• Title/Summary/Keyword: BIM 활용수준

Search Result 45, Processing Time 0.026 seconds

A Method to Apply the BIM Standard Classification System in the River Field for BIM-based River Maintenance (BIM 기반의 하천 유지관리를 위한 하천분야 BIM 표준분류체계 적용방안)

  • Jeongyong Nam;Jaeha Joo;Jeongil Hong
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.3
    • /
    • pp.147-154
    • /
    • 2023
  • In the case of river facilities, the management of this information differs depending on national and regional rivers, therefore, there is no integrated management in place. There is concern about the loss of facility information owing to the insufficient accumulation of information during their design and construction stages. Additionally, as a result, the utilization level of facility information during the maintenance and operation stages is insufficient. To ensure effective maintenance and operation of river facilities, it is necessary to secure data consistency and increase efficiency by organizing facility information according to a standardized classification system. This study proposes a strategy for implementing the BIM standard classification system in the river sector, considering facility characteristics. The goal is to introduce a BIM information model for 3D-based river facilities, and enable efficient maintenance and operation conversion.

Implementation of 3D Object Model considering Recycle-Design of PSC Box Girder (PSC 박스 거더의 Recycle-Design을 고려한 3차원 객체 모델 구현)

  • Cho, Sung-Hoon;Park, Jae-Guen;Lee, Heon-Min;Shin, Hyun-Mock
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.23 no.3
    • /
    • pp.325-330
    • /
    • 2010
  • In the fields of design within civil engineering, BIM based Utilization of 3D object model is still far from commercialization. In this paper, BIM based 3D object model is composed for PSC box girder, super structure of railway bridge. The basic unit of the model is part model. The part model is the minimum unit model. And it has hierarchy to reflect the characteristics of structures. Change orders of structural designer must be reflected quickly in the 3D object model. Repetitive change orders are occurred in actual construction process. To prepare that, we classified design variables to parameters. Change orders of structural designer can be reflected quickly in the 3D object model because those parameters are related with information of 3D object model. In this paper, we studied various benefits of BIM based design method with 3D object model in the fields of design within civil engineering, and proposed the efficient application method of 3D object model for PSC box girder.

A Study on Utilizing BIM Level of Architectural Design Information for School Facilities (BIM을 활용한 학교시설 설계정보단계 설정에 관한 연구)

  • Kim, Myoung-Keun;Koh, In-Lyong;Kim, Hyung-Un
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.4
    • /
    • pp.13-20
    • /
    • 2012
  • The recent advances in digital technology allow the use of BIM for integratively managing various information pertaining to an architectural structure. This can be the suitable tool for effectively utilizing the various requests of both the users and the administrators from the planning phase. In particular, planning and constructing a school facility can be challenging because it is an important learning facility where the students are required follow a set schedule. Accommodating to the various needs and requests of the users and the other related parties in the progress can be very difficult. Therefore, in order to use the BIM with the basis of data to manage the lifetime of the school facility, it is necessary to develop the specialized BIM process customized to the school facilities. Using this as the base, the BIM process specifically for school facilities should be phased in, applied, and expanded. The objective of this study is to define the scope of application and to plan for the efficient utilization of the BIM process specialized for school facilities, when conducting the project from planning phase to design development phase through the series of processes. Unlike the presently used enhancement of the visible minute details of the models, the methods to enhance the quality of information contained inside the model will be proposed. Also, the user will participate in the school facility construction. The realistic BIM application is aimed through the research for the processes for building models that will be utilized for construction and management.

BIM-based visualization technology for blasting in Underground Space (지하공간 BIM 기반 발파진동 영향 시각화 기술)

  • Myoung Bae Seo;Soo Mi Choi;Seong Jong Oh;Seong Uk Kim;Jeong Hoon Shin
    • Smart Media Journal
    • /
    • v.12 no.11
    • /
    • pp.67-76
    • /
    • 2023
  • We propose a visualization method to respond to civil complaints through an analysis of the impact of blasting. In order to analyze the impact of blasting on tunnel excavation, we propose a simulation visualization method considering the mutual influence of the construction infrastructure by linking measurement data and 3D BIM model. First, the level of BIM modeling required for simulation was defined. In addition, vibration measurement data were collected for the GTX-A construction site, terrain and structure BIM were created, and a method for visualizing measurement data using blast vibration estimation was developed. Next, a spherical blasting influence source library was developed for visualization of the blasting influence source, and a specification table that could be linked with Revit Dynamo automation logic was constructed. Using this result, a method for easily visualizing the impact analysis of blasting vibration in 3D was proposed.

