The Study on the Development of Automatic Rebar Placement System Applying Selection Method of Optimum Reinforcing Bar Group on Shear Wall |
Cho, Young-Sang
(한양대학교 ERICA 캠퍼스 건축학부)
Kim, Dong-Eun (한양대학교 건축공학과) Jin, Hyun-Ah (한양대학교 첨단건축도시환경공학과) Jang, Hyun-Suk (한양대학교 첨단건축도시환경공학과) |
1 | An, S. W. (2008), A Study of Choosing the Type of Bridge Structurein a Housing Site Development Areaby Applying AHP, Master's Thesis, Hanynag University, Seoul, Korea. |
2 | Cho, H. H., Kyung, I. K. (1996), Survey on actual condition of rebar manufacturing works in Domestic, Proceeding of Annual Conference of the Architectural Institute of Korea, The Architectural Institute of Korea, 16(2), 771-773 (in Korean). |
3 | Cho, Y. S., Jin, H. A., Jang, H. S., Hong, S. C. (2014), A Study on the Establishment of the Automatic Rebar Placement System for Reinforced Concrete Mat Foundation based on S-BIM, Journal of the Architectural Institute of Korea Structure & Construction, The Architectural Institute of Korea, 30(4), 27-34 (in Korean). DOI |
4 | Choi, O. Y., Cho, H. G., Kim, G. H. (2010), The Selection of Roof Waterproofing Methods using the Analytic Hierarchy Process (AHP) Technique, Journal of the Korea Institute of Building Construction, The Korea Institute of Building Construction, 10(4), 95-103 (in Korean). 과학기술학회마을 DOI ScienceOn |
5 | Eom, J. U., Sin, T. S. (2011), A Development of Interface Module between Structural Design and Detail Design based on BIM, Journal of Korean Society of Steel Construction, The Korean Society of Steel Construction, 23(1), 113-124 (in Korean). 과학기술학회마을 |
6 | Iris, D., Tommelein, Glenn Ballad (2005), Restructuring the Rebar Supply System, Proceedings Construction Research Congress, ASCE., San Diego, California, 5-7. |
7 | Jang, J. W. (2013), Development of Rebar Placement System of R.C Foundation using Lean Design Technique based on Structural BIM (S-BIM), Master's Thesis, Hanynag University, Seoul, Korea. |
8 | Kim, Y. R,, Cho, Y. S. (2009), The Study on Application of Korean BIM Process in the Structural Design Phase based on a Case Study, Journal of the Architectural Institute of Korea Structure & Construction, The Architectural Institute of Korea, 25(10), 19-26 (in Korean). 과학기술학회마을 |
9 | Korea Price Information (http://www.kpi.or.kr/www/). |
10 | Lee, S. I., Kwon, N. H., Cho, Y. S. (2011), A Study on the Application Methodology for BIM based Set-based Design Approach, Journal of the Architectural Institute of Korea Structure & Construction, The Architectural Institute of Korea, 27(7), 11-19 (in Korean). 과학기술학회마을 |
11 | Midas Gen On-line Manual. |
12 | Min, J. H., Song, Y. M. (2004), PROMETHEE for Multicriteria Decision Making, Sogang Journal of Business, Sogang University Institute for Business Research, 14(2), 109-127 (in Korean). |
13 | Tekla Open API Reference for Tekla Structures 19.0, Autodesk API Guide Line. |