• Title/Summary/Keyword: BIM 실무

Search Result 63, Processing Time 0.026 seconds

Data interoperability between authoring software and BIM system focused on the office building in conceptual design phase (설계 초기 단계 형상정보 연동 데이터 호환체계 개발 - 오피스 매스를 중심으로)

  • Park, Jung-Dae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.494-500
    • /
    • 2020
  • Owing to the complexity of shapes and elements, some difficulties are found in the modeling and sharing phases in a project at the earlier design stages. This paper extends the boundaries by suggesting the data interoperability between 3D modeling software, McNeel Rhino 3D and BIM system, and Autodesk® Revit® Architecture. The main research methodology is to link the architectural form data in the NURBS supporting the 3DM format, especially for integrating surface properties into the mass family template of Revit. This algorithm-driven interoperability approach using visual programming, such as Dynamo in conjunction with Autodesk®, can be applicable in a theoretical part and also a practical use-case. This paper summarizes these results as sequence guidelines and project template recommendations suggesting an efficient design process to interoperate geometric data with the BIM system to manipulate and control the regular and curved form of office buildings.

A Study on a Technique for Simplifying the Connection of a 3D Model and Schedule Information for 4D Simulation (4D 시뮬레이션을 위한 3D 모델 및 공정 정보의 연계 간소화 기법 연구)

  • Park, Sang Mi;Lee, Jae Hee;Yoon, Hyeong Seok;Hwang, Jae Yoeng;Kang, Hyo Jeong;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.861-868
    • /
    • 2022
  • A key use of applying building information modeling (BIM) to the construction stage of a project is to help identify construction obstacles and to visualize construction status according to the progress of the construction schedule. When employing 4D simulation for this purpose, start and finish dates for each activity and a 3D model of the activity must be prepared. In this work, in order to simplify the configuration of a 4D model, minimum attribute information of the BIM model produced in the design stage was used to construct a system that generated activity information in the construction stage using a clustering algorithm. Its usefulness as actual schedule management information was then analyzed.

Development of Rule-Set Definition for Architectural Design Code Checking based on BIM - for Act on the Promotion and Guarantee of Access for the Disabled, the Aged, and Pregnant Women to Facilities and Information - (BIM 기반의 건축법규검토를 위한 룰셋 정의서 개발 - 장애인,노인,임산부 등의 편의증진 보장에 관한 법률 대상으로 -)

  • Kim, Yuri;Lee, Sang-Hya;Park, Sang-Hyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.143-152
    • /
    • 2012
  • As the Public Procurement Service announced the compulsory of BIM adaption in every public construction from 2016, the importance of BIM is increasing. Besides, automatic code checking takes significance in terms of the quality control for BIM based design. In this study, rule-sets were defined for Act on the Promotion and Guarantee of Access for the Disabled, the Aged, and Pregnant Women to Facilities and Information. Three analytic steps were suggested to shortlist the objective clauses from the entire code; the frequency analysis using project reviews for architectural code compliance, the clause analysis on quantifiability, and the analysis for model checking possibilities. The shortlisted clauses were transformed into the machine readable rule-set definition. A case study was conducted to verify the adaptiveness and consistency of rule-set definitions. In future study, it is required the methodologies of selecting objective clauses to be specified and its indicators to be quantified. Also case studies should be performed to determine the pre-conditions in modeling and to check interoperability issues and other possible errors in models.

A Study on the Improvement of Practice-based Construction Quantity Takeoff Educational Contents (실무 기반 건축공사 물량산출 교육용 컨텐츠 개선 방안에 관한 연구)

  • Park, Ji-Hwan;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.217-218
    • /
    • 2015
  • There are various standards and manuals on the quantity takeoff for construction estimation. However, a lot of time and money has been spent on retraining because of difference between practice and education. Therefore, the main purpose of this paper is to suggest improvement to analyze problems and limitations of the existing educational content for quantity takeoff. In order to achieve research objective, comparative analysis for quantity takeoff contents is carried out. This study will be extended to assist in effective quantity takeoff in building projects by supplementing the existing issues with quantity takeoff contents and developing a BIM-based quantity takeoff multimedia contents that use diverse media to increase the understanding on the subject for a non-professional.

