• Title/Summary/Keyword: BIM 기반 정보 관리

Search Result 205, Processing Time 0.032 seconds

Integrated Information Management for Composite Object Properties in BIM (BIM 복합객체에 대한 속성정보의 통합관리)

  • Kim, Karam;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.97-105
    • /
    • 2015
  • Building information modeling (BIM)-based construction projects have increased and become more varied, and as such the management of BIM-based facility information is also increasingly important for facility maintenance. Information management, and specifically product data mapping, however, has some problems in the area of manual data entry and does not adequately consider the exchange requirements of facility maintenance. Therefore, it is necessary to introduce a method to improve the management of composite object information for BIM-based facility maintenance so that it can handle construction operation building information exchange (COBie) data for a composite object. Therefore, we present a method to map COBie data to related materials of a composite object. This research contributes to increasing the efficiency and accuracy of the required information mapping between a building model and product data using a BIM library through optimal BIM data adoption. Moreover, it allows for the creation and management of specific product data at the design development phase.

A Framework Integrating Cost and Schedule based on BIM using IFC (IFC활용 BIM기반 공정/원가 통합관리 프레임워크)

  • Lee, Jin-Gang;Lee, Hyun-Soo;Park, Moonseo;Jung, Minhyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.53-64
    • /
    • 2013
  • In building construction project, there are numerous information or data parts across many different software applications and professional specialists. BIM (Building Information Modeling), as a medium for managing information generated during construction project, it is intended to enhance the effectiveness of construction management and reap a lot of advantages such as, automatic quantity takeoff, error-free estimation, 4D(3D+Time), 5D(4D+Cost) simulation. Nevertheless, the overall and practical effectiveness of BIM utilization is difficult to justify at this stage. While helpful, there are some limitation when BIM applied to construction management due to the differences of data processing process between BIM and work in the field, limitations of information generated from BIM object and interoperability problem among BIM application. Therefore, this paper propose a framework integrating BIM with cost-schedule information using IFC. And we construct the system prototype based on the framework and performed case study to examine the framework. The proposed framework provides the information basis for BIM based cost-schedule integration. ultimately, the framework increase the utilization of BIM and work efficiency of construction industry by supporting an understanding of information.

Effectiveness Analysis of BIM-based Architectural Facility Management Scenario (BIM 기반 건축 시설물 유지관리 시나리오 효과 분석)

  • Kang, Tae-Wook;Kim, Ji-Eun;Choi, Hyun-Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.10-19
    • /
    • 2016
  • Recently, according to a public order with BIM regulations, various technologies of facility management (FM) have been studied to use BIM data effectively. The technology for BIM-based FM, such as BIM data standard, BIM modeling, BIM server, and BIM-GIS platform, reverse engineering based on 3D image scans is developing constantly. On the other hand, there has been little research on the range of FM based on BIM, the role of actors by management works, the difference, and difference in effects between original FM and BIM-based FM. This study examined the scenario of architectural FM based on BIM and confirmed the effect. For this, after analyzing the research trends, the range of FM applications and the role of actors by management works were defined, and the effectiveness analysis of a BIM-based architectural FM scenario was deduced.

An logical Investigation for utilization of BIM in Facility Management Phase (시설물 유지관리 단계에 BIM 활용을 위한 이론적 고찰)

  • Yang, Sung-Hoon;Choi, Won-Sik
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.11a
    • /
    • pp.1242-1244
    • /
    • 2012
  • 최근 건설 산업의 패러다임으로 부각중인 BIM 기술은 기획 설계 시공 단계를 거쳐 유지관리 단계에서의 활용성을 넓히고 있으며 시설안전공단에서는 총 5만 6,450개 이르는 국내 사회간접자본(SOC)인 시설물 유지관리에 BIM 기술을 도입하기위한 연구를 진행중에 있다. 현재 국내에서는 웹 기반 시설물관리 시스템(FMS : Facility Management System)을 통해 국내 시설물의 기본정보와 점검 및 관리 정보를 서비스 중에 있으나 대상 시설물의 설계도면 및 유지관리 도면, 안전점검 실사 보고서 등이 2D 기반으로 유통되고 있어 BIM 적용을 위한 많은 체계마련이 시급한 실정이다. 이에 본 논문에서는 2D 기반의 시설물 유지관리 체계에 BIM을 활용하기위한 방안을 제안하고자 하였다.

A Strategy for Building BIM+PMIS System (BIM+PMIS 시스템 구축 전략)

  • Yoon, Su-Won;Chin, Sang-Yoon;Shin, Tae-Hong;Choi, Cheol-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.61-67
    • /
    • 2008
  • BIM has been increasingly deployed to the construction industry in order to minimize ambiguity and to reduce errors of the communicated engineering information, for which poor communication due to fragmented industrial structure is mainly responsible. Known BIM use cases and related researches are focusing either (1) on a specialized solution for a given specialty area (e.g. structural engineering planning and early design, material take-off, constructability simulation, etc.), or (2) on handling interoperabillty issues with Industrial Foundation Classes (IFC); Neither of these approaches have sufficiently catered for collaboration and information management in actual construction projects. This paper proposes the strategy for BIM+PMIS (project management information system) system focused on improving PMIS which has been commercially provided with ASP(Application Service Provider). It also describes the architecture of the BIM-based information management module prototype, which is a key component of the BIM+PMIS system.

