• Title/Summary/Keyword: BIM Design Tool

Search Result 71, Processing Time 0.023 seconds

BIM Modeling and Architectonic Characteristics of Bended-Joint Components of the Yoon Jeung Residence (윤증고택의 BIM 부재모델링과 꺾음부의 구축적 특성)

  • Park, Soo-Hoon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.1
    • /
    • pp.10-20
    • /
    • 2013
  • The Yoon Jeung residence is a well-known and prototypical aristocratic house example showing typical and interesting characteristics of the traditional houses in the middle region of Korea. When it comes to understanding the architectonic characteristics of a Korean traditional house, it was not easy to actually capture the compositional and/or constructional knowledge of the building even though it is a wooden building with many wooden members showing their compositional relations. Now with the help of the BIM tool, the Building Information Modeling tool, we could actually be able to compare and analyze each member and their compositional relations. In this paper we examine the unique traditional composition method used in extending the building's structural sections utilizing the bended-joint characteristics of traditional buildings with exemplar case of the Yoon Jeung residence. Thereby we examine those relationships among three major compositional parts namely the plan based spatial compositions, the upper wooden compositions and the roof forms so as to specify the building's typical characteristics with reasonably acceptable causes. The inner and outer block of the residence are handled with their bended-joints with more detailed knowledge of categorization by way of joint relationships among members.

A Study of the Establishment of Framework for Information Exchange based on IFC Model in Domestic Collaborative Design Environment (국내 협업 설계 환경에서의 IFC기반 정보 교환 프레임워크 구축에 관한 연구)

  • Shin, Joonghwan;Kwon, Soonwook;Lee, Kyuhyup;Choi, Sangduck;Kim, Jinman
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.24-34
    • /
    • 2015
  • As recent multilateral collaboration design system has been advanced, BIM based data exchange is a key factor for successful next generation building project. Even though many studies have been trying to set up a data compatibility system for collaboration, There are still a lot of problem in data exchange between design and engineering phase. Therefore, In this study, we analysis causes of problem for information exchange and suggest a IFC based Information exchange framework for improving BIM based design collaboration environment. In order to find out problems that hinder establishment of advanced open BIM information exchange, proper analysis about transition of process from current and to-be BIM based design collaboration process is important, at first. From analysis of main obstacles to information exchange, this research suggests solution plan using open API and IFC based BIM collaboration supporting system. The suggested open API solution named Integrity feedback system perform a role making up for weak point derived from IFC based data exchange. And main system suggestion about framework for IFC based information exchange reflect technological system support, requirement of function for collaboration including API/BCF plug-in.

Derivation of BIM Project Properties Through an Analysis of On-Line BIM Project Cases (온라인 BIM(Building Information Modeling) 사례 분석을 통한 BIM 프로젝트 속성정보 도출)

  • Lee, Kyungha;Uhm, Miyoung;Lee, Hwayeon;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.194-195
    • /
    • 2015
  • When starting a new project, generally similar existing projet are searched. As Building Modeling Information(BIM) has short history and experience, the dependence on similar project is high. Small and medium sized design companies are depending on website search tool for information of BIM project besides companies maintaining the Database(DB) from lots of project experience. However, the information level and contents provided by websites differ drastically from each other which makes it difficult to utilize the information and apply cases. Furthermore, the different classification system of the sites makes the situation even worse. Therefore, we collected and analyzed over 100 BIM cases from 18 global websites, to develop a system for BIM case application. Result showed that over 90% of our subject pool provided basic information including the construction type, characteristics of the client (public/ private), location of the project, and detailed information such as primary usage. Moreover, the reasons for applying BIM where to solve problems of geometric design, building system like MEP and construction. Furthermore, there was a contrast between cases conducted only within Korea and cases conducted with other countries. While there was almost always helpful information regarding the administrative steps for Korean BIM cases, there was close to no information for projects carried out outside of Korea. These results could contribute to verifying the trend of information provision of the websites for BIM projects data, and this is believed to be helpful for developing an application system for BIM cases which have an organized information provision system and level as well as for bench marking.

