Browse > Article
http://dx.doi.org/10.6106/KJCEM.2012.13.4.120

The Analysis of Job Stress of Workers in the Architectural Design Firm After the Introduction of BIM  

Seo, Hee-Chang (한양대학교 건축환경공학과)
Oh, Jung-Keun (건국대학교 건축학부)
Kim, Jea-Jun (한양대학교 건축환경공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.13, no.4, 2012 , pp. 120-131 More about this Journal
Abstract
Today, companies exist amid unlimited competition and uncertain adminstration environment, so hands-on workers are being exposed to various job requirements and stress due to this. Especially, employees in the design firm are physically difficult because of heavy working intensity unlike other industrial field, and because the process is interrelated unlike working of a five-day workday of the other industry, it is difficult to guarantee periodic holidays and vacation. In addition, recently, while BIM is introduced in the construction industry, various changes in the individual role as well as organizational dimension such as business environment and scope & role, etc. are required, so it is the actual situation that the category and factors of job stress due to this are being also changed. Accordingly, this research has grasped important and weak sectors according to characteristics such as career, position, gender, education and existence/nonexistence of BIM template, etc. by confirming a job stress level and inducing factors of hands-on workers at the design firm. This research has a meaning in constructing a business environment of a design firm that is a main participant of BIM-based projects that are expected to have high utilization in the future.
Keywords
BIM; Architectural Design Firm; Architect; Job Stress;
Citations & Related Records
Times Cited By KSCI : 6  (Citation Analysis)
연도 인용수 순위
1 Steers, R. M. (1984), "Introduction to organizational behavior", Scott Foresman and Company Inc.
2 Yerkers, R. M., Dodson, J. D (1908), "The Relation of Strength of Stimulus to Rapidity of Habit-Formation", Journal of Comparative Neurology and Psychology, 18, pp.459-482   DOI
3 Zeller, Richard A. Carmines, Edward G. (1980), "Measurement in the social sciences: The link between theory and data" Includes index. Bibliography, pp. 186-193.
4 전영웅.이명식 (2010), "BIM기반 건설현장 관리모델 개발에 관한 연구", 한국건축시공학회지, 제10권, 제1호, pp.127-135   과학기술학회마을
5 조현숙(2002), "초등학교 교사들의 직무 스트레스와 건강 수준", 인제대학교 석사학위논문
6 최정열(2010), "BIM기반 건축 설계 프로세스 현황 및 개선방안에 관한 연구", 강원대학교 석사학위논문
7 한국산업안전공단 (2003), "한국인 직무스트레스의 측정도구 개발 및 표준화 연구"
8 한국산업안전공단(2006), "직무스트레스요인 측정 지침"
9 Bale, T. L. (2006), "Stress sensitivity and the development of affective disorders", Hormones and Behavior, 50(4), pp.529-533   DOI   ScienceOn
10 French, W., Cobb, S. (1974), "Adjustment as a Person- Environment Fit", Coping and Adaption, ed. G. V. Coelho, D. A. Hanburg and J. A. Adams, New York: Basic Bools
11 Freudenberger, H. (1977). "Burn-out: The organizational menace". Training and Development Journal, 31, pp.26-27
12 Hurrell, J. J. McLaney, M. A. (1988), "Exposure to job stress a new psychometric instrument", Scandinavian Journal of Work Environment & Health, 14, pp.27-28   DOI
13 Ivancevich, J. M., Matteson, M. T., Preston, C. (1982), "Occupational Stress, Type A Behavior and Physical Well-being", Academy of management Journal, 25(2), pp.373-391   DOI   ScienceOn
14 Karasek, R. (1987), Krav/kontroll-modellen (Red). in H. Leymann & L. Svensson(Eds), Forskning for framtidens arbetsliv. Stockholm: Bokforlaget Prisma.
15 서희창.이명훈.김주형.김재준(2009), "BIM활용을 통한 건축 기획단계의 예산수립 프로세스 구축방안에 대한연구", 한국건설관리학회 학술발표대회 논문집, pp735-739
16 National Institute of Building Science (2007), National BIM Standard Version 1.0-part1 : Overview, Principles and Methodology by NIBS
17 Parker, D. F., Decotiis, T. A.(1983), "Organizational determinants of job stress", Organizational and Behavior and Human Performance, 32(2), pp.160-177   DOI
18 권오철.조찬원 (2008), "BIM 도입을 고려한 2D 전자도면 표준 발전방향에 관한 연구", 대한건축학회 논문집, 제24권 제5 호, pp.49-57
19 남정걸 (1995), "교육조직론", 한국교육행정학회, 도서출판 하우, pp.287-289
20 박중규 (2007), "건설업 종업원의 스트레스가 직무태도에 미치는 영향", 동의대학교 박사학위논문
21 송미림.윤수원.진상윤(2011), "BSC를 기반으로 한 BIM프로젝트의 만족도 측정에 관한 연구" 한국건설관리학회 논문집 제12권 제4호, pp.117-129
22 송대현.이종목.박한기 (1988), "직무스트레스와 직무 만족과의 관계 대한 상관관계 연구", 한국심리학회지, 제1권 제1호, pp.123-146
23 엄정현(2003), "건설근로자의 스트레스 관리 방안에 관한 연구", 서울과학기술대학교 석사학위논문
24 원종성(2009), "BIM 도입 핵심성공요소 도출에 관한 연구", 연세대학교 석사학위논문
25 이강 (2006), "건축물 수명주기 관리를 위한 핵심기술들" 한국건설관리학회 학술발표대회 논문집, pp.145-149   과학기술학회마을
26 이경숙 (1982), "간호원의 스트레스 요인에 관한 분석연구", 연세대학교 석사학위논문
27 이도영 (2006), "건설업 관리자의 직무스트레스평가에 관한 연구", 서울산업대학교 석사학위논문
28 이정희 (2001), "일부 자동차 조립공장 근로자들의 직무스트레스 및 스트레스 반응관련 요인", 가톨릭대학교 석사학위논문
29 이준영∙정혜선(2004), "NIOSH 직무스트레스 모형을 적용한 임상간호사의 직무스트레스 원인과 직무만족도 분석", 산업간호학회지, 제13권, 제1호, pp.30-39
30 이창희.김성아.진상윤(2011), "BIM기반 물량산출완성도 측정을 위한 지수 개발" 한국건설관리학회 논문집 제12권 제6호, pp.79-92
31 한국산업안전공단 (2006), "사무노동자의 직무 스트레스 실태 조사"
32 이현수.김봉기.박문서 (2012), "건설회사 신입사원 이직의도에 영향을 미치는 요인에 관한 연구" 한국건설관리학회 논문집 제13권 제2호, pp.137-146   과학기술학회마을
33 시시권 (1991), "직무스트레스에 대한 지각과 반응에 관한 연구", 원광대학교 박사학위논문
34 김진강 (2010), "NIOSH 직무스트레스 모델을 활용한 호텔기업 종사자의 직무스트레스 모형", 한국관광레저학회지, 제11권 제6호, pp.305-324
35 강다영.신규철(2010), "국내 BIM 교육과정 분석을 통한 건축공학 설계교육 프로세스 개선", 한국건축시공학회지, 제10권 제3호, pp.145-153   과학기술학회마을
36 국토해양부(2010), "건축분야BIM 적용가이드", pp.14