Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.4
/
pp.77-84
/
2018
As the application of BIM (Building Information Modeling) to the civil sector has become practical, and mandatory for road projects, the standardization, development of systems, etc. for the application and operation of BIM are required. In particular, it is important to develop BIM data standards for producing, sharing and managing the lifecycle data of civil facilities because they are commonly national public facilities. The BIM data standards have been developed by utilizing or extending IFC (Industry Foundation Classes), which is an international standard, but schema extensions of river facilities has not been developed thus far. This study proposes an approach to an IFC extension for river facilities using the WBS (Work Breakdown Structure) as a fundamental study for IFC-based schema extension in the river field. For this purpose, the research was carried out as follows. First, the IFC extension development method was selected to represent the river facilities by analyzing the existing IFC structure and previous research cases for the IFC extension. Second, extended elements of the river facilities were identified through an analysis of the WBS and classified according to the high-level structure of the IFC schema. Third, the classified elements were arranged based on the IFC hierarchy and the IFC schema extension for river facilities was established. Based on the suggested extension method of IFC schema, this study developed the schema by defining the element components and parts of river facilities, such as distribution flow elements and deriving their detailed types and properties.
Journal of the Korea Institute of Building Construction
/
v.22
no.5
/
pp.473-483
/
2022
BIM(Building Information Modeling) is a technology that can manage information throughout the entire life cycle of the construction industry and serves as a platform for improving productivity and integrating the entire construction industry. Currently, BIM is actively applied in developed countries, and its use at various overseas construction sites is increasing This is unclear. due to air shortening and budget savings. However, there is still a lack of institutional basis and technical limitations in the domestic construction sector, which have led to the lack of utilization of BIM. Various activation measures and institutional frameworks will need to be established for the early establishment of these productive BIMs in Korea. Therefore, as part of the research for the domestic settlement and revitalization of BIM, this study derived a number of key factors necessary for the development of the construction industry through brainstorming and expert surveys using AHP techniques and analyzed the relative importance of each factor. In addition, prior surveys by a group of experts resulted in 1, 3 items in level, 2, 9 items in level, and 3, 27 items in level, and priorities analysis was performed through pairwise comparisons. As a result of the AHP analysis, it was found that the relative importance weight of policy aspects was highest in level 1, and the policy factors in level 2 and the cost-based and incentive system introduction factors were considered most important in level 3. These findings show that the importance of the policy guidance or institutions underlying the activation of BIM rather than research and development or corporate innovation is relatively high, and that the preparation of policy plans by public institutions should be the first priority. Therefore, it is considered that the development of a policy system or guideline must be prioritized before it can be advanced to the next activation stage. The use of BIM technologies will not only contribute to improving the productivity of the construction industry, but also to the overall development of the industry and the growth of the construction industry. It is expected that the results of this study can provide as useful information when establishing policies for activating BIM in central government, relevant local governments, and related public institutions.
This paper describes a quantitative approach to the BIM-enabled assessment of building circulation by using quantitative data and applying its weight. Assessment of building circulation plays an important role before construction stage because of related requirements regulated by design guide, building codes, etc. and design decision making as well. In this paper, Qualitative issue is mainly dealt with that are usually excluded from rule checking objects due to their implicit definition such as 'comfortable circulation'. A weighting framework is suggested using weighted data of circulation properties such as 1) metric distance, 2) number of passing spaces, 3) number of turning spaces, 4) window area of passing space, etc.
Journal of the Korea institute for structural maintenance and inspection
/
v.19
no.1
/
pp.81-89
/
2015
This study takes shear wall of reinforced concrete structure as study object, and the purpose of this study is to suggest structure BIM based on automatic reinforcing bar placement system applying set-based design through the most optimum reinforcing bar placement group that was selected by applying AHP (analytical hierarchy process) method from design step. For this, the most optimum reinforcing bar placement group was selected by pairwise comparison analysis on complex standard of multiple alternatives. And shear wall automatic reinforcing bar placement system has been developed, which can automatically generate members and arrange reinforcing bar by structure design algorithm and using open API (application programming interface) provided by a BIM software vendor. As a result, the most optimum reinforcing bar placement group of the highest weight, ALT1, was selected and was generated using Tekla Structure program.
Proceedings of the Computational Structural Engineering Institute Conference
/
2011.04a
/
pp.383-386
/
2011
본 논문에서는 철근콘크리트 구조물의 프레임부재 철근을 대상으로 배근 설계 및 철근 형상화 알고리즘을 구축하여 자동배근을 생성하는데 목적이 있다. 철근 콘크리트의 BIM 통합 설계 시스템은 철근 배근정보의 생성과 호환이 원활하지 않아 표준 정보 호환 체계가 구축되지 않은 실정이다. 기존 2차원 기반 프로세스에서는 철근 배근 설계에 있어 표준화된 기준에 따른 배근이 아닌 관행이나 일률적인 배근 지침에 따라 배근 상세를 정하고 있고, 2차원 배근 설계 결과만 제시하고 있어 상호 호환 가능한 철근 배근 정보데이터가 생성되지 않는다. 철근 콘크리트 구조에서의 철근 배근 정보를 생성하고 BIM 통합 구조 설계시스템에서의 정보 호환성을 확보하기 위해, 프레임부재 철근을 대상으로 구조 해석 데이터베이스와 통합 설계 플랫폼 간의 호환 시스템을 생성하고, 콘크리트학회 콘크리트 구조설계기준에 따른 배근 설계 및 철근 형상화 알고리즘을 구축하여 자동배근시스템(Integrated Reinforcement for Frame Members, 이하 IRFM)을 개발하는데 목적이 있다.