  • PDF

Developing a BIM-Based Methodology Framework for Sustainability Analysis of Low Carbon High-Rise Buildings

  • Gan, Vincent J.L.;Li, Nan;Tse, K.T.;Chan, C.M.;Lo, Irene M.C.;Cheng, Jack C.P.
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.14-23
    • /
    • 2017
  • In high-density high-rise cities such as Hong Kong, buildings account for nearly 90% of energy consumption and 61% of carbon emissions. Therefore, it is important to study the design of buildings, especially high-rise buildings, to achieve lower carbon emissions in the city. The carbon emissions of a building consist of embodied carbon from the production of construction materials and operational carbon from energy consumption during daily operation (e.g., air-conditioning and lighting). An integrated analysis of both types of carbon emissions can strengthen the design of low carbon buildings, but most of the previous studies concentrated mainly on either embodied or operational carbon. Therefore, the primary objective of this study is to develop a holistic methodology framework considering both embodied and operational carbon, in order to enhance the sustainable design of low carbon high-rise buildings. The framework will be based on the building information modeling (BIM) technology because BIM can be integrated with simulation systems and digital models of different disciplines, thereby enabling a holistic design and assessment of low carbon buildings. Structural analysis program is first coupled with BIM to validate the structural performance of a building design. The amounts of construction materials and embodied carbon are then quantified by a BIM-based program using the Dynamo programming interface. Operational carbon is quantified by energy simulation software based on the green building extensible Markup Language (gbXML) file from BIM. Computational fluid dynamics (CFD) will be applied to analyze the ambient wind effect on indoor temperature and operational carbon. The BIM-based framework serves as a decision support tool to compare and explore more environmentally-sustainable design options to help reduce the carbon emissions in buildings.

  • PDF

BIM based Design Optimization and Constructability Improvement for Adoption of Pre-construction Service. (프리컨스트럭션 서비스 도입을 위한 BIM 기반 설계 최적화 및 시공성 검토)

  • Lee, Chang-Hee;Lee, Jeong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.187-188
    • /
    • 2017
  • Korean government is trying to adopt 'CM at Risk(CMR)' method to solve some problems of traditional project delivery method such as cost increase, delay, low quality. Pre-construction service(PCS) is a project management methodology of CMR and BIM is the best tool for efficient PCS execution. PCS is consisted of several main items such as Target costing, Cost trending, GMP, Design optimization, Constructability review and Productivity. The purpose of this research is to analyse contractor's PCS application case result and to find improvement items.

  • PDF

A Comparative Study of Building Energy Simulations for Building Types in Multiple Stock Housing based on BIM(Building Information Modeling) (BIM기반의 공동주택 주동 유형별 건물에너지 시뮬레이션 비교에 관한 연구)

  • Lee, Byeongho;Lee, Geonwon;Yeo, Youngho
    • KIEAE Journal
    • /
    • v.10 no.4
    • /
    • pp.87-100
    • /
    • 2010
  • The energy efficient design of the multiple stock housing is very important not only to save energy but also to increase sustainability in a whole city because the multiple stock housing type is dominated in the major residential supply markets in Korea. During the early design phase of the multiple stock housing type, the architect need convenient and accurate tools for evaluating energy consumptions based on building types rapidly. Building Information Modeling(BIM) is introduced as useful tool systems providing interoperability between 3rd dimensional modeling tools and environmental engineering analysis tools, and could reduce time and cost for unnecessary modeling works in the analysis. However, it is still hard to apply to building design practice and integrated energy simulation techniques because interoperability using industrial standard file formats such as IFC and bXML is still underdeveloped. Therefore, the purpose of this study is to perform the building energy simulations, to compare the results on typical building types in multiple stock housing based on BIM, and to clear the problems using industrial standard file formats between 3rd dimensional modeling and building energy simulation software. In addition, through comparisons with simulation results according to the typical building types such as building forms, orientations, and building stories, the interrelation ship and characteristics of BIM based building energy simulation software are analysed and evaluated.

A Study on the Effects of BIM Adoption and Methods of Implementationin Landscape Architecture through an Analysis of Overseas Cases (해외사례 분석을 통한 조경분야에서의 BIM 도입효과 및 실행방법에 관한 연구)

  • Kim, Bok-Young;Son, Yong-Hoon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.45 no.1
    • /
    • pp.52-62
    • /
    • 2017
  • Overseas landscape practices have already benefited from the awareness of BIM while landscape-related organizations are encouraging its use and the number of landscape projects using BIM is increasing. However, since BIM has not yet been introduced in the domestic field, this study investigated and analyzed overseas landscape projects and discussed the positive effects and implementation of BIM. For this purpose, landscape projects were selected to show three effects of BIM: improvement of design work efficiency, building of a platform for cooperation, and performance of topography design. These three projects were analyzed across four aspects of implementation methods: landscape information, 3D modeling, interoperability, and visualization uses of BIM. First, in terms of landscape information, a variety of building information was constructed in the form of 3D libraries or 2D CAD format from detailed landscape elements to infrastructure. Second, for 3D modeling, a landscape space including simple terrain and trees was modeled with Revit while elaborate and complex terrain was modeled with Maya, a professional 3D modeling tool. One integrated model was produced by periodically exchanging, reviewing, and finally combining each model from interdisciplinary fields. Third, interoperability of data from different fields was achieved through the unification of file formats, conversion of differing formats, or compliance with information standards. Lastly, visualized 3D models helped coordination among project partners, approval of design, and promotion through public media. Reviewing of the case studies shows that BIM functions as a process to improve work efficiency and interdisciplinary collaboration, rather than simply as a design tool. It has also verified that landscape architects could play an important role in integrated projects using BIM. Just as the introduction of BIM into the architecture, engineering and construction industries saw great benefits and opportunities, BIM should also be introduced to landscape architecture.

