• Title/Summary/Keyword: BIM디지털모델

Search Result 56, Processing Time 0.022 seconds

Development of Augmented Reality Tool for Architectural Design (건축설계 검증을 위한 증강현실 설계지원도구 개발)

  • Ryu, Jae-Ho
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.1
    • /
    • pp.49-62
    • /
    • 2015
  • In this study we have proposed the prototype of design support device for architectural design assessment using the building information modeling(BIM) data and the augmented reality(AR) technology. The proposed system consists of novel hardware composition with the transparent display, the mock-up model and the digital architectural model in the new shape of frame. The removal of background and the correction of viewer point in the capture video are proposed in order to use the transparent display in AR application. The BIM data formats are reviewed to be converted for using in AR application. Also the proposed system can be expanded to multi-user collaboration system from two user system through the suggested hardware and software compositions. The results of this study will be applied to use the mock-up model and digital architectural model in order to carry out the design assessment process efficiently and economically in the architectural design field.

Algorithm of Level-3 Digital Model Generation for Cable-stayed Bridges and its Applications (Level-3 사장교 디지털 모델 생성을 위한 알고리즘 및 활용)

  • Roh, Gi-Tae;Dang, Ngoc Son;Shim, Chang-Su
    • Journal of KIBIM
    • /
    • v.9 no.4
    • /
    • pp.41-50
    • /
    • 2019
  • Digital models for a cable-stayed bridge are defined considering data-driven engineering from design to construction. Algorithms for digital object generation of each component of the cable-stayed bridge were developed. Using these algorithms, Level-3 BIM practices can be realized from design stages. Based on previous practices, digital object library can be accumulated. Basic digital models are modified according to given design conditions by a designer. Once design models are planned, various applications using the models are linked the models such as estimation, drawings and mechanical properties. Federated bridge models are delivered to construction stages. In construction stage, the models can be efficiently revised according to the changed situations during construction phases. In this paper, measured coordinates are imported to the model generation algorithms and revised models are obtained. Augmented reality devices and their applications are proposed. AR simulations in construction site and in office condition are tested. From this pilot test of digital models, it can be said that Level-3 BIM practices can be realized by using in-house modeling algorithms according to different purposes.

A Study on the Expression of Authenticity in the Digital Content of Built Heritage with HBIM (건축유산정보모델(HBIM)을 활용한 건축문화유산 디지털 콘텐츠의 진정성 표현 연구)

  • Kim, Bo-Ram;Lee, Jong-Wook
    • The Journal of the Korea Contents Association
    • /
    • v.22 no.5
    • /
    • pp.276-287
    • /
    • 2022
  • Since the 1990s, digital technology has been actively applied in the field of heritage, and this presents a new possibility of using cultural heritage as a way to utilize the original cultural data that was previously recorded and stored. Methods of interpreting cultural heritage have been particularly diversified due to various external circumstances such as COVID-19 and time constraints, and the use of contactless digital content has played a significant role in built heritage that cannot be moved. Building Information Modeling (BIM) technology is considered as a way to properly express the authenticity of built heritage, but simply creating built heritage content with BIM cannot express the authenticity of cultural heritage. Therefore, it is necessary to show the reliability of the process of content production through an authorized institution and to provide the information of members on the content. This study intends to contribute to the field of digital heritage by suggesting ways to improve reliability and express authenticity in the production of built heritage content.

Pedagogical Issues of Performance Oriented Digital Design - Focused on Kinetic Facade Design - (성능지향적 디지털 설계의 교육방법론 연구 - 키네틱 파사드 설계과정을 중심으로 -)

  • Jang, Do-Jin;Kim, Sung-Ah
    • Journal of KIBIM
    • /
    • v.5 no.1
    • /
    • pp.35-43
    • /
    • 2015
  • Existing pedagogical issues of digital design including BIM have been focused not on potential of Digital Design but on skills of BIM or digital modeling tool. Kinetic facade can move or change material state to react surrounding environment conditions. It is a suitable design object for teaching principle of Performance Oriented Digital Design. Variables of movements affect multi-criteria of performances of kinetic facade, so different design approach from fixed facade design should be explored. Kinetic facade design process is proposed to study pedagogical issues of Performance Oriented Digital Design in this paper. Through Kinetic facade design process, students can understand conditions, variables, and performances of digital design.

A Method for Information Management of Defects in Bridge Superstructure Using BIM-COBie (BIM-COBie를 활용한 교량 상부구조의 손상정보 관리 방법)

  • Lee, Sangho;Lee, Jung-Bin;Tak, Ho-Kyun;Lee, Sang-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.165-173
    • /
    • 2023
  • The data management and the evaluation of defects in the bridge are generally conducted based on inspection and diagnosis data, including the exterior damage map and defect quantity table prepared by periodic inspection. Since most of these data are written in 2D-based documents and are difficult to digitize in a standardized manner, it is challenging to utilize them beyond the defined functionality. This study proposed methods to efficiently build a BIM (Building Information Modeling)-based bridge damage model from raw data of inspection report and to manage and utilize the damage information linking to bridge model through the spread sheet data generated by COBie (Construction Operations Building Information Exchange). In addition, a method to conduct the condition assessment of defects in bridge was proposed based on an automatic evaluation process using digitized bridge member and damage information. The proposed methods were tested using superstructure of PSC-I girder concrete bridge, and the efficiency and effectiveness of the methods were verified.