Journal of the Korean Association of Geographic Information Studies
/
v.24
no.4
/
pp.55-64
/
2021
In this study, the operation method and accuracy of Terrestrial Laser Scanner(TLS) are reviewed and discussed by experimental measurements, and guidelines of TLS surveying operation are proposed. Ground control points and TLS station points were measured by TS and/or GPS, in TLS observation experiments, and wood targets were used which designed by this study team. RMSE accuracy of TLS scan shows that TLS surveying operation can be used in the topographic mapping of 1/250 scale and level of 1/100 BIM, the drone data also used in TLS data completeness. Additionally, as the results of the field experiment, the guidelines for TLS surveying operartions were proposed.
Korean Journal of Construction Engineering and Management
/
v.21
no.5
/
pp.55-63
/
2020
Earthwork automation has emerged as a promising technology in the construction industry, and the application of earthwork automation technology is starting from the acquisition and processing of point cloud data of the site. Point cloud data has more than a million data due to vast extent of the construction site, and the processing time of the original point cloud data is critical because it takes tens or hundreds of hours to generate a Digital Terrain Model (DTM), and enhancement of the processing time can largely impact on the efficiency of the modeling. Currently, a benchmark program (BP) is actively used for the purpose of both point cloud data processing and BIM design as an integrated program in Korea, however, there are some aspects to be modified and refined. This study modified the BP, and developed an updated program by adopting a compile-based development environment, newly designed UI/UX, and OpenGL while maintaining existing PCD processing functions, and expended compatibility of the PCD file formats. We conducted a comparative test in terms of loading speed with different number of point cloud data, and the results showed that 92 to 99% performance increase was found in the developed program. This program can be used as a foundation for the development of a program that reduces the gap between design and construction by integrating PCD and earthwork BIM functions in the future.
Korean Journal of Construction Engineering and Management
/
v.18
no.3
/
pp.63-73
/
2017
In contemporary society, it is increasingly common to spend more time indoors. As such, there is a continually growing desire to build comfortable and safe indoor environments. Along with this trend, however, there are some serious indoor-environment challenges, such as the quality of indoor air and Sick House Syndrome. To address these concerns the government implements various systems to supervise and manage indoor environments. For example, green building certification is now compulsory for public buildings. There are three categories of green building certification related to indoor air in Korea: Health-Friendly Housing Construction Standards, Green Standard for Energy & Environmental Design(G-SEED), and Indoor Air Certification. The first two types of certification, Health-Friendly Housing Construction Standards and G-SEED, evaluate data in a drawing plan. In comparison, the Indoor Air Certification evaluates measured data. The certification using data from a drawing requires a considerable amount of time compared to other work. A 2D tool needs to be employed to measure the area manually. Thus, this study proposes an automatic assessment process using a Building Information Modeling(BIM) model based on 3D data. This process, using open source Industry Foundation Classes(IFC), exports data for the certification system, and extracts the data to create an Excel sheet for the certification. This is expected to improve the work process and reduce the workload associated with evaluating indoor air conditions.
Journal of the Korea Institute of Building Construction
/
v.23
no.5
/
pp.651-662
/
2023
Recently, research on the use of Building Information Modeling(BIM) for various construction management activities is being actively conducted, and interest in 3D model-based estimation is increasing because it has the advantage of being able to be automatically performed using the attribute information of the 3D model. Therefore, this study aimed that the difference in the quantities is calculated the quantity based on the 2D drawing of a building and is extracted from the 3D model created by the Revit software was compared and tried to find out the cause. The difference in the quantity calculated by the two methods was the largest in the formwork, followed by the smallest in the order of the quantity of rebar and concrete. The reason for this difference is that there is a part where the quantity extraction in the 3D model is not suitable for the quantity calculation standard, and in particular, in the case of formwork, it was difficult to separate only the quantity of the necessary part. In addition, since the quantity of rebar was not separated by member, it was impossible to accurately compare the quantity and identify the cause of the difference. Therefore, it is considered to be the most reasonable to use application software that imports only the numerical information necessary for quantity calculation from the 3D model and applies a separate calculation formula.
Kim, Yo-Han;Lee, Baek-Rae;Kim, Ju-Hyung;Kim, Jae-Jun
Journal of KIBIM
/
v.1
no.1
/
pp.18-25
/
2011
Construction cost estimation in the early phase provides the opportunity to make reasonable decisions related to the project. For estimating this cost, various methods have been developed. But several problems have been recognized like accuracy, relation beteewn design and cost etc. In this study, we developed the method of cost estimating for building parts. The modified method has defferent ratio of space functions to calculate cost more correctly. Also historical cost data is used in this modified method for architects to estimate cost conveniently. By this modified method, we expects architects should easily design buildings based on cost.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.