Development of Virtual Construction Equipment Simulation System Based on BIM for Civil Engineering Project (토목시설물에 대한 BIM 기반 가상건설 장비 시뮬레이션 시스템 개발)

  • Kim, Sung-Hoon;Yoon, Young-Cheol;Joo, Cheol-Beom;Yoon, Dong-Ju
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.3
    • /
    • pp.223-230
    • /
    • 2017
  • BIM(building information modeling) has been actively applied to construction industries and to maximize its application through the life cycle of structure, various relevant technologies have been proposed. In particular, 4D sequencing management and 5D cost-related management were introduced as an improved version of the design review and interface control by 3D information design. On the other hand, the virtual construction using virtual construction equipment can sophisticatedly handle capacity, dynamic movement, collision boundaries of actual construction machines but it still stays at a low level in a technical sense. In this study, simulation systems based on BIM involving virtual construction equipment have been developed; then it is applied to the actual construction project to evaluate the safety and efficiency of construction equipments. It was confirmed that the simulation systems can be utilized to construct virtual construction site by using an effective 3D library of construction equipment and can plays a key role to secure construction safety and economic feasibility. Specifically, the simulation system are very useful for decision making by construction managers to select the optimum equipment and construction method with a better understanding for safety and cost-saving.

An Artificial Intelligent based Learning Model for BIM Elements Usage (건축 부재 사용량 예측을 위한 인공지능 학습 모델)

  • Beom-Su Kim;Jong-Hyeok Park;Soo-Hee Han;Kyung-Jun Kim
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.18 no.1
    • /
    • pp.107-114
    • /
    • 2023
  • This study described a method of designing and implementing an artificial intelligence-based learning model for predicting the usage of building members. Artificial intelligence (AI) is widely used in various fields thanks to the development of technology, but in the field of building information management (BIM), the case of utilizing AI technology is very low due to the specificity of the data in the field and the difficulty of collecting big data. Therefore, AI problems for BIM were discovered, and a new preprocessing technique was devised to solve the specificity of data in the field. An artificial intelligence model was implemented based on the designed preprocessing technique, and it was confirmed that the accuracy of predicting the construction component usage of the implemented artificial intelligence model is at a level that can be used in the actual industry.

The Analysis of Job Stress of Workers in the Architectural Design Firm After the Introduction of BIM (BIM 도입 후 설계사무소 실무자들의 직무스트레스 분석)

  • Seo, Hee-Chang;Oh, Jung-Keun;Kim, Jea-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.120-131
    • /
    • 2012
  • Today, companies exist amid unlimited competition and uncertain adminstration environment, so hands-on workers are being exposed to various job requirements and stress due to this. Especially, employees in the design firm are physically difficult because of heavy working intensity unlike other industrial field, and because the process is interrelated unlike working of a five-day workday of the other industry, it is difficult to guarantee periodic holidays and vacation. In addition, recently, while BIM is introduced in the construction industry, various changes in the individual role as well as organizational dimension such as business environment and scope & role, etc. are required, so it is the actual situation that the category and factors of job stress due to this are being also changed. Accordingly, this research has grasped important and weak sectors according to characteristics such as career, position, gender, education and existence/nonexistence of BIM template, etc. by confirming a job stress level and inducing factors of hands-on workers at the design firm. This research has a meaning in constructing a business environment of a design firm that is a main participant of BIM-based projects that are expected to have high utilization in the future.