A BIM-based model for constructability assessment of conceptual design

  • Fadoul, Abdelaziz;Tizani, Walid;Koch, Christian
    • Advances in Computational Design
    • /
    • v.3 no.4
    • /
    • pp.367-384
    • /
    • 2018
  • The consideration of constructability issues at the design stage can lead to improved construction performance with smooth project delivery and savings in time and money. Empirical studies demonstrate the value obtained by integrating construction knowledge with the building design process, and its benefits for owners, contractors and designers. However, it is still a challenge to implement the concept into current design practice. There is a need for a decision support tool to aid designers in reviewing their design constructability, deploying current technological tools, such as BIM. Such tools are beneficial at the conceptual design stage when there is a room to improve the design significantly with less incurred cost. This research investigates how current process- and object-oriented models can be used to assess design constructability. It proposes a BIM-based model using embedded information within the design environment to conduct the assessment. The modelling framework is demonstrated in four key parts; namely, the conceptual design model, the constructability assessment model, the assessment process model and the decision-making phase. Each is associated with a set of components and functions that contribute towards the targeted constructability assessment outcomes. The proposed framework is the first to combine a numerical assessment system and a rule-based system, allowing for both quantitative and qualitative approaches. The modelling framework and its implementation through a prototype are described in this paper. It is believed that this framework is the first to enable users to transfer their construction knowledge and experience directly into a design platform linked to BIM models. The assessment criteria can be customised by the users who can reflect their own constructability preferences into various specialised profiles that can be added to the constructability assessment model. It also allows for the integration of the assessment process with the design phase, facilitating the optimisation of constructability performance from the early design stage.

BIM-based Design Automation Tool and Digital Twin Interoperability - Case of the Next Generation Noise Barrier Tunnel - (BIM 기반 설계 자동화 도구와 디지털 트윈의 상호운용성 - 차세대 방음터널의 사례를 중심으로 -)

  • Yang, Seung-Won;Kim, Seong-Jun;Kim, Sung-Ah
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.31-41
    • /
    • 2021
  • Digital twins between "BIM Digital Model-Physical Prototype Model" will be built for Noise Barrier tunnel(NBT) that meet the definition of N.G smart city facilities derived from previous studies to build a data flow that connects data at each stage of design, construction, and operation. In this process, BIM design automation tools are created and utilized, and consistent transmission of member and attribute data is performed by converting them into IFC format. Through this, the purpose is to improve the labor-intensive environment required from the design stage of the NBT and to consistently maintain the information required for subsequent production and construction. This includes achieving changes in the construction industry based on digital transformation by unifying various data formats used differently for each industry from design to operation. In addition, it demonstrates that information exchange in the maintenance and management stages is possible based on the data exchange of the established digital twin and aims to improve the existing labor-intensive environment and expand operability between digital and physical information. As suggested in previous studies, the implementation of digital twins in these N.G smart city facilities includes the possibility of building an environment that adds to the possibility of high value-added product platforms as well as the function of big data platforms targeting existing smart cities.

BIM Application Method for the Quality Management of Modular Houses (모듈러주택 품질관리를 위한 BIM 적용 방안)

  • Lee, Dong Gun;Kim, Jin Won;Sohn, Jeong Rak
    • Land and Housing Review
    • /
    • v.10 no.2
    • /
    • pp.59-67
    • /
    • 2019
  • The recent paradigm shift in the construction industry has led to a growing demand for industrial construction. In particular, interest in modular housing, one of the areas of industrialization architecture, is soaring. Modular housing is a construction method for completing a building by transporting factory-built modules to the site and assembling them. However, modular housing in Korea has various problems such as errors in design books, lack of factory drawings, and lack of on-site construction plans. BIM is a tool for accumulating, producing and managing various information through 3D models and is a solution to solve various problems of modular housing. In this study, problems of modular housing and BIM utilization of modular housing were presented as ways to ensure the quality of modular housing. Therefore, this study analyzed the problems that are occurring in the construction process of modular housing. And, to address the problem of modular housing, BIM utilization measures were proposed for each modular process step. However, the application of BIM in domestic modular project is currently being carried out in pilot research project. Because of this, the BIM utilize method for modular housing is limited based on the BIM use for general projects and the examples for some modular pilot projects.