It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.
In South Korea, there have been attempts to enhance BIM work practices in various aspects. Public Procurement Service(PPS) has recently published 'basic guidelines to improve BIM work practices in construction and facility management'. It defines roles and responsibilities of project members in their application of BIM. It also developed a set of modelling standards and guidelines for effective model creation, management and communication among BIM users. Moreover, numerous construction companies have tried to cultivate BIM specialized manpower throughout entire construction phases. However, there are still challenges faced by firms during BIM adoption. Therefore, this study aims to provide practical counsel for construction companies to help them create optimized facilities and deliver high performance by analyzing BIM-based domestic construction projects in Korea from 2009 and 2015. The study will investigate types of client, project, BIM application range, and application technology.
BIM은 단일모델을 이용해 다양한 시나리오로 활용 가능하다는 이점이 있다. BIM 모델을 통해 2D 도면을 자동으로 추출하는 점도 그 중의 하나이나, 이를 실무에서 그대로 활용하기에는 현실적으로 어려움이 따른다. 건축 상세도면은 실내재료 마감 및 복잡한 시공방법을 표현할 뿐 아니라 공사비 산정에 있어 매우 중요한 요소이다. 하지만 이를 BIM 환경에서 표현하는 공통적인 규칙이나 약속이 없고, 설계사별로 같은 의미의 상세도면을 각기 다른 형태로 보유하고 있어 건설산업차원에서의 정보공유 및 교환을 어렵게 한다. 따라서 본 연구에서는 건축 상세도면의 BIM 활용을 위해 부분상세 정보를 체계화하는 방법을 제시하고, BIM 라이브러리와 어떻게 연계되어 수량 및 공사비 산정의 기초자료로 활용되는지 파악한다. 본 연구는 건축 설계자가 설계 업무 진행시 BIM 라이브러리를 통하여 부분상세정보를 확인하고 단가정보, 자재정보 등과 연계되어 수량 및 공사비를 산출하는데 활용될 수 있다. 또한 BIM 라이브러리-기술콘텐츠 연계기술로 인해 BIM기반의 설계효율과 프로세스를 개선해 중소설계사무소의 효율적인 BIM 활용에 도움이 될 것이다.
최근 BIM은 국외의 적용 성공 사례를 통해 비용, 공기의 절감의 효과가 입증되어 건설업계에서 최대 이슈로 부각되고 있다. 본 논문에서는 기존 토목공사 설계단계의 업무와 정보관리 체계의 문제점을 파악한 후 설계 단계시 BIM기반의 토목공사 정보관리 모델을 제안한다. 논문에서 제시된 BIM기반 정보관리 모델은 교량공사를 대상으로 적용성을 검토하고 있으며, 이러한 설계단계의 지능화, 자동화된 통합정보관리는 참여자간의 효율적인 정보관리가 가능하도록 한다.
Kwangho So;Bohwan Oh;Yongjik Lee;Hyungeun Lee;Taehun Ha
국제학술발표논문집
/
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.12-16
/
2011
Building Information Modeling (BIM) is being widely spread in AEC industry worldwide and also in South Korea. Although the creation of digital model is better to be started at design stage, it can also improve the productivity of construction by simulating the actual construction process and environment. This paper presents application of BIM-based simulations related with design changes to transfer floors in 58-storey reinforced concrete office building. Transfer floor is not only a structurally important part of the building but also a challenging part of the actual construction in terms of sequence and period due to the complexity of the work. Preconstruction of rebar, mechanical, and plumbing is performed to review the construction drawings and to perform clash detection. Each item of application is evaluated for its effectiveness on actual construction and for the development potential.
