1 |
Lee JS, Moon SK, Kim JH, Kim JJ. An analysis about factors affecting inactiveness of BIM(Building Information Modeling) introduction in the construction project. Proceedings of the Korean Institute Of Construction Engineering and Management. 2009 Nov 19-20; Daejeon, Korea. Seoul (Korea): Korea Institute of Construction Engineering and Management; 2009. p. 757-62.
|
2 |
Yoon YJ, Kim DH. A study on the organizational change in architectural design firm by introducing BIM. Journal of the Architectural Institute of Korea. 2008 Jun;24(6):11-8.
|
3 |
Sacks R, Eastman C, Lee G, Teicholz P. BIM handbook: a guide to building information modeling for owners, designers, engineers, contractors, and facility Managers, 3rd Edition. NJ: Wiley; 2018. 688 p.
|
4 |
Jung YS. Analytical validation of a CIC framework. Journal of the Architectural Institute of Korea Structure & Construction. 1999 Nov;15(11):97-104.
|
5 |
Korea Institute of Civil Engineering and Building Technology. BIM roadmap and activation strategies for public SOC projects. Sejong (Korea): Ministry of Land, Infrastructure and Transport. 2018 Sep. 50 p. Report No.: KICT 2018-029
|
6 |
Choi JS, Kim IH, Jo CW, Choi JH. Application status of domestic architectural industry of open BIM and development direction. Korean Journal of Computational Design and Engineering. 2009 Dec;14(6):355-63.
|
7 |
Choi MS. A preliminary study on the strategic approach for growth in the adoption of BIM in korea. Proceedings of the Korean Institute Of Construction Engineering and Management. 2009 Nov 19-20; Daejeon, Korea. Seoul (Korea): Korea Institute of Construction Engineering and Management; 2009. p. 598-603.
|
8 |
Won JS, Lee JJ, Lee G. A case study on BIM collaboration and information management methods. Journal of the Architectural Institute of Korea. 2008 Aug;24(8):25-32.
|
9 |
Choi HS. Analysis about factors affecting inactiveness of BIM(Building Information Modeling) introduction in the construction industry [master's thesis]. Seoul (Korea): Hanyang University; 2010. 60 p.
|
10 |
Kwon YS, Chae GS, Choi CS, Lee SH. A study of the considering elements using BIM tool for architectural design firm. Proceedings of the Korean Institute Of Construction Engineering and Management. 2009 Nov 19-20; Daejeon, Korea. Seoul (Korea): Korea Institute of Construction Engineering and Management; 2009. p. 18-24.
|
11 |
Kim WY, Lee YH, Yoo WS. A study on the activation plan through analysis of domestic and overseas institutional/policy case studies of BIM. Construction Issue Focus. 2011 Dec;2011:1-30.
|
12 |
Saaty TL. The analytic hierarchy process. NY: McGraw-Hil. 1980. 287 p.
|
13 |
Public Procurement Service. Basic guidelines for BIM application in facility business v2.0. DaeJeon (Korea): Public Procurement Service; 2019. 126 p.
|
14 |
Lee SI, Cho YS. A study on the application methodology of set-based design approach of outrigger system based on lean process. Korean Journal of Construction Engineering and Management. 2011 Jul;12(4):50-8. https://doi.org/10.6106/KJCEM.2011.12.4.50
DOI
|