• Title/Summary/Keyword: BIM 활용 분야

Search Result 133, Processing Time 0.022 seconds

Development on Extension Contents of Construction Information Classification for Containing BIM Elements (건설정보 분류체계의 BIM 수용을 위한 확장목록 개발)

  • Cho, Geun-Ha;Ju, Ki-Beom
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.7
    • /
    • pp.4942-4949
    • /
    • 2015
  • The construction information classification which developed for the purpose of adapting informatization in construction industry suggests construction information with standardization. Currently, standardization of construction information is highly necessary for BIM that is main background of alteration as construction industry informatization. The authors suggest improvement of construction information classification. Particularly, extension contents for each facets are suggested to contain BIM. In case of applying extended classification to BIM, interoperability of information will be enhanced and it is effective to integrate information in phase of using BIM.

Productivity Analysis for Strutural Formwork Using 3D BIM (3D BIM을 활용한 골조 거푸집 공사의 생산성 분석에 관한 연구)

  • Choi, Chang-Hoon;Park, Young-Jin;Soh, Ji-Yoon;Kim, Sung-Yeon;Lee, Junbok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.4
    • /
    • pp.292-300
    • /
    • 2014
  • The construction progress control is very important because there are many unexpected factors affecting time schedule delay and cost overruns. A complicated measure including item quantity and inherent time and costs is used to monitor the progress. Another element to be considered is a productivity, which is cost effectiveness because productivity is primarily measured by the costs. Productivity is stated as constant in-place value divided by inputs such as worker-hour. The main purpose of this paper is to analyze the productivity of structural formwork using a 3D BIM. In order to achieve the research objective, an integrated model of a BIM with a daily foreman's report is developed. The quantities being extracted from a 3D model and information are integrated with manpower utilized. The developed model is applied to a case project to measure and analyze the productivity in terms of individual building and work crew team. The results are discussed and further research topics will be addressed.

Analysis of Substitutability of 2D Electronic Drawing Using the BIM Model -Focusing on the Electronic Delivery System in Road Field- (BIM 모델을 활용한 2D 전자도면 대체 가능성 분석 -도로분야 전자납품체계를 대상으로-)

  • Seo, Myoung-Bae;Ju, Ki-Beom;Kim, Nam-Gon
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.11
    • /
    • pp.441-450
    • /
    • 2013
  • With the recent increase in BIM orders in civil engineering, project owners are supplied with BIM-based products. Due to the lack of related guidelines, however, and the vague regulations on the creation and level of drawings as well as on the products list, many owners receive BIM-based products along with the existing 2D products. This can lead to task overlapping by designers or contractors and can cause the owners to have more data to maintain. If the existing 2D-based electronic supply system is changed to a BIM ordering system to reduce such a burden, it is necessary to examine the 2D products that can be extracted from or substituted for the BIM model so as to minimize the overlapping products. Therefore, in this study, BIM modeling of road construction projects whose enforcement plan by the Ministry of Land and Transportation has been completed was conducted, and based on the study results, the possibility of extracting 2D drawings from a total of 3,767 drawing items was determined. The results showed that 2,549 drawing items (67%) could be extracted as 2D drawings from the BIM model, and in particular, drawing items related to general connection work, earthwork, and amenities work could be most effectively substituted. The results of this study can be used as the base data for reducing the number of 2D drawings or substituting them in developing a BIM-based product supply system in the future.

Analysis and Design of Arch Bridge based on BIM (BIM기반 아치교량에 대한 구조해석 및 설계 연구)

