1 |
Dong, B., Lam, K.P., Huang, Y.C., Dobbs, G.M. (2007). A comparative study of the IFC and gbXML informational infrastructures for data exchange in computational design support environments, Proceedings: Building Simulation, pp. 1530-1537.
|
2 |
Duerk, Donna P. (1993). Architectural Programming: Information Management of Design, Wiley.
|
3 |
Eastman, C. M., Teicholz, P., Sacks, R. (2011). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors, John Wiley & Sons.
|
4 |
Fuchas S., Katranuschkov P., Scherer R.J. (2010). A framework for multi-model collaboration and visualisation, 8th European Conference on Product and Process Modeling, University of Cork, Ireland, 14-16 September, 2010, pp. 115-124.
|
5 |
Jung, J. H., Kim, S.A. (2014). A Study on the Lightweighting & Automation of Data Exchange by Semantic-Filtering Method in the BIM-based Collaborative Design Process, Journal of the Architecture Institute of Korea, Vol.30 No.10, pp. 71-78.
|
6 |
Kumar, S. (2008). Interoperability between building information models (BIM) and energy analysis programs, Master's Thesis, University of Southern California.
|
7 |
MacGraw-Hill. (2007). Construction, Interoperability in the Construction industry SmartMarket Report.
|
8 |
Matthews, Jane, et al. (2015). Real time progress management: Re-engineering processes for cloud-based BIM in construction, Automation in Construction 58: 38-47.
DOI
|
9 |
Redmond, Alan, et al. (2012). Exploring how information exchanges can be enhanced through Cloud BIM, Automation in Construction 24: 175-183.
DOI
|
10 |
Schlueter, A., Thesseling, F. (2009). Building Information Model based Energy/Exergy Performance Assessment in Early Design Stages, Automation in Construction 18, pp. 153-163.
DOI
|
11 |
Treldal, N. (2008). Intergrated Data and Process Control During BIM Design, Master's Thesis, Technical University of Denmark.
|