References
- Aibinu, A. A., Carter, S., Francis, V., Vaz-Serra, P. (2020). Request for Information Frequency and Their Turnaround Time in Construction Projects: A Data-analytic Study, Built Environment Project and Asset Management, 10(1), pp. 1-15.
- Baghalzadeh Shishehgarkhaneh, M., Keivani, A., Moehler, R. C., Jelodari, N., Roshdi Laleh, S. (2022). Internet of Things (IoT), Building Information Modeling (BIM), and Digital Twin (DT) in Construction Industry: A Review, Bibliometric, and Network Analysis. Buildings, 12(10), 1503.
- Bryde, D., Broquetas, M., Volm, J. M. (2013). The Project Benefits of Building Information Modelling (BIM), International Journal of Project Management, 31(7), pp. 971-980. https://doi.org/10.1016/j.ijproman.2012.12.001
- Chen, L., Luo, H. (2014). A BIM-based Construction Quality Management Model and Its Applications, Automation in Construction, 46, pp. 64-73. https://doi.org/10.1016/j.autcon.2014.05.009
- Eadie, R., Browne, M., Odeyinka, H., McKeown, C., McNiff, S. (2013). BIM Implementation Throughout the UK Construction Project Lifecycle: An Analysis, Automation in Construction, 36, pp. 145-151. https://doi.org/10.1016/j.autcon.2013.09.001
- Ham, N. H., Yuh, O. K. (2023). Performance Analysis and Assessment of BIM-based Construction Support with Priority Queuing Policy, Buildings, 13(1), 153.
- Ham, N., Moon, S., Kim, J. H., Kim, J. J. (2020). Optimal BIM Staffing in Construction Projects Using a Queueing Model, Automation in Construction, 113, 103123.
- Higgins Jr, D., Fryer, S. (2013). Using the Forward Thinking Index to Measure Request for Information Submission Effectiveness. 49th ASC Annual International Conference Proceedings, San Luis Obispo, CA., pp. 10-13.
- Huh, S. H., Ham, N., Kim, J. H., Kim, J. J. (2023). Quantitative Impact Analysis of Priority Policy Applied to BIM-based Design Validation, Automation in Construction, 154, 105031.
- Kim, D. S., Choi, H. M., Kim, J. H. (2014). A Proposal of BIM Work Process to Support Construct-ability Analysis from Practitioners Viewpoint, Journal of the Korea Institute of Building Construction, 14(6), pp. 561-569. https://doi.org/10.5345/JKIBC.2014.14.6.561
- Kim, H. J., Yoo, M. Y., Kim J. J., Choi, C. S. (2017). Performance Analysis of BIM Labor Using Case Analysis, Journal of the Korea Institute of Building Construction, 7(3), pp. 31-39.
- Kim, H. S. (2010). Revealing Issues and Prospects of Domestic Construction by Analysis of BIM Case Studies, Construction, 54(1), pp. 65-69.
- Kim, M. K, Kang, C., Koh, I, L. (2022). A Basic Study on Establishing Information System of Each Stage to Adopt the Current Architecture Process Based BIM -Focusing on the Drawing and Form Composition Information-, Journal of the Korea Academia-Industrial Cooperation Society, 23(4), pp. 531-540. https://doi.org/10.5762/KAIS.2022.23.4.531
- Kim, W. J., Park, J. H., Cha, Y, O., Hyun, C, T., Han, S, W. (2016). Development of Checklist for BIM Model Requirements in Construction Phase, Korean Journal of Construction Engineering and Management, 20(1), pp. 22-31.
- Lau, S. E. N., Zakaria, R., Aminudin, E., Saar, C. C., Yusof, A., Wahid, C. M. F. H. C. (2018). A Review of Application Building Information Modeling (BIM) During Preconstruction Stage: Retrospective and Future Directions, IOP Conference Series: Earth and Environmental Science, 143(1), 012050. https://doi.org/10.1088/1755-1315/143/1/012050
- Lee, G., Park, H. K., Won, J. (2012). D3 City Project- Economic Impact of BIM-assisted Design Validation, Automation in Construction, 22, pp. 577-586. https://doi.org/10.1016/j.autcon.2011.12.003
- Li, X., Xu, J., Zhang, Q. (2017). Research on Construction Schedule Management Based on BIM Technology, Procedia Engineering, 174, pp. 657-667.
- Liu, Z., Osmani, M., Demian, P., Baldwin, A. (2015). A BIMaided Construction Waste Minimisation Framework, Automation in Construction, 59, pp. 1-23. https://doi.org/10.1016/j.autcon.2015.07.020
- Messner, J. (2023). BIM Project Execution Planning Guide, Vesion 3.0. Penn State Computer Integrated Construction Research Program. https://psu.pb.unizin.org/bimprojectexecutionplanning/.
- Morales, F., Herrera, R. F., Rivera, F. M. L., Atencio, E., Nunez, M. (2022). Potential Application of BIM in RFI in Building Projects, Buildings, 12(2), 145.
- Parsamehr, M., Perera, U. S., Dodanwala, T. C., Perera, P., Ruparathna, R. (2023). A Review of Construction Management Challenges and BIM-based Solutions: Perspectives from the Schedule, Cost, Quality, and Safety Management, Asian Journal of Civil Engineering, 24(1), pp. 353-389. https://doi.org/10.1007/s42107-022-00501-4
- Sompolgrunk, A., Banihashemi, S., Mohandes, S. R. (2023). Building Information Modelling (BIM) and the Return on Investment: A Systematic Analysis, Construction Innovation, 23(1), pp. 129-154. https://doi.org/10.1108/CI-06-2021-0119
- Sulankivi, K., Kahkönen, K., Makela, T., Kiviniemi, M. (2010). 4D-BIM for Construction Safety Planning, Proceedings of W099-special Track 18th CIB World Building Congress, 2010, pp. 117-128.
- Toyin, J. O., Mewomo, M. C. (2022). Overview of BIM Contributions in the Construction Phase: Review and Bibliometric Analysis, Journal of Information Technology in Construction, 28, pp. 500-514. https://doi.org/10.36680/j.itcon.2023.025
- Walasek, D., Barszcz, A. (2017). Analysis of the Adoption Rate of Building Information Modeling [BIM] and its Return on Investment [ROI], Procedia Engineering, 172, pp. 1227-1234. https://doi.org/10.1016/j.proeng.2017.02.144
- Wanberg, J., Harper, C., Hallowell, M. R., Rajendran, S. (2013). Relationship between Construction Safety and Quality Performance, Journal of Construction Engineering and Management, 139(10), 04013003.
- Whitlock, K., Abanda, F. H., Manjia, M. B., Pettang, C., Nkeng, G. E. (2018). BIM for Construction Site Logistics Management, Journal of Engineering, Project, and Production Management, 8(1), 47.
- Won, J., Lee, G. (2016). How to Tell if a BIM Project is Successful: A Goal-driven Approach, Automation in Construction, 69, pp. 34-43. https://doi.org/10.1016/j.autcon.2016.05.022
- Yoon, S, W., Kim, S, A., Choi, J, M., Kem, D, Y. (2015). A Proposal for Using BIM Model Created in Design to Construction Phase - Case Study on Preconstruction Adopting BIM -, Journal of Korean Institute of BIM, 5(4), pp. 1-10.