Building Information Modeling of Caves (CaveBIM) in Jeju Island at a Specific Site below a Road at Jaeamcheon Lava Tube and at a Broader Scale for Hallim Town (제주도 한림 재암천굴과 도로 교차구간의 CaveBIM 구축)

  • An, Joon-Sang;Kim, Wooram;Baek, Yong;Kim, Jin-Hwan;Lee, Jong-Hyun
    • The Journal of Engineering Geology
    • /
    • v.32 no.4
    • /
    • pp.449-466
    • /
    • 2022
  • The establishment of a complete geological model that includes information about all the various components at a site (such as underground structures and the compositions of rock and soil underground space) is difficult, and geological modeling is a developing field. This study uses commercial software for the relatively easy composition of geological models. Our digital modeling process integrates a model of Jeju Island's 3D geological information, models of cave shapes, and information on the state of a road at the site's upper surface. Among the numerous natural caves that exist in Jeju Island, we studied the Jaeamcheon lava tube near Hallim town, and the selected site lies below a road. We developed a digital model by applying the principles of building information modeling (BIM) to the cave (CaveBIM). The digital model was compiled through gathering and integrating specific data: relevant processes include modeling the cave's shape using a laser scanner, 3D geological modeling using geological information and geophysical exploration data, and modeling the surrounding area using drones. This study developed a global-scale model of the Hallim region and a local-scale model of the Jaeamcheon cave. Cross-validation was performed when constructing the LSM, and the results were compared and analyzed.

Automated Digital Engineering Modeling of Prefabricated Bridges with Parameterized Straight Alignments (직선교량에 대한 디지털엔지니어링 모델의 선형연동 프로그램 개발)

  • Choi, Jae-Woong;Kang, Jeon-Yong;Kim, Hyun-Min
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.40-49
    • /
    • 2020
  • This report describes the development of a program that can be linked to an alignment and extracts related information using a prefab structured digital engineering model. The subject bridge was set as a straight alignment, the Superstructure type as Precast girder and the Substructure type as Precast pier and Cast-in-situ Abutment. We identified the variables required to create a digital engineering model and reviewed them to create the digital engineering model by entering them as numerical values in the program. In addition, it is configured so that the variables linked to the alignment can be entered numerically. The quantity takeoff can be calculated when the design is complete. The purpose of the program development presented in this report is to enable the designers to select the optimal alternative by designing a bridge that best fits their current situation, extracting the relevant information and then by providing it to the manufacturer and construction company.

A Study on the development of Construction Field Management Model based on BIM (BIM기반 건설현장 관리모델 개발에 관한 연구)

  • Jun, Young-Woong;Lee, Myoung-Sik
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.9 no.3
    • /
    • pp.69-76
    • /
    • 2009
  • The importance of efficient construction site management has been growing as the amount of construction information increases which is used in the growing construction site. Accordingly in this study, we are trying to find out the application situation and possibility of BIM through theoretical examination and domestic & overseas case study of BIM and we are trying to suggest the way of efficient construction site management formulation through implementation phase-oriented and cooperation entity-oriented analysis in the construction site. We found out that it was possible to minimize time loss and financial loss by visualizing 2D drawings through 3D modeling of target building by applying BIM and that it was possible to improve accuracy of budget planning with quantitative information of 3D model, to plan construction process with more confidence due to accurate architectural information of drawings and quantitative information, and to manage cost and quality through process management based on construction information acquired by BIM including object information by part. It is concluded that we can improve efficiency of construction management between field and each cooperating entity by integrating and linking BIM information through this process.

  • PDF

A Case Study on Construction Management Based on BIM Data (BIM 데이터 기반 현장 시공관리 사례 분석 연구)

  • Lee, Dong-Jun;Hyun, Jin-Oh;Min, Sung Gyu;Lim, Ji-Yong;Shin, Min Cheol;Kwon, Suk Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.2
    • /
    • pp.223-229
    • /
    • 2024
  • The Ministry of Land, Infrastructure and Transport presented the "Construction Industry BIM Enforcement Guidelines Constructors Edition" to reflect the design BIM data in the construction stage. The enforcement guidelines were prepared with the aim of providing guidelines for detailed common implementation plans such as minimum BIM business methods and procedures necessary for ordering, designing, and construction stages for the full-scale BIM application in all fields of the construction industry. In this study, interference and design errors were examined based on the enforcement guidelines, and the application effects were grasped for various sites where equipment placement and operation plans were established. As a result, intuitive examination was possible by comparing the digital field 3D model and the planned model in one space, and the optimum equipment arrangement and operation plan were derived through simulation examination according to the execution stage.

A Study on the configuration and utilization of the schematic design BIM Template (계획설계 BIM 템플릿의 구성 및 활용에 관한 연구)

  • Kim, Myoung-Keun;Koh, In-Lyong;Min, Young-Gi;Chung, Tae-Seung
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.13 no.3
    • /
    • pp.51-58
    • /
    • 2013
  • The projects are becoming more complicated and amplified as the design and development technology is advancing. Thus, existing architectural processes and methods are revealing limitations. The technology of BIM is an IT applied to construction, that provides the state-of-the-art tools to overcome these limitations to improve on architectural designing, technology, cost, etc. Therefore, it it necessary to converge the advises and collaboration from the various experts at the initial step in a common processing platform. In this research project with Korean Education Development Institute, configuration and utilization of EDU BIM template is studied because setting an anchor point from the initial phase is necessary for such processes at the perspective of the operator. The purpose of this study is to prevent time consumptions at the initial phase of BIM foundation, to ensure accurate information inputs within the repetitive tasks, and for effective information management that will produce consistent results through utilization of BIM technology.