• Title/Summary/Keyword: BIM 전달

Search Result 22, Processing Time 0.021 seconds

A Study on Improvements Direction for Applying BIM-based Virtual Reality of Apartment Sales Phase (공동주택 분양 관리 단계의 BIM 기반 가상현실 적용성 확보를 위한 개선방향 도출에 관한 연구)

  • Lee, Juyeon;Kim, Taekjoong;Choi, Yoonki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.86-94
    • /
    • 2019
  • The purpose of this study was to analyzes the problems in terms of transmission the information of architecture in the current apartment housing sales phase, to suggest the way of application the technology of BIM-based virtual reality. For this purpose, each element technology is analyzed through analyzing the exiting studies and international technical trend of BIM-based virtual reality and motion recognition devices. And then this study analyze the present condition of apartment housing sales phase and it conduct the expert interviews for derive the problem and analyzing the importance and priority by AHP method. And finally, this study suggest the solution in terms of information delivery in apartment housing sales phase through plan for support and deriving the function about problems. The system of BIM-based virtual reality viewer that utilize a leap motion that was presented in this study, it is believed to be able to efficiently transfer the information of architecture as building information transmission system user-centric in the future of apartment housing sales phase.

A Proposal for Using BIM Model Created in Design to Construction Phase - Case Study on preconstruction adopting BIM - (건축 설계 BIM 모델의 시공단계 활용성 향상을 위한 BIM 운영 방안 제시 - 시공전단계 BIM 적용 사례를 중심으로 -)

  • Yoon, Su-Won;Kim, Seong-ah;Choi, Jong-Moon;Keum, Dae-Youn;Jo, Chan-Won
    • Journal of KIBIM
    • /
    • v.5 no.4
    • /
    • pp.1-10
    • /
    • 2015
  • In order to apply the BIM technology effectively and efficiently during the life-cycle of project, it is important to deliver a accurate information on BIM from designer, and it should be used effectively at construction or maintenance stage. However, stakeholders have created a new BIM model at each phase in many practise adopting BIM, not used BIM generated in design stage. Because they have different purposes for using BIM, and deliver the BIM model without the sufficient explanation or application. It is necessary to define the range of usable BIM in construction phase with analyzing clearly the BIM created in design phase, and determining the difference with required BIM in construction phase. Therefore, this study propose a method for construction c

Development of IDM for BIM based Structural Steel Member Design (BIM 기반 철골부재 단면설계를 위한 IDM 개발)

  • Jung, Jong-Hyun;Lee, Jae-Cheol
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.2
    • /
    • pp.1434-1440
    • /
    • 2015
  • IDM is a methodology for capturing and specifying processes and information flow during the life-cycle of a facility. The methodology can be used to document existing or new processes, and describe the associated information that need to be exchanged between parties. In this paper, the information model for BIM-based structural steel member design was defined using IDM methodology. The structural information offered in IFC was analyzed, and its adequacy was verified by applying the case study using Excel. As a result, $IFC2{\times}3$ offers the most structural design information for BIM-based structural steel member design, and some sectional properties omitted in $IFC2{\times}3$ were offered in IFC4. IDM methodology can be used effectively for developing BIM-based structural design systems.

BIM Geometry Cache Structure for Data Streaming with Large Volume (대용량 BIM 형상 데이터 스트리밍을 위한 캐쉬 구조)

  • Kang, Tae-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.9
    • /
    • pp.1-8
    • /
    • 2017
  • The purpose of this study is to propose a cache structure for processing large-volume building information modeling (BIM) geometry data,whereit is difficult to allocate physical memory. As the number of BIM orders has increased in the public sector, it is becoming more common to visualize and calculate large-volume BIM geometry data. Design and review collaboration can require a lot of time to download large-volume BIM data through the network. If the BIM data exceeds the physical free-memory limit, visualization and geometry computation cannot be possible. In order to utilize large amounts of BIM data on insufficient physical memory or a low-bandwidth network, it is advantageous to cache only the data necessary for BIM geometry rendering and calculation time. Thisstudy proposes acache structure for efficiently rendering and calculating large-volume BIM geometry data where it is difficult to allocate enough physical memory.