  • PDF

A Study on the Development of the Pilot Test Model to Examine the Applicability of the BIM Technology to PMIS (BIM 기술 기반 PMIS 개발에 관한 실험적 연구)

  • Choi, Jeong-Min;Ock, Jong-Ho;Kim, Sung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.315-320
    • /
    • 2008
  • Construction industry have been occurred to the various demand of information. Also information quantity is increasing therefore, The role of information systems is important. Recently PMIS, an efficient decision-making support instrument of construction industry, is applied to various projects. However, its utility is still not enough. So this study suggests the concept model on the basis BIM to settle such a problem. Building the Pilot System was based on this study, and present the direction from Advanced PMIS.

  • PDF

COBie Document Prototype for supporting BIM based Smart Maintenance of Buildings (BIM 기반 건축물 스마트 유지관리 지원 COBie 문서 프로토타입)

  • Koo, Kyo-Jin;Park, Sang-Hun;Cho, Dong-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.12
    • /
    • pp.60-68
    • /
    • 2019
  • For effective building maintenance, the collection and management of various maintenance date such as work history information and material information is required. Despite the introduction of information management technologies and systems to reduce the amount of maintenance work of buildings, which have become larger and more complex, the maintenance information is not being utilized properly. As an alternative, research on the introduction and utilization of BIM is being conducted continuously. However, the BIM models generated at the design phase are not utilized in practice due to a lack of architectural maintenance information. This study proposed a COBie document prototype to support BIM-based smart maintenance tasks performed by building managers. In order to formalize various types of maintenance work procedures, a BIM-based maintenance process model is presented in two categories: inspection and maintenance. Among the BIM attribute data of the BIM model generated at the design phase, the parameters corresponding to the maintenance necessary information for each basic process are derived. Based on this, we proposed a COBie document prototype consisting of seven spreadsheets. The results of a case study confirmed that the KBIMS library-based BIM model created at the design phase without the maintenance information can be used at the maintenance phase.

A Study on the Application Service of 3D BIM-based Disaster Integrated Information System Management for Effective Disaster Response (효과적인 재난 대응을 위한 3차원 BIM 기반 재난 통합정보 시스템 활용 서비스 제시)

  • Kim, Ji-Eun;Hong, Chang-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.143-150
    • /
    • 2018
  • Periodic and systemic disaster management has become more important than ever owing to the recent continuous occurrence of disasters, such as fires, earthquakes, and flooding. This management goes beyond simple disaster preparedness, which was introduced minimally under the existing legal system. For effective disaster management, facilities should be managed through regular maintenance on a daily basis, and in the case of an emergency, intuitive and accurate communication is essential regarding the situation and purpose. BIM manages the entire building property data using the effective 3D visualization model, so it can be used for various management purposes from design to facility maintenance. In this study, through an expert survey on the use of services in a BIM-based integrated disaster information system, the available areas of BIM data were organized in terms of facility information management, 3D visualization, and disaster control. Later, through the use service and DB definition within the BIM-based disaster integration information system, the main facilities monitoring and response services based on BIM and BIM-based spatial management service are proposed. Based on this study, it is hoped that the BIM-based application service functions within the system will be implemented to enable an effective system response.

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

Implementation of Quantity Estimation Database based on Efficiency Analysis of Quantity Information about BIM(Building Information Modeling) of Reinforced Concrete Structure through the Case Study (사례연구를 통한 RC구조 BIM에서의 물량정보 효율성 분석기반 물량산출 데이터베이스 구축)

  • Cho, Young-Sang;Bae, Jun-Seo;Kim, Yu-Ri
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.513-516
    • /
    • 2009
  • 본 논문에서는 사례연구를 통하여 RC구조 BIM에서의 물량정보 획득의 효율성을 분석하고 이를 기반으로 BIM 프로세스 환경에서의 철근 및 콘크리트 물량산출을 위한 데이터베이스를 구축하여 현장 시공단계에서의 공정 및 물량관리의 협업단계를 가능하도록 하는 철근 Sorting 시스템에 대한 연구를 목적으로 한다. 기존의 건설, 건축분야에서의 정보는 기호적 언어와 2차원 기반의 도면 정보체계를 통해 표현되었지만, BIM 기술을 통해 건물의 실제 형상과 정보를 가지는 3차원 기반의 정보체계로의 변화와 함께 컴퓨터 데이터베이스 내에서 프로젝트에 포함된 모든 정보를 저장하고, 다양한 형태로 필요에 따라 정보를 표현할 수 있게 변화하고 있다. 견적 및 시공을 위한 RC구조설계단계에서의 배근 모델은 협업을 위한 객체 정보의 획득 및 추출이 중요하지만 현재 상용되고 있는 BIM도구에서는 현재까지 미흡한 체계를 이루고 있다. 본 논문에서는 구조설계를 기반으로 배근된 BIM 구조모델 사례를 통하여 기존 BIM도구에서의 물량 정보획득 효율성 분석을 기반으로 객체들의 데이터베이스 구축을 통한 철근 Sorting 시스템 구축 연구를 통하여 협업단계에서의 체계적 물량정보 관리를 가능하도록 하였다.

  • PDF