• Title/Summary/Keyword: BIM 기반 협업 설계

Search Result 32, Processing Time 0.042 seconds

A Strategy for Building BIM+PMIS System (BIM+PMIS 시스템 구축 전략)

  • Yoon, Su-Won;Chin, Sang-Yoon;Shin, Tae-Hong;Choi, Cheol-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.61-67
    • /
    • 2008
  • BIM has been increasingly deployed to the construction industry in order to minimize ambiguity and to reduce errors of the communicated engineering information, for which poor communication due to fragmented industrial structure is mainly responsible. Known BIM use cases and related researches are focusing either (1) on a specialized solution for a given specialty area (e.g. structural engineering planning and early design, material take-off, constructability simulation, etc.), or (2) on handling interoperabillty issues with Industrial Foundation Classes (IFC); Neither of these approaches have sufficiently catered for collaboration and information management in actual construction projects. This paper proposes the strategy for BIM+PMIS (project management information system) system focused on improving PMIS which has been commercially provided with ASP(Application Service Provider). It also describes the architecture of the BIM-based information management module prototype, which is a key component of the BIM+PMIS system.

  • PDF

Development of BIM-based CPLM System for Civil Project Management (토목 프로젝트 관리를 위한 BIM 기반 CPLM 시스템 개발)

  • Lee, Kwang-Myong;Lee, Chang-Woo;Han, Song-Yi;Kang, Hyoung-Seok;Noh, Sang-Do
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.24-29
    • /
    • 2011
  • BIM technology, based on 3D model of civil engineering structures, creates and manages information of the structures throughout four stages: Planning, design, construction, and maintenance. BIM is now used around the globe for improvement of the construction productivity. However, in order to expect the efficient engineering work, collaboration system between participants in a construction project is necessary. Therefore, in this paper BIM based CPLM (Construction project lifecycle management) system was designed and developed by analyzing the requirements of participants of a construction project. CPLM system offers an environment which enables the sharing and management of information according to the each stage of construction. CPLM is expected to aid cooperative decision-making during the overall construction process through the process innovation and the efficient data management.

The Simulation Function Analysis for BIM based construction planning (BIM기반 시공계획의 시뮬레이션 기능 분석 연구)

  • Jun, Ki-Hyun;Kim, Chang-Seob;Yun, Seok-Heon
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.95-98
    • /
    • 2011
  • 건설공사 프로젝트는 사전 기획 단계, 설계, 계약, 시공, 운영 및 유지관리 등 각 단계의 다양한 참여 주체에 의해 프로젝트가 진행되고 각 분야 간의 원활한 의사소통을 통한 협력 작업으로 일을 진행한다. 그러나 각 단계별 참여주체간의 협업이 어렵고 정보교류가 원활하지 못한 문제점들이 있다. 또한 건설공정은 현장여건의 변화와 불확실성으로 인해 예측이 어렵고, 보다 신뢰성이 있는 계획의 부재로 인하여 각종 세부 공정들 간의 간섭을 유발하고 계획된 일정을 준수하기 어려워 불필요한 비용의 낭비와 공사기간의 증가를 야기한다. 이러한 낭비요인을 최소화하고 건축 프로젝트를 진행하는데 있어서 효율성을 높이기 위해서는 시공계획 단계의 신뢰성을 높여야 한다. 따라서 시공전의 계획 단계에서부터 4D 시뮬레이션을 통하여 이러한 문제점들을 파악하고 개선하는 것이 중요하다. 본 연구에서는 BIM기반의 시뮬레이션 프로그램의 기능분석을 통하여 효율적인 적용과 발전과정을 알아보고자 한다.

  • PDF

Analitic study of the PSC box structure based on BIM (BIM기반의 PSC 박스 구조물의 해석기법)

  • Lee, Heon-Min;Park, Jae-Geun;Jo, Sung-Hoon;Choi, Jung-Ho;Shin, Hyun-Mock
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.179-180
    • /
    • 2009
  • Recently Development of construction system that subjective operators share and control information efficiently based on the three-dimensional space and design information throughout life cycle of construction project is progressing dynamically. In this study, therefore, we research about interface method between 3-D modeling data for civil-structure-design, especially psc-box-girder design and analysis program, and analysis method of the psc box structure based on BIM(Building Information Management)

  • PDF

A Study on the Effects of BIM Adoption and Methods of Implementationin Landscape Architecture through an Analysis of Overseas Cases (해외사례 분석을 통한 조경분야에서의 BIM 도입효과 및 실행방법에 관한 연구)

  • Kim, Bok-Young;Son, Yong-Hoon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.45 no.1
    • /
    • pp.52-62
    • /
    • 2017
  • Overseas landscape practices have already benefited from the awareness of BIM while landscape-related organizations are encouraging its use and the number of landscape projects using BIM is increasing. However, since BIM has not yet been introduced in the domestic field, this study investigated and analyzed overseas landscape projects and discussed the positive effects and implementation of BIM. For this purpose, landscape projects were selected to show three effects of BIM: improvement of design work efficiency, building of a platform for cooperation, and performance of topography design. These three projects were analyzed across four aspects of implementation methods: landscape information, 3D modeling, interoperability, and visualization uses of BIM. First, in terms of landscape information, a variety of building information was constructed in the form of 3D libraries or 2D CAD format from detailed landscape elements to infrastructure. Second, for 3D modeling, a landscape space including simple terrain and trees was modeled with Revit while elaborate and complex terrain was modeled with Maya, a professional 3D modeling tool. One integrated model was produced by periodically exchanging, reviewing, and finally combining each model from interdisciplinary fields. Third, interoperability of data from different fields was achieved through the unification of file formats, conversion of differing formats, or compliance with information standards. Lastly, visualized 3D models helped coordination among project partners, approval of design, and promotion through public media. Reviewing of the case studies shows that BIM functions as a process to improve work efficiency and interdisciplinary collaboration, rather than simply as a design tool. It has also verified that landscape architects could play an important role in integrated projects using BIM. Just as the introduction of BIM into the architecture, engineering and construction industries saw great benefits and opportunities, BIM should also be introduced to landscape architecture.

