• Title/Summary/Keyword: BIM 모델

Search Result 411, Processing Time 0.023 seconds

BIM Model Quality Improvement by Case Study Analysis (품질검증 사례 분석을 통한 BIM모델 품질개선 방안)

  • Kwon, O-Cheol;Cho, Joo-Won;Jo, Chan-Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.3
    • /
    • pp.164-174
    • /
    • 2012
  • The recent introduction of BIM technology has raised the interest on the BIM quality assurance and management more than ever. This study aims to consider the ways of BIM quality improvement by analyzing the most frequent issues rising from multiple BIM projects. For this purpose, the 12 test models from BIM education program hosted by buildingSMART Korea are investigated based on the requirements in the public BIM guidelines. All the BIM issues generated are categorized by the criteria applied and analyzed for each kind of building element. The results showed that more than half of the issued at least could be cleared out by improving modeling habits and technical guides.

Development of BIM models and management of BIM data for waterworks maintenance (상수도시설물의 유지관리를 위한 BIM모델 개발 및 BIM 데이터 관리방안)

  • Park, Jaehyun;Lee, Hyundong;Kwak, Pilljae
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.28 no.6
    • /
    • pp.669-679
    • /
    • 2014
  • 3D-based BIM(Building Information Modeling) technologies can be utilized effectively as a means of systematic management of facility information for safety assurance and effective maintenance of waterworks facilities. In this study, BIM models of water treatment facilities that can be used as basic data for BIM-based maintenance of waterworks facilities were developed. Information exchange and generality of the developed BIM models were evaluated by conducting interoperability analysis of IFC(Industry Foundation Classes) conversion models. In addition, the application of COBie(Construction Operations Building information exchange) was recommended as an effective countermeasure to deal with technical limitation regarding exchange and utilization of facilities-related information through current IFC models. The results of this study can contribute to the development of BIM-based maintenance system for waterworks facilities.

Case Study of BIM Quality Assurance (BIM 모델의 품질검증 사례연구)

  • Jeong, Yeon-Suk;Park, Sang-Il;Lee, Sang-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.379-382
    • /
    • 2010
  • This study proposes a way to validate BIM data quality in BIM applications. Solibri model checker is adopted as a module development platform, which is based on Java programming language. The platform makes application developers implement BIM model checker for their own purpose. This study has developed a BIM validation module for circulation analysis of building design. The validation module enables end-users to automatically detect data corrupted or not defined. In case studies, the module found that an IFC file generated from a BIM software has wrong relation information between a space and boundary elements. A building model should satisfy modeling requirements and then domain users can get analysis results. The BIM data validation module needs to be developed in each BIM application domain.

  • PDF

Analysis of the Relationship Between Project Goal and Model Use Through BIM RFI Analysis at the Construction Site (시공 현장의 BIM 정보 요청 사항을 통해 분석한 프로젝트 목표와 BIM 활용 간의 관계)

  • Lee, Seung-Won;Eum, Ik-Chul;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.14 no.1
    • /
    • pp.22-29
    • /
    • 2024
  • BIM is a practical and economical technology used in the construction process. Despite the fact that BIM is widely used in the design and another stage before construction, it is not largely applied during the construction stage itself. However, it is important to opt for BIM during construction stage because there may occur a number of risks such as construction delay and increased construction costs. Therefore, the present paper contains the analysis of the model use, which is mainly applied to respond to the BMI RFI that represents an information requirement of construction site workers, by analysing the BMI RFI application at the construction site. In addition, there is an analysis of the way the derived model use affects the project goal aimed at the project success.

A Study on the Using of BIM Data and Template for Construction Progress Management (건설공정관리를 위한 BIM데이터와 템플릿 활용 방안)

  • Oh, Kun-Soo;Park, So-Hyun;Song, Jung-Woo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.157-163
    • /
    • 2016
  • BIM is currently applied in some domestic construction firms, but it is not being actively utilized due to changes in working environments and qualms about new studies. In order to utilize a BIM model in the design phase, process information is needed during construction, but the input system and utilization method of the process information's state are not complete. Therefore, we propose a BIM template for construction progress management that can show basic BIM information as the construction progresses in an easy and convenient way. This method will facilitate the adoption of BIM and enhance the productivity of construction companies. To this end, we designed a progress explorer for step-by-step progress and work schedules, and we generated three-dimensional views and a progress list by applying unit information (primary units, part units, and detail units) of the work breakdown structure (WBS) to the parameters. To use the BIM template, work progress information is input to the BIM modeling objects through Dynamo. We also used Dynamo for quick and easy calculation of the quantity of materials needed for construction work. To test the BIM template, we applied it to an actual project and evaluated its visibility and a progress list. The results showed that the proposed BIM template facilitates progress management of a project and can thus facilitate the adoption of BIM and improve the productivity of construction companies.