Integrated Information Management for Composite Object Properties in BIM (BIM 복합객체에 대한 속성정보의 통합관리)

  • Kim, Karam;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.97-105
    • /
    • 2015
  • Building information modeling (BIM)-based construction projects have increased and become more varied, and as such the management of BIM-based facility information is also increasingly important for facility maintenance. Information management, and specifically product data mapping, however, has some problems in the area of manual data entry and does not adequately consider the exchange requirements of facility maintenance. Therefore, it is necessary to introduce a method to improve the management of composite object information for BIM-based facility maintenance so that it can handle construction operation building information exchange (COBie) data for a composite object. Therefore, we present a method to map COBie data to related materials of a composite object. This research contributes to increasing the efficiency and accuracy of the required information mapping between a building model and product data using a BIM library through optimal BIM data adoption. Moreover, it allows for the creation and management of specific product data at the design development phase.

Development of 3D Parametric Models for Modular Bridge Substructures (모듈러 교량 하부구조를 위한 3차원 변수모델의 개발)

  • Kim, Dong-Wook;Chung, Dong-Ki;Shim, Chang-Su
    • Journal of KIBIM
    • /
    • v.2 no.2
    • /
    • pp.37-45
    • /
    • 2012
  • Modular bridge construction enabling better productivity of design and construction by standardized members and robotic construction becomes an important issue in construction industry. Modular structures needs accurate information delivery between design, fabrication and construction processes. BIM (Building Information Modeling) based parametric modeling was proposed for the modular bridge substructure. Considering ranges of parameters of the modular bridge, fixed value, variables and relations were defined and these parametric models were applied to design, analysis and fabrication. Experience from development of new structures can be embedded in the 3D models, and the models provide efficient and precise knowledge delivery.

The problem of using BIM data for facility management (시설물 유지관리를 위한 BIM데이터 전달의 문제점)

  • An, Hyo-Kyung;Lee, Seul-Ki;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.139-140
    • /
    • 2012
  • Facility Management (FM) is a project phase to maintenance and to increase the qualities of product which is planned on the design phase and ensured on the construction phase. In addition, since the approximate time occupied in operation and maintenance phase is the longest from construction project as total approximate cost is about 85% of whole the project, it could be managed and realized primarily. The information of facility is not created on the specific point of project, but it might be created on the whole process of subject project widely. Thus, as the information could not be lost and it can be delivered into computer aided facility management system, it is necessary to manage the facility information. This paper proposed the necessities and the problems of BIM-based data interoperability on the Korean construction projects.

  • PDF

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

A Framework Integrating Cost and Schedule based on BIM using IFC (IFC활용 BIM기반 공정/원가 통합관리 프레임워크)

  • Lee, Jin-Gang;Lee, Hyun-Soo;Park, Moonseo;Jung, Minhyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.53-64
    • /
    • 2013
  • In building construction project, there are numerous information or data parts across many different software applications and professional specialists. BIM (Building Information Modeling), as a medium for managing information generated during construction project, it is intended to enhance the effectiveness of construction management and reap a lot of advantages such as, automatic quantity takeoff, error-free estimation, 4D(3D+Time), 5D(4D+Cost) simulation. Nevertheless, the overall and practical effectiveness of BIM utilization is difficult to justify at this stage. While helpful, there are some limitation when BIM applied to construction management due to the differences of data processing process between BIM and work in the field, limitations of information generated from BIM object and interoperability problem among BIM application. Therefore, this paper propose a framework integrating BIM with cost-schedule information using IFC. And we construct the system prototype based on the framework and performed case study to examine the framework. The proposed framework provides the information basis for BIM based cost-schedule integration. ultimately, the framework increase the utilization of BIM and work efficiency of construction industry by supporting an understanding of information.

A Study on the Application Service of 3D BIM-based Disaster Integrated Information System Management for Effective Disaster Response (효과적인 재난 대응을 위한 3차원 BIM 기반 재난 통합정보 시스템 활용 서비스 제시)

  • Kim, Ji-Eun;Hong, Chang-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.143-150
    • /
    • 2018
  • Periodic and systemic disaster management has become more important than ever owing to the recent continuous occurrence of disasters, such as fires, earthquakes, and flooding. This management goes beyond simple disaster preparedness, which was introduced minimally under the existing legal system. For effective disaster management, facilities should be managed through regular maintenance on a daily basis, and in the case of an emergency, intuitive and accurate communication is essential regarding the situation and purpose. BIM manages the entire building property data using the effective 3D visualization model, so it can be used for various management purposes from design to facility maintenance. In this study, through an expert survey on the use of services in a BIM-based integrated disaster information system, the available areas of BIM data were organized in terms of facility information management, 3D visualization, and disaster control. Later, through the use service and DB definition within the BIM-based disaster integration information system, the main facilities monitoring and response services based on BIM and BIM-based spatial management service are proposed. Based on this study, it is hoped that the BIM-based application service functions within the system will be implemented to enable an effective system response.