  • PDF

BIM based Building Performance Analysis (BIM을 활용한 친환경 건축 성능 분석(완(完)))

  • Moon, Hyeun-Jun
    • Korean Architects
    • /
    • s.480
    • /
    • pp.57-61
    • /
    • 2009
  • 오늘날 전 세계적으로 급격한 에너지 사용과 이에 따른 온실가스의 증가로 기후변화 현상이 세계 곳곳에서 나타나고 있다. 이러한 지구온난화는 산업화에 따른 에너지소비가 주요한 원인으로 꼽히고 있으며, 선진국에서는 에너지소비와 이산화탄소 방출을 줄이기 위한 노력을 적극적으로 추진하고 있다. 우리나라에서도 2013년부터는 온실가스 감축 의무 이행국에 포함될 것으로 예상되어 지속가능(sustainable)한 국가발전을 위한 노력을 기울이고 있으며, 저탄소 녹색성장을 화두로 적극 대처하고 있다. 우리나라는 세계10대 에너지 소비국이면서 97%의 에너지를 외국에 의존하고 있다. 더욱이 이산화탄소배출량은 세계9위를 차지하고 있다. 따라서 향후 선진국과 경쟁을 하기위해서는 산업구조를 시급히 개선하여 에너지 소비를 줄이고 이산화탄소 배출을 적극적으로 억제하여야 한다. 현재 국내에서 사용되는 전체 에너지 가운데 건물에서 소비되는 에너지는 약 40%정도를 차지하고 있다. 이에 따라 건물에서의 에너지 사용량을 줄이고 환경부하를 저감할 수 있는 친환경 건축물의 구축이 시급하며, 관련 기술 개발 및 실제 건축물에 적용을 위한 노력이 진행되고 있다. 친환경 건축 관련 기술은 오늘날 많은 신축 건물에 적용되고 있으나, 그 성능은 아직까지 미흡한 부분이 많다. 건축물의 설계단계에 환경성능 분석결과가 적절히 반영된다면 적은 노력과 비용으로 매우 우수한 친환경 건축물을 구축할 수 있다. 하지만 기존의 설계절차 및 성능분석 지원 시스템으로는 건축 설계단계에서 에너지 소비량을 포함한 친환경 성능을 분석하기에 많은 시간의 투입과 전문가의 도움이 필요하다. 다행히 최근에 이러한 건축물의 친환경 성능 분석에 건축정보모델링(Building Information Modeling, BIM)기술을 활용할 수 있는 연구가 진행되고 있다. 건축정보모델링은 컴퓨터를 이용하여 건축물의 설계 데이터뿐 만 아니라 관련 모든 정보를 모델링 하여 건축물의 설계단계부터 건물의 폐기단계까지 활용하는 기술이다. 이미 선진 외국에서는 활발한 연구가 진행되어 실무적용 단계에 있으며, 국내에서도 초기연구가 진행 중이다. 이러한 건축정보모델링 기술이 친환경 건축물 구축기술에 활용된다면, 친환경 건축물 구축 및 성능 향상에 많은 도움이 될 수 있을 것으로 기대된다. 또한, 녹색 성장의 기반이 될 수 있는 건축물의 설계 및 시공, 유지관리가 가능해 질것이다. 따라서 이번 연재에서는 지속가능한 설계와 건축정보모델링을 활용한 건축 환경 성능을 분석에 관한 내용을 주제별로 다루고 그 사례를 살표보고자 한다.

  • PDF

Development of BIM-based 3D Modeling Instruction Materials and its Application Analysis for Professional Drafting Subject of Specialized Vocational High School (특성화고 전문제도 과목을 위한 BIM 기반 3D 주택설계 수업자료 개발 및 적용)

  • Kwon, Se-Jeong;Yoo, Hyun-Seok
    • 대한공업교육학회지
    • /
    • v.43 no.1
    • /
    • pp.1-19
    • /
    • 2018
  • As the BIM designing technology has been applied recently in the construction field, architectural design education in the field of work and university has been changing to 3D modeling. Nevertheless, architectural design & drafting education in the construction specialized vocational high school is not responding appropriately to change. Despite the fact that students need to have 3D modeling design ability, there is a very lack of 3D housing design instructional material that can satisfy the change. The purpose of this study is to develop BIM-based 3D modeling instruction material and apply to analyze effect on interest and task performance ability on Housing Design. The 3D modeling instruction material used in this study was developed through four stages of preparation, development, implementation and evaluation according to the PDIE model procedure. Also, the experimental design model for hypothesis testing was used nonequivalent control group pretest-posttest design. Based on the experimental design model, BIM-based 3D modeling instruction material was performed in the experimental group and 2D CAD-based standard instruction material was taught in the control group. Experimental treatment was conducted on the students of construction specialized vocatinonal high school, and applied to the subject of Professional Drafting in the 12 hours. Before and after the experimental treatment, the interest and task performance ability on Housing Design were tested. Based on the test results, we analyzed the effects of the 3D modeling instruction material through the independent samples t-test. The results of the study are as follows. First, BIM-based 3D modeling instruction material was developed of 'Housing Design & Drafting' unit on the subject of Professional Drafting in construction specialized vocational high school. Second, the application of 3D modeling instruction material has shown to be effective in improving students' interest. Third, the application of 3D modeling instruction material has shown to be effective in improving students' task performance ability on Housing Design.