  • Lee, Heon-Min;Oh, Seock-Jin;Chen, Ju-Hyun;Shin, Hyun-Mock
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.521-524
    • /
    • 2010
  • 현재 국내에서는 상품 생산을 위한 각 공정의 업무를 통합관리 해 줄 수 있는 PLM(Product Life-cycle Management)시스템을 건설업에 도입하려는 움직임이 있으며 실제 건설 구조물에 대한 통합환경 시스템인 CPLM(Construction Product Lifecycle Management) 관련 연구를 진행 중에 있다. 통합 시스템 내에서 건설 구조물 생산을 위한 각 업무분야에서는 시스템이 추구하는 업무진행의 흐름에 맞추어 작업을 수행 할 수 있도록 하는 각자의 프로세스를 개발해야 한다. 이 연구에서는 토목구조물을 대상으로 협업환경 내에서 활용 가능한 3D 정보모델인 BIM기반의 해석 및 설계 프로세스를 구축하고 국내외 토목건설산업 분야에서 차세대 설계프로세스로 유력한 BIM기반의 구조해석 및 설계 프로세스의 실용화를 위한 기초자료를 제공함을 목적으로 하며 해석 및 설계 대상 구조물로 아치교량을 선정하여 연구를 진행하였다.

  • PDF

Automation Review of Road Design Standard using Visual Programming (비주얼 프로그래밍 기법을 활용한 도로설계기준 자동검토 방안)

  • Hyoun-seok Moon;Hyeoun-seung Kim
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.4
    • /
    • pp.891-898
    • /
    • 2022
  • Purpose: There is not much time left for mandatory BIM implementation for all sectors and stages of the construction industry. Therefore, it is necessary to find a way to secure technology to substantially improve the productivity of BIM work. In the research, we proposed a method to automatically verify related construction standards for major objects produced by BIM modeling procedures so that engineers can verify construction standards in the BIM-based design process. Method: We defined a modeling work procedure for BIM-based road design work and prepared a method for constructing related design standards in a database. In addition, a process map for developing a BIM-based design basis review automation system was also presented. Result: A BIM-based design standard review automation module was developed using Civil3D and Dynamo. And it was confirmed by the test application that it is possible to quickly judge whether the BIM object manufactured in the design process conforms to the construction design standard. Conclusion: BIM-based design standard review automation technology can improve the productivity of BIM model production work and secure the quality of the BIM model.

Preliminary Assessment Model based on BSC for Evaluating Practical Utilization of 4D CAD System (4D CAD 시스템의 실무적 활용성 평가를 위한 BSC기반의 예비 평가 모델)

  • Kim, HyeonSeung;Moon, HyounSeok;Kang, LeenSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.2069-2079
    • /
    • 2013
  • Recently, BIM(Building Information Modeling) is on the rise as a customized solution for construction environment, but construction companies rarely introduce and apply BIM in the construction site. Due to such issues, the fact that empirical data for evaluating the quantitative effect of BIM application is insufficient might be an another main reason. In the end, construction companies cannot assure investment effect of BIM and therefore don't make an investment actively. To activate BIM application, the evaluation system that quantitatively assess usability of BIM needs to be developed. This study aims to suggest a methodology that evaluates the usability quantitatively according to introduction and operation of BIM by construction companies. Accordingly, this study analyzes applicability of 4D CAD by developing an evaluation index and its model with BSC(Balanced Score Card) for 4D CAD, which have high practical use among BIM techniques, and verifies the usability as the entire evaluation index of BIM. Therefore, it is expected that the developed assessment model will be utilized as the critical decision-making information in order to introduce related techniques by identifying the usability and operational issues of 4D CAD.

A Study on the Development of the BIM Process for Improvement of the BIM Application Ability of the Construction Industry (건설산업의 BIM 적용능력 제고를 위한 BIM 프로세스 개발에 관한 연구)

  • Kim, Ji-Won;Lee, Min-Cheol;Choi, Jeong-Min;Ock, Jong-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.738-743
    • /
    • 2008
  • Recently BIM is utilized to improve productivity for Life Cycle Cost of construction projects. Therefore, the establishment of BIM process by each construction project is a necessary element. However, cases and the pertinent researches that BIM process by each project is established are still not enough in Korea. The study proposed construction of BIM process through how to set up BIM application, how to organize a BIM team, how to set up a family and modeling method in the early stage. To achieve the purpose, the study examined application ability of BIM process by carrying out basic setting and modeling work through pilot study model, examination of the amount of materials and information interchange with IFC. The study attempted making a foundation of domestic BIM guideline construction through the above examination.

