quality, cost overruns, and many others later in the construction project. Therefore, this paper focuses the identification of issues and problems of BQT at each construction work item level based on two categorizations of structural works and interior works.

  • PDF

Strategies to Revitalize BIM(Building Information Modeling) by the Survey Questionnaires from Design Experts in Field of Civil Engineering (토목설계 전문가 설문조사를 통한 BIM 활성화 방안)

  • Seo, Myoung-Bae;Ju, Ki-Beom
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.11
    • /
    • pp.446-457
    • /
    • 2012
  • Recently, BIM(Building Information Modeling),which has been an issue in construction work, has been focused on as a new alternative of building industry for way out of crisis by slowing down and decreasing of orders in construction industry. Research for introducing BIM to the architectural field is already proceeding actively at home and abroad. However, civil engineering is so nonrecurring, horizontal, and different from regular construction works that it a large amount of information occurs because of wide range of project, which causes construction firms and design engineers to have some questions whether their initial investment cost would work or not and feel uncomfortable with the cost. In this study, technology level in engineering firms were surveyed for adapting BIM to domestic civil engineering. Development direction of BIM standard information model was drawn through awareness change analysis of BIM in civil engineering, as well. Deduced development direction is composed of guide development, system development, deliverable check and international standard proposal. The outcome will be employed as preliminary data for the study on development of infrastructure BIM standard and deliverable check system in civil engineering.

A Research on Drawing Representation for BIM(Building Information Modeling) (BIM을 위한 도면 표현 사례에 관한 연구)

  • Chae, Kab-Su;Kim, Eon-Yong;Jun, Han-Jong;Lee, Myung-Sik;Kim, Khil-Chae;Choi, Jong-Chun;You, Seok-Joon
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.470-475
    • /
    • 2008
  • Building Information Modeling(BIM) is rooted in the economic and functional advantages of maturing from paper-based 2D drawings. The paper-based design and construction drawings are typical production from BIM and using the drawing under BIM environment is needed because there is not an alternative media instead of paper-based drawings. However using the 2D drawing process based on 2D CAD for BIM environment directly has difficulties because there are significant differences in data structure between CAD and BIM. CAD is based on traditional drawings as a whole while BIM is focused on individual objects and providing various levels of information associated with the objects. It can be an obstacle to move from 2D CAD to BIM that we don't have a standard or guideline for BIM. Futhermore, the complexity of drawing in representation would be the obstacle too, so the solution is discussed in the research based on the case of Samoo Architects and Engineers.

  • PDF

A Feasibility Study to Adopt BIM-based Infrastructure Management System (BIM기반 사회기반 시설물 유지관리 도입을 위한 경제적 타당성 분석)

  • Kim, Jeonghwan;Ji, Seung-Gu;Jeong, Taehyung;Seo, Jongwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.285-292
    • /
    • 2014
  • BIM (Building Information Modeling) is a new paradigm that includes construction life-cycle, and BIM has become mandatory regulation according to the Public Procurement Service since 2016, which accelerates its application. BIM is now expand from architectural field to infrastructure industry. Through pilot projects, BIM has been challenged with verification process. This trend has affected to maintenance and operation (M&O) phase of construction life-cycle. Advanced country has already published their research and result with feasibility study and guidelines. In this paper, we conduct the feasibility study to adopt BIM-based infrastructure management system. Bridges and tunnels were selected as application target, and benefit/cost ratio were used. The result shows that BIM-based infrastructure management system is feasible when the level of detail is more than "Medium" in bridge, and "High" in tunnel.

Information Modeling of Modular Bridge Pier using BIM Based 3D-Model Library (BIM 기반 3차원 모델 라이브러리를 통한 모듈러 교각의 정보모델링)

  • Jo, Jae-Hun;Kim, Dong-Wook;Lee, Kwang-Myong;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.3 no.4
    • /
    • pp.11-18
    • /
    • 2013
  • Modular technology has become a major issue of the construction industries to enhance their productivity. Modular bridge construction generally requires the collaboration between the contractor, designer, fabricator and constructor. Therefore, a readily accessible information model based on BIM technology should be provided for their communication during a construction project life-cycle. In this study, BIM based 3D information modeling was carried out for the modular bridge pier. First, the product breakdown structure (PBS) and level of detail (LOD) of the pier were defined. Based on them, 3D models were created by using parametric modeling method. In addition, database was constructed for the exchange of geometry and property data of 3D models. Finally, application areas of 3D information model were suggested, including the quantity estimation and the 4D simulation.