Version Control System for BIM-based Collaborative Architectural Design (BIM 기반의 협력적인 건축 설계를 위한 Version Control 시스템)

  • Bae, Hong-Min;Kim, Byung-Seo;Chung, Jae-Hee
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.17 no.3
    • /
    • pp.275-282
    • /
    • 2017
  • Revit program is one of the architectural design programs based on the BIM (Building Information Modeling) technology, which is attracting attention as a next-generation three-dimensional architectural design technique. Revit is a program that enhances the information input side and makes it easy to understand components by making it an object called an information family of components from the design stage, but there is no program that easily compares the drawing output files extracted from this program. It is difficult to analyze the changes to the same drawings modified at the time of collaboration and easily share the drawing information. In this paper, we propose and implement a version management system for the output files on the same drawing, so that the parallel collaboration work of output drawing files through Revit can be efficiently performed. We propose an improved KMP algorithm.

IFC-based Data Structure Design for Web Visualization (IFC 기반 웹 가시화를 위한 데이터 구조 설계)

  • Lee, Daejin;Choi, Wonik
    • Journal of KIISE
    • /
    • v.44 no.3
    • /
    • pp.332-337
    • /
    • 2017
  • When using IFC data consisting of STEP schema based on the EXPRESS language, it is not easy for collaborating project stakeholders to share BIM modeling shape information. The IFC viewer application must be installed on the desktop PC to review the BIM modeling shape information defined within the IFC, because the IFC viewer application not only parse STEP structure information model but also process the 3D feature construction for a 3D visualization. Therefore, we propose a lightweight data structure design for web visualization by parsing IFC data and constructing 3D modeling data. Our experimental results show the weight reduction of IFC data is about 40% of original file size and the web visualization is able to see the same quality with all web browsers which support WebGL on PCs and smartphones. If applied research is conducted about the web visualization based on IFC data of the last construction phase, it could be utilized in various fields ranging from the facility maintenance to indoor location-based services.

A Study on the Issue Analysis and the IFC Compatibility Review on BIM S/W for Application of BIM in National Road Project (국도 도로공사의 BIM적용을 위한 상용소프트웨어 간 IFC 호환성 검토 및 문제점 분석에 관한 연구)

  • Yang, Jung-Min;Yang, Sung-Hoon;Choi, Won Sik
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.11a
    • /
    • pp.1304-1306
    • /
    • 2012
  • 최근 건설 산업에서는 비용 절감과 공기 단축 등 건설 프로세스의 새로운 대안으로 BIM(Building Information Modeling)의 효용성이 널리 알려지며 대형건설사와 건축사사무소를 중심으로 BIM 적용을 위한 다양한 시도가 이뤄지고 있다. 이러한 과정은 다양한 분야의 전문가들의 협업으로 이루어지기 때문에 작업자간의 원활한 설계 정보 공유를 위해서는 각기 다른 BIM 소프트웨어에서 만들어 내는 데이터간의 정보호환이 필요하다. 이에 본 논문에서는 빌딩스마트(buildingSMART International, BSI)가 제시한 건축, 엔지니어링, 시공 분야(AEC)의 데이터 교환을 위한 국제 표준인 IFC(Industry Foundation Classes)를 이용하여 이기종 파일 간 호환성 검토 및 문제점 분석을 통해 정보모델개발의 기반자료로 활용하고자 한다.

A Study of BIM-based Construction Management Work Process Development in Design Phase (설계단계의 BIM기반 CM 업무 프로세스 개발에 관한 연구 - 설계관리 업무를 중심으로 -)

  • Lee, Seoyun;Ham, Namhyuk;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.90-101
    • /
    • 2013
  • A typical construction project involves participation of various parties including clients, contractors, architects, and engineers for its successful completion, and yet has intrinsic differences of interests among the participants during the project execution period. A construction management (CM) services's role is then to resolve these differences of interests among the participants during the project execution, and lead the projects to its successful completion while representing the clients' demands and interests. The use of building information modeling (BIM) is increasing recently among construction projects, and those CM service companies are experiencing difficulties applying BIM. This is because the use of BIM in construction projects suggests a quite new set of operational paradigm. The purpose of this paper is then to review the recent cases of projects which used BIM; to analyze the these projects' processes; to reengineer the design phase process based on the lessons learned from recent BIM application; and to suggest a modified design phase process model that could improve the use of BIM and related coordination operations.

A Case Study of BIM-based Framework on Constructability Tasks (BIM기반 골조공사의 시공성분석 업무 적용사례에 관한 연구)

  • Lee, Seung-Il;Kwon, Nam-Ha;Cho, Young-Sang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.45-54
    • /
    • 2010
  • Recently more and more construction projects have become high-rise, complex and intelligent. Accordingly, such projects require an integrated management system for tasks, with a lean approach to construction with work processes for management and productivity. In particular, Construction Information Technology (CIT) fields are concerned with Building Information Modeling (BIM), which represents the process of generating and managing building data during its life cycle. Constructability research has progressed for the project goal which is a cost-time-quality of optimization by integrated construction knowledge and experience. However, the current constructability process has not been performed efficiently, as the existing 2D drawings and papers lack consistent and accurate information, it is difficult to share the contents of work, and the use of information is inefficient. This study proposes that the reformation and enhancement of BIM-based constructability work process can lead to brilliant performance in the framework of the construction phase through achieving collaboration between the design team and the workers at the site.