  • PDF

Usability Improvement of BIM for Construction Projects Using Active BIM Functions (능동형 BIM 체계에 의한 토목 및 건축분야 BIM 활용성 개선 연구)

  • Kang, Leen-Seok;Moon, Hyun-Seok;Kim, Hyeon-Seung;Kwak, Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.74-83
    • /
    • 2013
  • Most current BIM systems are focused on the visual information of work status in the design and construction stages. In a passive BIM system, 3D CAD tool can visualize the interference elements of design drawings, however, it cannot suggest a solution to solve the interference status. And 4D CAD tool in the construction stage can simulate the appearance of each activity by construction schedule, however, it cannot suggest an optimized schedule plan considering specified schedule condition of the project. Recently, many organizations need BIM solutions that can improve the work status beyond the level of simple visual information from BIM system. Active BIM system can provide the solutions to the project manager. This study suggests active BIM functions for the solutions and attempts to develop a 4D CAD engine to validate the usability of the functions.

A Study on the Revitalization of BIM in the Field of Architecture Using AHP Method (AHP 기법을 이용한 건축분야 BIM 활성화 방안 연구)

  • Kim, Jin-Ho;Hwang, Chan-Gyu;Kim, Ji-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.473-483
    • /
    • 2022
  • BIM(Building Information Modeling) is a technology that can manage information throughout the entire life cycle of the construction industry and serves as a platform for improving productivity and integrating the entire construction industry. Currently, BIM is actively applied in developed countries, and its use at various overseas construction sites is increasing This is unclear. due to air shortening and budget savings. However, there is still a lack of institutional basis and technical limitations in the domestic construction sector, which have led to the lack of utilization of BIM. Various activation measures and institutional frameworks will need to be established for the early establishment of these productive BIMs in Korea. Therefore, as part of the research for the domestic settlement and revitalization of BIM, this study derived a number of key factors necessary for the development of the construction industry through brainstorming and expert surveys using AHP techniques and analyzed the relative importance of each factor. In addition, prior surveys by a group of experts resulted in 1, 3 items in level, 2, 9 items in level, and 3, 27 items in level, and priorities analysis was performed through pairwise comparisons. As a result of the AHP analysis, it was found that the relative importance weight of policy aspects was highest in level 1, and the policy factors in level 2 and the cost-based and incentive system introduction factors were considered most important in level 3. These findings show that the importance of the policy guidance or institutions underlying the activation of BIM rather than research and development or corporate innovation is relatively high, and that the preparation of policy plans by public institutions should be the first priority. Therefore, it is considered that the development of a policy system or guideline must be prioritized before it can be advanced to the next activation stage. The use of BIM technologies will not only contribute to improving the productivity of the construction industry, but also to the overall development of the industry and the growth of the construction industry. It is expected that the results of this study can provide as useful information when establishing policies for activating BIM in central government, relevant local governments, and related public institutions.

A Study on the Application Service of 3D BIM-based Disaster Integrated Information System Management for Effective Disaster Response (효과적인 재난 대응을 위한 3차원 BIM 기반 재난 통합정보 시스템 활용 서비스 제시)

  • Kim, Ji-Eun;Hong, Chang-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.143-150
    • /
    • 2018
  • Periodic and systemic disaster management has become more important than ever owing to the recent continuous occurrence of disasters, such as fires, earthquakes, and flooding. This management goes beyond simple disaster preparedness, which was introduced minimally under the existing legal system. For effective disaster management, facilities should be managed through regular maintenance on a daily basis, and in the case of an emergency, intuitive and accurate communication is essential regarding the situation and purpose. BIM manages the entire building property data using the effective 3D visualization model, so it can be used for various management purposes from design to facility maintenance. In this study, through an expert survey on the use of services in a BIM-based integrated disaster information system, the available areas of BIM data were organized in terms of facility information management, 3D visualization, and disaster control. Later, through the use service and DB definition within the BIM-based disaster integration information system, the main facilities monitoring and response services based on BIM and BIM-based spatial management service are proposed. Based on this study, it is hoped that the BIM-based application service functions within the system will be implemented to enable an effective system response.