Browse > Article
http://dx.doi.org/10.6106/KJCEM.2015.16.2.097

Integrated Information Management for Composite Object Properties in BIM  

Kim, Karam (Department of Architectural Engineering, Kwangwoon University)
Yu, Jungho (Department of Architectural Engineering, Kwangwoon University)
Publication Information
Korean Journal of Construction Engineering and Management / v.16, no.2, 2015 , pp. 97-105 More about this Journal
Abstract
Building information modeling (BIM)-based construction projects have increased and become more varied, and as such the management of BIM-based facility information is also increasingly important for facility maintenance. Information management, and specifically product data mapping, however, has some problems in the area of manual data entry and does not adequately consider the exchange requirements of facility maintenance. Therefore, it is necessary to introduce a method to improve the management of composite object information for BIM-based facility maintenance so that it can handle construction operation building information exchange (COBie) data for a composite object. Therefore, we present a method to map COBie data to related materials of a composite object. This research contributes to increasing the efficiency and accuracy of the required information mapping between a building model and product data using a BIM library through optimal BIM data adoption. Moreover, it allows for the creation and management of specific product data at the design development phase.
Keywords
BIM; Composite object; Product data; LOD;
Citations & Related Records
Times Cited By KSCI : 6  (Citation Analysis)
연도 인용수 순위
1 American Institute of Architects (2008). "Building Information Modeling Protocol Exhibit." AIA Document, E202, pp. 1-9.
2 An, H., Lee, S., Yu, J., Son, B., and Jang, H. (2013). "Analysis of Modeling Errors for BIM-based Facility Management Systems." Korean journal of construction engineering and management, KICEM, 14(4), pp. 35-45.   DOI
3 BIM Forum (2013). "Level of development specification for building information models version 2013." Available online: www.bimforum.org/lod (2015.01.01.).
4 Cho, H., Kim, Y., and Ma, Y. (2013). "A Study of LOD(Level of Detail) for BIM Model applied the Design Process." Journal of Korean institute of building information modeling, 3(1), pp. 1-10.
5 Choi, J., and Kim, I. (2011). "Interoperability Tests of IFC Property Information for Open BIM based Quality Assurance." Transactions of the Society of CAD/CAM Engineers, 16(2), pp. 92-103.
6 Choo, S., Lee, K., and Park, S. (2012). "A Study on LOD (Level of Development) for Development of Green BIM Guidelines - Focused on Energy Performance Estimation -." Journal of architectural institute of Korea, 28(6), pp. 37-47.
7 East, B. (2011). "Specifiers' Properties Information Exchange (SPIE)." National Institute of Building Sciences Working Paper, Available Online: http://www.nibs.org/?page=bsa_spie (2015. 01. 01).
8 East, W., and Mangual M. (2013). "The COBie guide - a commentary to the NBIMS-US COBie standard release 3." buildingSMARTalliiance and National Institute of Building Sciences Working Paper, 2013-03.
9 Kim, I., and Choi, J. (2014). "A Study on the Construction of Object Library System and the Verification of Interoperability for Open BIMbased Energy Performance Assessment." Journal of architectural institute of Korea, 30(7), pp. 3-10.
10 Kim, K., Kim, G., Yoo, D., and Yu, J. (2011). "Development of construction material naming ontology for automated building energy analysis." Korean journal of construction engineering and management, KICEM, 12(5), pp. 137-145.   DOI   ScienceOn
11 Kim, K., Kim, G., Yoo, D., and Yu, J. (2013). "Semantic material name matching system for building energy analysis." Automation in Construction, 30, pp. 242-255.   DOI   ScienceOn
12 Korea Institute of Civil Engineering and Building Technology(KICT) (2013). "BIM guide for FM v1.0 - Mechanical-." KICT Working Paper, 2013-08.
13 NBS (2012). "Uniclass-the classification for the construction industry." Construction Project Information Committee, Available online: http://www.thenbs.com/uniclass/ (2015.01.01)
14 Lee, S., Yu, J., and An, H. (2012). "Improvement of Information Collection System in Design and Construction Phases for Efficient Facility Management." Journal of architectural institute of Korea, 28(5), pp. 33-42.
15 Lucas, J., Bulbul, T., and Thabet, W. (2013). "An object-oriented model to support healthcare facility information management." Automation in Construction, 31, pp. 281-291.   DOI   ScienceOn
16 Maile, T., Fischer, M., and Bazjanac, V. (2010). "Formalizing Assumptions to Document Limitations of Building Performance Measurement Systems." CIFE Working Paper, WP125, Standford, 2010-08.
17 OCCS development committee (2014). "Omniclass-a strategy for classifying the built environment", Omniclass construction classification system, Available online: http://www.omniclass.org/index.asp (2015.01.01.)
18 Redmond, A., Hore, A., Alshwi, M., and West, R. (2012). "Exploring how information exchanges can be enhanced through cloud BIM." Automation in construction, 24, pp. 175-183.   DOI   ScienceOn