LIM Implementation Method for Planning Biotope Area Ratio in Apartment Complex - Focused on Terrain and Pavement Modeling - (공동주택단지의 생태면적률 계획을 위한 LIM 활용방법 - 지형 및 포장재 모델링을 중심으로 -)

  • Kim, Bok-Young;Son, Yong-Hoon;Lee, Soon-Ji
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.46 no.3
    • /
    • pp.14-26
    • /
    • 2018
  • The Biotope Area Ratio (BAR) is a quantitative pre-planning index for sustainable development and an integrated indicator for the balanced development of buildings and outdoor spaces. However, it has been pointed out that there are problems in operations management: errors in area calculation, insufficiency in the underground soil condition and depth, reduction in biotope area after construction, and functional failure as a pre-planning index. To address these problems, this study proposes implementing LIM. Since the weights of the BAR are mainly decided by the underground soil condition and depth with land cover types, the study focused on the terrain and pavements. The model should conform to BIM guidelines and standards provided by government agencies and professional organizations. Thus, the scope and Level Of Detail (LOD) of the model were defined, and the method to build a model with BIM software was developed. An apartment complex on sloping ground was selected as a case study, a 3D terrain modeled, paving libraries created with property information on the BAR, and a LIM model completed for the site. Then the BAR was calculated and construction documents were created with the BAR table and pavement details. As results of the study, it was found that the application of the criteria on the BAR and calculation became accurate, and the efficiency of design tasks was improved by LIM. It also enabled the performance of evidence-based design on the terrain and underground structures. To adopt LIM, it is necessary to create and distribute LIM library manuals or templates, and build library content that comply with KBIMS standards. The government policy must also have practitioners submit BIM models in the certification system. Since it is expected that the criteria on planting types in the BAR will be expanded, further research is needed to build and utilize the information model for planting materials.

Development of BIM and Augmented Reality-Based Reinforcement Inspection System for Improving Quality Management Efficiency in Railway Infrastructure (철도 인프라 품질관리 효율성 향상을 위한 BIM 기반 AR 철근 점검 시스템 구축)

  • Suk, Chaehyun;Jeong, Yujeong;Jeon, Haein;Yu, Youngsu;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.6
    • /
    • pp.63-65
    • /
    • 2023
  • BIM and AR technologies have been assessed as a means of enhancing productivity within the construction industry, through the provision of effortless access to critical data on site, achieved via the projection of 3D models and associated information onto actual structures. However, most of the previous researches for applying AR technology in construction quality management has been performed for construction projects in general, resulting in only overall on-site management solutions. Also, a few previous researches for the application of AR in the quality management of specific elements like reinforcements focused only on simple projection, so conducting specific quality inspection was impossible. Hence, this study aimed to develop a practically applicable BIM-based AR quality management system targeted for reinforcements. For the development of this system, the reinforcement inspection items on the quality checklist used at railway construction sites were analyzed, and four types of AR functions that can effectively address these items were developed and installed. The validation result of the system for the actual railway bridge showed a degradation of projection stability. This problem was solved through model simplification and enhancement of the AR device's hardware performance, and then the normal operation of the system was validated. Subsequently, the final developed reinforcement quality inspection system was evaluated for practical applicability by on-site quality experts, and the efficiency of inspection would significantly increase when using the AR system compared to the current inspection method for reinforcements.

Establishment of Integrated Design Bases Management System of APR1400 Using BIM based Algorithm (BIM기반 Algorithm을 활용한 APR1400 설계기준 통합관리 체계 구축)

  • Shin, Jaeseop;Choi, Jaepil
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.52-60
    • /
    • 2019
  • The APR1400 is a 1400MWe nuclear power plant developed through national technology development project over a period about 10years. Approximately 65,000 design drawings are produced for APR1400 construction. In order to maintain consistency among numerous drawings, the highest level of design bases drawings (DBDs) are created according to design bases and this is used in the subsequent design. However, DBDs are produced and managed on a document basis and they are managed various field, it was difficult to accurately reflect the design bases information in the subsequent design. Therefore, this study recognizes limitations of the document based DBDs and develops a system that can accurately reflect the design bases information to subsequent design by adopting BIM based design bases integrated information system. Especially, by introducing DBIL(Design Bases Information Layer) concept, DBIL was created and analyzed based on five design bases(Physical protection, Fire protection, Internal missile protection, Internal flood protection, Radiation protection) applied to APR1400. In the final result DBIL set and Datasheet are integrated of room, design bases information, building data(wall, slab, door, window, penetrations). So it can be used for subsequent design automation and design verification. Furthermore, it is expected that APR1400 DBILs data can be used extensively in constructability and design economics analysis through comparison with next generation nuclear power plant.