• 제목/요약/키워드: BIM Design Process

검색결과 330건 처리시간 0.038초

BIM기반 통합설계프로세스의 국내 적용 가능성에 관한 연구 (A Study on the Adaptability of BIM-based Integrated Building Design Process in Domestic Architectural Design Firms)

  • 이진희;전한종
    • 한국실내디자인학회논문집
    • /
    • 제16권6호
    • /
    • pp.19-27
    • /
    • 2007
  • As AEC(architecture, engineering and construction) industry becomes larger and more complex, much information is going into each part and phase. Therefore, the existing building design process has to change and collaboration is emphasized among participants in various fields. The purpose of this study is to compare and analyze existing building design process and integrated building design process based on BIM using a IDEF0 methodology. And then, it establishes a desirable domestic integrated building design process application plan focusing on the design phase of domestic cases. As a result of analysis, flowing conclusions are included ; Firstly, problems occur on the existing building design process that are accomplished with focusing on the outcome. It makes much errors because of 2D-based information. Another problems is that collaboration doesn't go on smoothly. But, integrated building design process is accomplished with the collaboration and the coordination which pursues change and perfects cooperation. Secondly, BIM is a process of effecting optimum integrating, re-using information, and expense reduction throughout the life-cycle of a building. Moreover, it establishes a basis for the integrated building design process to build a collaboration system.

A STUDY ON THE LEVEL OF DEVELOPMENT OF BUILDING INFORMATION MODELING DESIGN PROCESS

  • Khil Chae Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.23-30
    • /
    • 2011
  • The people in the AEC industry have acknowledged and long struggled to solve the critical low productivity issue of the entire construction industry. Integrated Project Delivery has been suggested as a solution to this problem and to take this into practice many countries have come up with BIM guidelines. In order to make this a success, BIM design process and LOD must be dealt in advance. The following research has selected 3 out of 16 guidelines that specifically describes BIM process and LOD, and intends to fully acknowledge its concept by comparing the approach and definition of LOD in the BIM Design Process.

  • PDF

STEEL BOX 교량 상부구조의 BIM기반 설계 (BIM based Design of Steel Box Girder)

  • 이진경;이헌민;유재명;신현목
    • 한국BIM학회 논문집
    • /
    • 제1권2호
    • /
    • pp.6-11
    • /
    • 2011
  • 국내 토목분야의 건설 산업은 비효율적인 의사소통으로 인하여 업무전환단계에서의 정보 누락 및 그로 인한 비용손실 등의 문제점이 발생한다. 이러한 문제점에 대한 해결책으로 BIM의 도입이 대두되고 있다. BIM은 구조물의 생애주기 전 단계에서 발생되는 모든 정보들을 3차원 파라메트릭 CAD와 연계된 3차원 정보모델을 통하여 관리하여 정보 활용의 효율성을 극대화 시킨다. 본 논문에서는 BIM기반의 교량 건설 프로젝트의 구조설계업무에서 사용할 목적으로 3차원 정보모델을 활용한 교량의 구조설계 프로세스를 제안하였다. 제안된 프로세스는 구조설계업무를 통하여 결정되는 정보들을 활용하여 3차원 정보 모델링작업이 이루어질 수 있도록 구성하였다. 또한 제시된 프로세스를 활용하여 현재 건설이 진행 중인 스틸박스 교량의 상부구조를 대상으로 구조설계의 최종 산출물인 구조계산서를 구축된 BIM기반의 구조설계 프로세스를 활용하여 도출할 수 있도록 구성하였다.

CLOUD BIM 기반 설계 프로세스에서 설계정보의 구조화 및 성능지향적 설계서비스를 통한 협업설계 지원 방안 (A Study on Collaborative Design System using Design Issue Modeling and Performance-oriented Design Service in CLOUD BIM based Design Process)

  • 정재환;김진웅;송유미;김성아
    • 한국BIM학회 논문집
    • /
    • 제6권1호
    • /
    • pp.9-17
    • /
    • 2016
  • Building information modeling refers to combination or set of technologies and organizational solutions that are expected to increase collaboration in the construction industry and to improve the productivity and quality of the design, construction, and maintenance of buildings. For enhanced communication among project participants, various information which BIM model usually includes is provided, furthermore data which contain exchange of unstructured information is needed. If the extension of BIM standard file format for practical use of design Issue information about collaborative design process is fulfilled, the productivity and quality of design will be improved.

Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage

  • Choi, Jungsik;Kim, Hansaem;Kim, Inhan
    • Journal of Computational Design and Engineering
    • /
    • 제2권1호
    • /
    • pp.16-25
    • /
    • 2015
  • Since construction projects are large and complex, it is especially important to provide concurrent construction process to BIM models with construction automation. In particular, the schematic Quantity Take-Off (QTO) estimation on the BIM models is a strategy, which can be used to assist decision making in just minutes, because 70-80% of construction costs are determined by designers' decisions in the early design stage. This paper suggests a QTO process and a QTO prototype system within the building frame of Open BIM to improve the low reliability of estimation in the early design stage. The research consists of the following four steps: (1) analyzing Level of Detail (LOD) at the early design stage to apply to the QTO process and system, (2) BIM modeling for Open BIM based QTO, (3) checking the quality of the BIM model based on the checklist for applying to QTO and improving constructability, and (4) developing and verifying a QTO prototype system. The proposed QTO system is useful for improving the reliability of schematic estimation through decreasing risk factors and shortening time required.