A Method of Facility Management based on BIM (BIM을 이용한 시설물 유지관리 방안)

  • Nah, Hei-Sook;Choi, Won-Sik;Kim, Nam-Gon;Moon, Hyoun-Seok;Seo, Myoung-Bae
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2013.05a
    • /
    • pp.435-436
    • /
    • 2013
  • 최근 유지관리 단계에서 BIM (Building Information Modeling)을 이용하여 시설물 유지관리 효율성과 성능개선을 도모하기 위한 연구들이 시작되고 있다. 현행의시설물 유지관리 업무에서는 준공도서를 효과적으로 활용하고 있지 못하고 있으며, 유지관리 단계의 의사결정을 위한 정보체계 미흡, 자산관리 체계 미흡 등으로 효율성 측면에서 유지관리 운영의 한계를 나타내고 있다. 이를 해결하기 위해 본 연구에서는 시설물의 3차원 형상정보 관리체계와 능동적 의사결정 모델 등 BIM기술을 활용한 유지관리 방법론을 제시한다. 제시된 방법론의 핵심인 BIM모델을 활용함으로써 시설물의 유지관리 정보의 통합관리와 시설물 성능관리에 대한 효율적 의사결정을 지금보다 쉽게 할 수 있을 것이다.

  • PDF

Suggesting Solutions when Applying Building Information Modeling (BIM) to the Korean Construction Industry through Case Studies (사례 분석을 통한 국내 BIM 적용 문제점 및 대안 도출에 관한 연구)

  • Park, Jung-Wook;Kim, Sang-Chul;Lee, Sang-Soo;Song, Ha-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.93-102
    • /
    • 2009
  • When faced with new projects, such as high-rise, complex, free-formed, and sustainable buildings, numerous participants in the building Industry use Building Information Modeling (BIM) technology. In 2009, the use of BIM spread to more contractors than eyer before. This paper aims to study the definition and characteristics of BIM, and to analyze Korean BIM application problems. Solutions for the application of BIM to the Korean Construction Industry suggested, by studying cases from developed counties and from Korea.

Development of BIM for a Maintenance System of Subway Infrastructures (지하철 구조물 유지관리 시스템을 위한 BIM 개발)

  • Shim, Chang-Su;Kim, Seong-Wook;Song, Hyun-Hye;Yun, Nu-Ri
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.6-12
    • /
    • 2011
  • BIM(Building Information Modeling) technologies are the most effective for the maintenance of infrastructures because they provide information sharing througout the life-cycle of structures and support close communication between different project stages. Systematic and well-organized data play a fundamental role for the effective maintenance of subway tunnel. In this paper, 3D information models for maintenance of BIM-based subway tunnel structures are developed. Standard classifications for the maintenance and construction information classification system were adopted. A classification system based on construction information classification system was built considering procedures of maintenance work. It provides optimization and standardization of the work flow for the maintenance of subway structures by applying information modeling processes instead of the current maintenance practices. It can effectively reduces the life cycle cost and time for the maintenance. The proposed system can be utilized for the maintenance history management to enhance current maintenance system.

Development of BIM Based Information Model Interface Module for a Modular Pier (모듈러 교각의 BIM 기반 정보 모델 인터페이스 모듈 개발)

  • Kim, Dong-Wook;Lee, Kwang-Myong;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.5 no.1
    • /
    • pp.1-7
    • /
    • 2015
  • Modular technology has become a major issue of the construction industries to enhance their productivity. Modular bridge construction generally requires the data exchange between the contractors, designers, fabricators and constructors. Therefore, a readily accessible information model interface module based on BIM technology is essential for their communication during a project life-cycle. In this study, BIM based information model interface module for a modular pier was developed. For the information models, the PBS(Product Breakdown Structure) and LOD(Level of Development) were defined. Next, all components of a modular pier were conducted by the parametric modeling technique, and then 3D cell library interface was developed. An nterface module was also developed using VBA(Visua basic Application) for exchanging a data from 3D model library to other softwares such as Microstation, AutoCad and Excel and was connected with MS Access database. The developed information model interface module would improve the design quality of the modular pier and reduce the time and cost for design. Updated 3D information models could be utilized for the fabrication, assembly, and construction process for modular piers.

A Study on the Issue Analysis and the IFC Compatibility Review on BIM S/W for Application of BIM in National Road Project (국도 도로공사의 BIM적용을 위한 상용소프트웨어 간 IFC 호환성 검토 및 문제점 분석에 관한 연구)

  • Yang, Jung-Min;Yang, Sung-Hoon;Choi, Won Sik
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.11a
    • /
    • pp.1304-1306
    • /
    • 2012
  • 최근 건설 산업에서는 비용 절감과 공기 단축 등 건설 프로세스의 새로운 대안으로 BIM(Building Information Modeling)의 효용성이 널리 알려지며 대형건설사와 건축사사무소를 중심으로 BIM 적용을 위한 다양한 시도가 이뤄지고 있다. 이러한 과정은 다양한 분야의 전문가들의 협업으로 이루어지기 때문에 작업자간의 원활한 설계 정보 공유를 위해서는 각기 다른 BIM 소프트웨어에서 만들어 내는 데이터간의 정보호환이 필요하다. 이에 본 논문에서는 빌딩스마트(buildingSMART International, BSI)가 제시한 건축, 엔지니어링, 시공 분야(AEC)의 데이터 교환을 위한 국제 표준인 IFC(Industry Foundation Classes)를 이용하여 이기종 파일 간 호환성 검토 및 문제점 분석을 통해 정보모델개발의 기반자료로 활용하고자 한다.