Application of Linear Schedule Chart by Linking Location Information of Construction Project with Horizontal Work Space (수평작업공간을 갖는 건설프로젝트의 위치정보 연동에 의한 선형공정표 적용방안)

  • Han, Seon Ju;Kim, Hyeon Seung;Park, Sang Mi;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.4
    • /
    • pp.601-610
    • /
    • 2018
  • Since the building construction works are repeated vertically in a limited space, there is not a great need for the location information of each activity in the schedule management. On the other hand, civil engineering works such as road and railway projects consist of a large number of earthworks, long bridges, and long tunnels. These types of work should be controlled in a horizontal space according to the linear axis of several tens of kilometers. In other words, since most of the activities are managed in the unit of distance from the start point to the end point, it is possible to improve the efficiency of the schedule management by linking the location information of the activity with the schedule data in the schedule management system. This study presents a methodology for creating a linear schedule chart specific to a project with horizontal work space and compares the convenience with the existing Gantt chart. In addition, the methodology of linking linear schedule chart to the 4D CAD system, which is a typical BIM technology in the construction phase, is presented to improve the usability of BIM. The practical applicability of the proposed methodology was verified statistically.

Development of an Algorithm for Automatic Quantity Take-off of Slab Rebar (슬래브 철근 물량 산출 자동화 알고리즘 개발)

  • Kim, Suhwan;Kim, Sunkuk;Suh, Sangwook;Kim, Sangchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.52-62
    • /
    • 2023
  • The objective of this study is to propose an automated algorithm for precise cutting length of slab rebar complying with regulations such as anchorage length, standard hooks, and lapping length. This algorithm aims to improve the traditional manual quantity take-off process typically outsourced by external contractors. By providing accurate rebar quantity data at BBS(Bar Bending Schedule) level from the bidding phase, uncertainty in quantity take-off can be eliminated and reliance on out-sourcing reduced. In addition, the algorithm allows for early determination of precise quantities, enabling construction firms to preapre competitive and optimized bids, leading to increased profit margins during contract negotiations. The proposed algorithm not only streamlines redundant tasks across various processes, including estimating, budgeting, and BBS generation but also offers flexibility in handling post-contract structural drawing changes. In particular, the proposed algorithm, when combined with BIM, can solve the technical problems of using BIM in the early phases of construction, and the algorithm's formulas and shape codes that built as REVIT-based family files, can help saving time and manpower.

A Study on the Usage of Digital Design Tool on Architectural Design Process (건축 프로세스에서의 Digital Design Tool 활용에 관한 연구)

  • Jeon, Hyun-Woo;Choi, Jong-Chon;Kim, Khil-Chae
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.567-572
    • /
    • 2009
  • 본 연구에서는 국외 설계사무실과 국내 설계사무실의 수행 프로젝트(표1)를 디지털 디자인 프로세스에서의 디지털 도구 활용 사례조사 결과를 일련의 설계 프로세스(기획(Pre-Design), 계획 설계(Schematic Design) 중간설계(Detail Design), 실시설계(Construction Design))를 11개의 설계 단위작업((1)자료수집, (2)도서화작업, (3)의사소통/프레젠테이션, (4)협력업체와의 협업, (5)디자인 실험, (6)디자인분석/유효성 검토, (7)빌딩시스템과 자재선정, (8)자재비교/견적, (9)디자인 발전, (10)RP를 이용한 모델 제작, (11)시공/제작)으로 분류하여(설계프로세스별로 디지털 디자인 툴의 활용 빈도를 조사 분석하는 것은 프로세스별로 중복된 설계 단위작업이 진행됨으로 연구결과의 의미가 잘못 해석될 수 있다.) 그 활용에 대한 유형을 분석하고 이를 바탕으로 설계과정에서의 디지털 디자인 툴의 활용특성을 도출하여 실무설계의 기초자료를 제공하는데 그 목적을 둔다.

  • PDF

A Study of Information Update and Framework for Intergrated Maintenance and Operation of River Facilities (하천시설 통합 유지운영을 위한 정보 현행화 및 프레임워크 구축방향 연구)

  • Nam, Jeong-Yong;Kim, Min-Jeong;Jo, Chan-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.12
    • /
    • pp.140-149
    • /
    • 2017
  • Recently, it has become necessary to consider climate change when managing multi-purpose river functions. However, in terms of domestic rivers, the management of national and local rivers is separated and the river information cannot be integratedly handled. Especially, it is not sufficient to collect and update information by recycling reports for design and construction. In addition, the basic information of the rivers is dependent on the GIS-based RIMGIS system, but the reliability of the information is deteriorating due to the construction of spatial information using the river basement planning results. The purpose of this study is to investigate the current status of the information system with regard to the maintenance and operation of the river facilities. Through the verification of actual cases, the optimal solution was suggested from the point of view of practical information. As a result, we constructed an information system for the reliable maintenance of river facilities and examined the integrated information management plan. The results of this study can be used to improve the existing information and technical and institutional procedures for the integrated maintenance and operation of river facilities. It will be helpful to introduce the BIM as well as solve to the information gap with other fields through the establishment of an information framework to improve the information construction of river areas.