1 |
Computer Integrated Construction Research Group, 2010, BIM PROJECT EXECUTION PLANNING GUIDE VERSION 2.0, Pennsylvania State University.
|
2 |
Kim, I.H., Kim, H.S. and Choi, J.S., 2012, A Methodology for Design Quality Control of Super-tall Buildings based on BIM-Focused on Quality Control for Evacuation Check, Journal of Architectural Institute of Korea, 28(10), pp.57-64.
과학기술학회마을
|
3 |
Jeong, Y.S., BIM Projects at Georgia Tech, The BIM Spring 2009, pp.53-55.
|
4 |
Karjalainen, A., 2007, Senate Properties BIM 2000-2011, buildingSMART- STAND-INN, MIL-ANO.
|
5 |
Karlsheoj, J., 2009, Digital Construction in Denmark from an Engineering Company's Point of view, The BIM Spring 2009, 49-52.
|
6 |
Kvarsvik, O.K., 2009, National Museum at Vestbanen Architect Competition BIM Requirements - and Results ..., buildingSMART Berlin.
|
7 |
Kim, I.H., 2010, Open BIM based Design Guidelines & Design Quality Evaluation in Korea, BIM Expert Seminar.
|
8 |
KPX, 2010, Korea Power Exchange Headquarters Building Construction Design Competition Guideline.
|
9 |
Tekla BIMsight, 2011, Tekla BIMsight Quick Reference Guide, Retrieved May 3, 2012, from http://www.teklabimsight.com/
|
10 |
Eastman, C., Teicholz, P., Sacks, R. and Liston, K., 2008, BIM Handbook, John Wiley& Sons, Hoboken, NJ.
|
11 |
Nguyen, T.H., 2005, Integrating Building Code Compliance Checking into a 3D CAD System, Computing in Civil Engineering, pp.1-12.
|
12 |
Lee, J.K., Lim, N.K., Lee, T.W., Bae, Y.H. and Kim, S.E., 2009, Architectural Quality Comtrol, Kimoondang.
|
13 |
MLTM, 2010, BIM Guide of Ministry of Land Transport and Maritime Affairs.
|
14 |
Choi, J.S. and Kim, I.H., 2001, Interoperability Tests of IFC Property Information for Open BIM based Quality Assurance, Transactions of the Society of CAD/CAM Engineers, 16(2), pp.92-103.
과학기술학회마을
|
15 |
Autodesk, 2012, Autodesk Navisworks, Retrieved October 10, 2012, from http://www.autodesk.co.kr/adsk/servlet/pc/index?siteID=1169528&id=16348678
|
16 |
Solibri, 2008, Solibri Development Network, Retrieved May 10, 2012, from https://ssl.solibri.com /sdn/wiki/index.php ?title=Main_Page/
|
17 |
Lee, J.M., 2010, Automated Checking of Building Requirements on Circulation over a Range of Design Phases, Doctoral Dissertation, Georgia Institute of Technology, USA.
|
18 |
Eastman, C., Lee, J.M., Jeong, Y.S. and Lee, J.K, 2009, Automatic Rule-based Checking of Building Designs, Automation in Construction, 18(8), pp.1011-1033.
DOI
ScienceOn
|
19 |
Kim, I.H., 2009, Quality Assurance, 7th buildingSMART Woekshop.
|
20 |
Choi, J.S., Kim, I.H., Jo, C.W. and Choi, J.H., 2009, Appliction Status of Domestic Architectural Industry of Open BIM and Development Direction, Transactions of the Society of CAD/CAM Engineers, 14(6), pp.355-363.
|
21 |
Lee, S.H., 2001, Challenges in Building Design and the Construction Industry, Lecture Notes in Computer Science, 2105, pp.225-236.
|
22 |
AIA, 2007. Integrated Project Delivery: A Guide. The American Institute of Architects.
|
23 |
Lee, M.S., 2008, Change Design Work by BIM (Building Information Modeling), Architecture & Society, Korea Architects Institute, 14, pp.88-97.
|
24 |
Kim, Y.S., 2010, Construction New Paradigm 'BIM', CNEWS, A16.
|
25 |
KIA, 2008, Architecture Design Work Hand Book, Korean Institute of Architects.
|
26 |
Senate Properties, 2007, BIM Requirements 2007 Volume 1: General part, VTT.
|