The 6th International Conference on Construction Engineering and Project Management
/
pp.289-293
/
2015
The construction industry has been evolving with the development of information technology. According to this trend, the current industry changes from 2d drawings to Building Information Modeling(BIM). Current studies on the BIM-based estimation have problems such as Quantity Take-Off(QTO) specificity toward a particular software, the uncertainty of the amount in accordance with the model quality. These studies focus on QTO based on BIM rather than schematic estimation. In addition, studies on the connection with the QTO and unit cost for schematic estimation are insufficient. The purpose of this study is to propose schematic estimation process by utilizing construction codes and QTO in architectural object BIM libraries. Construction codes are classified in detail in order to input codes inside each. This study has connected unit cost and construction classification codes that obtain from BIM model. The results of this study will be helpful in decision-making and communication for schematic estimation of the design phase. It will improve the efficiency and reliability problems of existing schematic estimation.
건설 산업은 다른 산업에 비하여 많은 참여자가 있으며, 타 산업에 비하여 생산성이 많이 떨어지고 있다. 이에 본 연구에서는 BIM(Building Information Modeling)이 건설 산업의 생산성 향상에 큰 효과가 있을 것으로 파악하고, 건설산업에 적합한 BIM 적용 프로세스를 제안하고자 하였다. 이를 위하여 본 연구에서는 BIM에 대한 이론고찰과 기존 건설프로세스의 특성 분석을 통하여 개선사항들을 도출하였고, 개선사항을 해결하기 위한 BIM 적용 프로세스를 제시하였다. 그리고 개선 프로세스의 적용성 평가를 위하여 상용화된 BIM 관련 소프트웨어를 활용하여 Case Study를 수행하였다. Case Study 수행 결과 BIM Model의 건설 산업 적용 가능성과 BIM 적용 시 파급효과와 국내 적용을 위한 해결과제를 확인 할 수 있었다. 이를 토대로 국내 건설 산업의 BIM 적용에 이바지하는데 도움이 되고자 한다.
This study introduces a method of estimating the 3D coordinates of structural damage from the detection results of visual inspection provided in 2D image coordinates using sensing data of UAV and 3D shape information of BIM. This estimation process takes place in a virtual space and utilizes the BIM model, so it is possible to immediately identify which member of the structure the estimated location corresponds to. Difference from conventional structural damage localization methods that require 3D scanning or additional sensor attachment, it is a method that can be applied locally and rapidly. Measurement accuracy was calculated through the distance difference between the measured position measured by TLS (Terrestrial Laser Scanner) and the estimated position calculated by the method proposed in this study, which can determine the applicability of this study and the direction of future research.
The CM(Construction Manager) of D-university has been seeking the advice of my BIM-team to adopt CM(Construction Management) and BIM best practices to improve project delivery results, and has authored best practice reports for spatial validation, BIM, 3D, 4D and 5D performance. Building Information Modeling(BIM) Process, Integration, and Adoption looks at BIM implementation from a company and project level laying out a process for companies to use BIM. Following this studies, participants will be able to: 1. BIM participants has been creating a BIM process diagram for a project, and has been evaluating and selecting process options for a specific BIM project. 2. BIM participants has been describing the roles and responsibilities of participants in the BIM process, and has been communicating the BIM process to management, colleagues, and project stakeholders. 3. BIM participants has been identified consistent factors influencing BIM return on investment at the project level and the company level, and has been outlining a process for BIM adoption on the project level and company level.
Modular technology has become a major issue of the construction industries to enhance their productivity. Modular bridge construction generally requires the data exchange between the contractors, designers, fabricators and constructors. Therefore, a readily accessible information model interface module based on BIM technology is essential for their communication during a project life-cycle. In this study, BIM based information model interface module for a modular pier was developed. For the information models, the PBS(Product Breakdown Structure) and LOD(Level of Development) were defined. Next, all components of a modular pier were conducted by the parametric modeling technique, and then 3D cell library interface was developed. An nterface module was also developed using VBA(Visua basic Application) for exchanging a data from 3D model library to other softwares such as Microstation, AutoCad and Excel and was connected with MS Access database. The developed information model interface module would improve the design quality of the modular pier and reduce the time and cost for design. Updated 3D information models could be utilized for the fabrication, assembly, and construction process for modular piers.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.