BIM 기반 건축설계 품질검토를 위한 체크리스트 개발 연구 (Development of Check-list for BIM Based Architectural Design Quality Check)

  • 최중식;김인한
    • 한국CDE학회논문집
    • /
    • 제18권3호
    • /
    • pp.177-188
    • /
    • 2013
  • The construction industry consists of various and massive architectural information as an architectural process includes a variety of design stages with cooperation of many disciplines. Particularly, architectural information is generated and managed through the life cycle of a building, from conceptual design stage to the construction and maintenance. A Building Information Model (BIM) serves as a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle from inception onward. BIM technology accomplished quantitative development being utilized in various disciplines. However, it is necessary to develop environment and requirement for qualitative improvement of BIM based project. Particularly, requirement is very important for architectural design evaluations. The purpose of this study is to develop and apply of quality control check-list for improving the quality of architectural design in BIM environments. To achieve this purpose, the authors have investigated case study for open BIM data quality control (software, guideline and application case) and classified quality control targets according to physical/logical quality control and data quality. In addition, the authors have defined open BIM based quality control process and developed quality control check-list. Finally, the authors have developed automatic quality check system using requirements for efficient quality control based on open BIM.

BIM기반 건축물 설계 과정에서 실시간 에너지 성능 분석을 위한 기술 개발에 관한 연구 - 열관류율 분석을 중심으로 (A Study on the Development of the Technology of Evaluating the Performance of Energy - saving in the BIM-based Design Process in the Real Time Manner Focused on the Analysis of Coefficient of Overall Heat Transmission)

  • 이윤길;조원준
    • KIEAE Journal
    • /
    • 제13권1호
    • /
    • pp.29-37
    • /
    • 2013
  • This study intended to introduce the method of designing an eco-friendly building based on BIM(Building Information Modeling) and BIM-based application. The proposed application aimed to generate the environmental performance of the designed alternative automatically in real-time manner in the process of architectural design. We focused on the feasibility of BIM-based eco-friendly design process and the applicability of the developed application for the architectural design practice. In this manner, in the end of paper, we proposed the so-call EcoBIM which is the performance evaluation module for the designed alternative using BIM in the real-time manner and the new design process with it. EcoBIM generate the coefficient of overall heat transmission of wall, roof and slab of the designed alternative with their physical characteristics such as thickness, thermal resistance and so on.

건축물 BIM 적용사례를 통한 설계 및 시공프로세스 표준화 수립에 대한 연구 (A Study on the Establishment of Design and Construction Process Standardization through Building BIM Application Case)

  • 정희웅
    • 한국건축시공학회지
    • /
    • 제22권4호
    • /
    • pp.347-358
    • /
    • 2022
  • 국내 건축물 설계 및 시공단계에서의 BIM 적용에 대한 건설 전반적 운영의 기대치인 설계 BIM의 재활용 및 시공단계에서 필요한 견적, 공정 등의 정보 추출 및 활용을 만족하기에는 연계되는 모바일 기술이나 단말기기의 현장 보급 및 적용이 부족한 상태이다. 따라서 본 연구에서는 이러한 BIM 세부 업무 프로세스에 대해 모바일 기술 적용의 4D 시뮬레이션 및 Test-Bed 신축건축물 대상으로 기획·계획·기본·실시설계 및 시공단계에서 3차원 3D와 공정관리 4D 시뮬레이션 및 5D 물량산출 BIM 모델과 라이브러리를 구축하고, 시공단계에서 BIM 모델을 통한 간섭체크 등 다양한 시공성 검토를 보다 효과적으로 활용하는 건설업무의 BIM 프로세스에 대한 표준화 수립을 제시하는데 목적이 있다.

오피스 건물에 대한 BIM기반 구조설계 프로세스의 적용사례 (Application Case Study on the BIM based Structural Design Process for Office Buildings)

  • 신태송;엄진업
    • 한국강구조학회 논문집
    • /
    • 제24권3호
    • /
    • pp.301-312
    • /
    • 2012
  • 본 연구에서는 가상건설시스템 개발 연구를 통해 구축된 BIM 기반 구조설계 프로세스와 개발 시스템을 적용하여 오피스 건물을 대상으로 사례 연구를 수행하였으며, 그 결과로부터 프로세스 및 개발 시스템의 적용에 따른 업무의 생산성과 경제성을 평가하였다. 사례 연구는 강구조를 주요 대상으로 하여, 구조해석모델 및 기본설계도서를 시작으로 기본실시모델과, 실시구조모델의 생성을 단계적으로 수행하였으며, 완성된 실시구조모델을 IFC를 이용하여 통합모델을 구축하여 다양한 BIM 설계도구와의 상호운용성을 검토하였다. BIM 프로세스를 구축하여 업무환경을 효율적으로 개선할 수 있었고, 접합부 모델링 자동화로 업무의 생산성을 향상시킬 수 있었다.

철도 인프라 BIM 디지털 모델의 전자납품 프로세스 및 기능 모듈 구성방안 연구 (A study on the Electronic Delivery Process and the Configuration Functional Modules of Railway Infrastructure BIM Digital Model)

  • 최광열;김진영;최형래;김이현
    • 한국BIM학회 논문집
    • /
    • 제11권3호
    • /
    • pp.55-66
    • /
    • 2021
  • Recently, Building Information Modeling(BIM) has become a hot topic in the construction industry such as quantity calculation, interference check, process management, and construction cost management. It is also trying to convert the existing 2D design to 3D design and introduce the BIM in various fields, thus, many new deliverable are being presented but there are many issues due to the lack of standard guides on the preparation and delivery criteria for such new deliverable and how to utilize performance data. Therefore, In order to develop the electronic delivery process, we analyzed the process related to the delivery of BIM digital models presented in domestic and international BIM guidelines and the delivery of products from the Korea National Railway. The analysis focused on the list of achievements, delivery process, quality review standards, and the utilization code system of the Korea National Railway through BIM guidelines and the National Railroad Service's business procedures. Based on these analysis results, it presents a plan to construct an functional module of electronic delivery.