A Study on Utilizing BIM Level of Architectural Design Information for School Facilities (BIM을 활용한 학교시설 설계정보단계 설정에 관한 연구)

  • Kim, Myoung-Keun;Koh, In-Lyong;Kim, Hyung-Un
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.4
    • /
    • pp.13-20
    • /
    • 2012
  • The recent advances in digital technology allow the use of BIM for integratively managing various information pertaining to an architectural structure. This can be the suitable tool for effectively utilizing the various requests of both the users and the administrators from the planning phase. In particular, planning and constructing a school facility can be challenging because it is an important learning facility where the students are required follow a set schedule. Accommodating to the various needs and requests of the users and the other related parties in the progress can be very difficult. Therefore, in order to use the BIM with the basis of data to manage the lifetime of the school facility, it is necessary to develop the specialized BIM process customized to the school facilities. Using this as the base, the BIM process specifically for school facilities should be phased in, applied, and expanded. The objective of this study is to define the scope of application and to plan for the efficient utilization of the BIM process specialized for school facilities, when conducting the project from planning phase to design development phase through the series of processes. Unlike the presently used enhancement of the visible minute details of the models, the methods to enhance the quality of information contained inside the model will be proposed. Also, the user will participate in the school facility construction. The realistic BIM application is aimed through the research for the processes for building models that will be utilized for construction and management.

A Proposal of Life Cycle CO2 Assessment Techniques for Building in Construction Stage by BIM LOD (건설단계 BIM을 이용한 건축물의 전 과정 CO2 평가 기법 제안에 관한 연구)

  • Bang, Jun-Sik;Tae, Sung-Ho;Roh, Seung-Jun;Keum, Won-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.53-54
    • /
    • 2012
  • This study is aimed at utilizing LCA processor with BIM LOD, eliciting the problems of the existing environmental assessment by constructing the database for environmental values of green buildings. For these objects, environmental load database of BIM construction material and evaluation process are presented, after matching BIM family based environmental load database which is available during evaluation stage, input-output tables and Korea LCI database to standard item code of public procurement service. It is a important factor in environmental assessment of building to develop database unit of standard item code for BIM and construction material. Thus, the results of this study are expected to provide basic data for improving effectiveness of construction through BIM based environmental load evaluation database. Furthermore, the provided environmental load database unit for construction material is considered to be available as basic information for BIM study by suggesting a processor connecting BIM with LCA and along with this, continuous examination on the connection process is needed.

  • PDF

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

An Study on the Element Technologies of BIM and Importance Analysis of Them through Technology Development Status Analysis (BIM 기술개발 현황분석을 통한 기술개발요소 도출 및 중요도 평가에 관한 연구)

  • Kim, Ji-Yun;Lee, Da-Un;Song, A-Reum;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.497-503
    • /
    • 2014
  • In order to facilitate the application of BIM technologies in construction projects, a lot of developed countries such as Singapore and the United States are developing a technology development road-map of BIM. In order to develop it, current status of BIM technology in domestic projects must be analyzed in advance. In this study, the element technologies of BIM was identified and the current status and the importance priorities of them were analyzed and evaluated. The result shows that the level of technology developments is behind that of other advanced countries in most of the elements. In technology importance analysis, the BIM based preliminary planning technology and the standards for BIM service contracts are ranked in the high position and their developments are also delayed in Korea. The results of this analysis could show the direction of BIM technology development and also be used for developing the technology roadmap of BIM.

Factors Affecting the BIM Acceptance of Construction Managers (건설사업관리자의 BIM 수용에 영향을 미치는 요인 연구)

  • Chung, Yongche;Chin, Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.11-23
    • /
    • 2015
  • Construction Management(CM) and Building Information Management(BIM) have a lot in common that they need to establish a cooperation system among different disciplines and promote smooth communication among project stakeholders throughout the project life-cycle. BIM can be an effective information management tool for CM's business and improve their service value. However, BIM uses by Construction Managers(CMr) are very limited. The objective of this study is to analyze the intention of CMrs to adopt BIM and establish effective BIM use strategy in the CMr's point of view. This study utilizes Technology Acceptance Model(TAM) as a research method, and the results show that 1) CMrs think it is more important whether BIM is required to be adopted in their business process at the social or industry level than that BIM can improve their personal competence, recognition, and impressions through their voluntary BIM adoption; 2) that CMrs think it is important to figure out business processes where BIM can be smoothly incorporated; and 3) that CMrs hesitate the use and trial of BIM in their realworld business although they agree that BIM needs to be eventually adopted in their business in the future. Based on these results, directions for establish a strategy for BIM adoption were proposed at the CMr's point of view