Necessity Review of IPD(Integrated Project Delivery) for Free-Form Building in Domestic (비정형건축물의 IPD(Integrated Project Delivery) 도입 필요성 검토)

  • Kim, Sung-Jin;Park, Sung-Jin;Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.308-309
    • /
    • 2014
  • A lot of very complex free-form buildings such as Seoul City Office and DDP(Dongdaemun Design Plaza) have been recently built nowadays in domestic. However, as construction methods and cost data are decided without enough discussion and collaboration with specialized subcontractors during design stage, construction quality problems and cost overrun of the free-form buildings are thus occurred during construction stage. Therefore design system and process or contract and ordering system should be developed participating the specialized subcontractors during design stage in order to perfect the free-form design and construction. Especially US has thus an effort to apply IPD(Integrated Project Delivery) system which can solve the problems of construction quality, productivity decrease and cost overrun by constructing the buildings based on exact drawings and collaboration as well as activating BIM(Building Information Modeling). Therefore this study reviews cases of the free-form buildings in domestic and then presents necessity review of IPD in domestic.

  • PDF

A Study on the Productivity Analysis of 3D BIM-based Fabrication Documents Extraction (3D BIM 기반 철골 제작도면 산출 생산성 분석)

  • Ham, Nam-Hyuk;Yang, Jung-Hye;Yuh, Ok Kyung
    • Journal of KIBIM
    • /
    • v.9 no.3
    • /
    • pp.30-40
    • /
    • 2019
  • Extraction of fabrication documents is very important because it provides information related to tasks of fabrication and construction. Therefore, in the case of a prefabricated member such as a steel structure, it is necessary to improve the productivity of fabrication documents through 3D BIM. However, research and evidence data on direct comparison analysis of 3D BIM-based documents extraction versus 2D CAD-based documents extraction are hard to find. Thus, this study focuses on productivity analysis of 3D BIM based fabrication documents extraction. In this study, the productivity data of fabrication documents extraction for module construction of EPC project was analyzed. For the productivity analysis, a case study on the fabrication documents of Module A (1,965 sheets) and Module B (1,216 sheets) was conducted. Fabrication documents for each module include general arrangement drawing, assembly drawing, single part drawing and single plate drawing. Comparison of 2D CAD based fabrication documents extraction and 3D BIM based fabrication documents extraction, the productivity for the entire work was improved from 17 hours to 16 hours for Module A and 12 hours to 7 hours for Module B. Especially, the productivity of the assembly drawings, which occupies a large part of the fabrication documents, was improved by about 48.75% from the total time required from 281 hours to 144 hours.

A Study on the Development of Architectural Design Tool supporting Realtime Evacuation Simulation (실시간 탈출 시뮬레이션을 지원하는 건축 디자인도구 개발에 관한 연구)

  • Lee, Yun Gil
    • Journal of Korea Multimedia Society
    • /
    • v.18 no.5
    • /
    • pp.641-651
    • /
    • 2015
  • This study intends to develop an evacuation simulation system based on BIM in a real-time manner. The proposed system, an add-on module for Revit Architecture and one of the most popular BIM authoring tools, supports the architectural design as well as real-time evacuation simulation of the design alternatives. This paper introduces the developed system, named SafeBIM, and the design process on which it is based. To evaluate the possibilities of the proposed system in the educational field of architectural design, this study included a feasibility test with college students in an architectural design studio.

A Building Information Modeling based Collaboration Supporting System for Construction Project (BIM 기반 건설 프로젝트의 협업 지원 시스템)

  • Yoon, Su-Won;Chin, Sang-Yoon;Choi, Cheol-Ho;Lee, Ghang;Shin, Tae-Hong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.476-481
    • /
    • 2008
  • The objective of this paper is to propose a conceptual framework of a BIM based collaboration supporting System, called Construction Project Life Cycle Management (CPLM). The framework of CPLM is proposed by reflecting the characteristics of the AEC industry such as deliverly methods, process, fragmentation, etc.. And it is a system intended to help project participants make better decisions and to facilitate coordination between various stakeholders in a project by providing virtual collaboration environment.

  • PDF

Identifying the Effects of Repeated Tasks in an Apartment Construction Project Using Machine Learning Algorithm (기계적 학습의 알고리즘을 이용하여 아파트 공사에서 반복 공정의 효과 비교에 관한 연구)

  • Kim, Hyunjoo
    • Journal of KIBIM
    • /
    • v.6 no.4
    • /
    • pp.35-41
    • /
    • 2016
  • Learning effect is an observation that the more times a task is performed, the less time is required to produce the same amount of outcomes. The construction industry heavily relies on repeated tasks where the learning effect is an important measure to be used. However, most construction durations are calculated and applied in real projects without considering the learning effects in each of the repeated activities. This paper applied the learning effect to the repeated activities in a small sized apartment construction project. The result showed that there was about 10 percent of difference in duration (one approach of the total duration with learning effects in 41 days while the other without learning effect in 36.5 days). To make the comparison between the two approaches, a large number of BIM based computer simulations were generated and useful patterns were recognized using machine learning algorithm named Decision Tree (See5). Machine learning is a data-driven approach for pattern recognition based on observational evidence.

Artificial Intelligence Image Segmentation for Extracting Construction Formwork Elements (거푸집 부재 인식을 위한 인공지능 이미지 분할)

  • Ayesha Munira, Chowdhury;Moon, Sung-Woo
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.1-9
    • /
    • 2022
  • Concrete formwork is a crucial component for any construction project. Artificial intelligence offers great potential to automate formwork design by offering various design options and under different criteria depending on the requirements. This study applied image segmentation in 2D formwork drawings to extract sheathing, strut and pipe support formwork elements. The proposed artificial intelligence model can recognize, classify, and extract formwork elements from 2D CAD drawing image and training and test results confirmed the model performed very well at formwork element recognition with average precision and recall better than 80%. Recognition systems for each formwork element can be implemented later to generate 3D BIM models.

Evaluating Effectiveness of BIM-based Idea Bank during VE Workshop

  • Kim, Hojun;Park, Heetaek;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.650-651
    • /
    • 2015
  • Value Engineering has been recognized as one of the construction management techniques for improving the value and benefits of whole project. However, due to the lack of the past data and inefficient free-thinking techniques, the idea generation during VE workshop is still inefficient and ineffective. Even though various studies related to theoretical methodology and technical systems relevant to database were conducted, VE team still mainly rely on their experience for idea generation. With this regard, this study suggests an approach of BIM-based idea bank and assesses its effectiveness by interviewing 20 VE experts in the industry. This approach covers the three steps of idea generation, consisting of 1) Developing BIM based VE database, 2) Generating VE ideas, 3) Updating VE ideas. The result showed that the proposed approach has great potentials to support VE team and improve the quality of VE ideas during creativity phase.

  • PDF

Development of an Application to Generate 2D Drawings in Automation using Open BIM Technologies (개방형BIM기반 2D도면 자동 생성 프로그램 개발에 관한 연구)

  • Kim, Inhan;Lee, Minjae;Choi, Jungsik;Kim, Gutaek
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.4
    • /
    • pp.417-425
    • /
    • 2016
  • Especially for resolving BIM data compatibility issue, as one of recently raised BIM technology issues, has also been improved by using open BIM, representatively using IFC (Industry Foundation Classes) format. As shown in many case studies, usefulness of BIM technology is increasing day by day, and the IFC-based open BIM technology is essential in recent AEC projects where the productive collaboration is of importance. One of current problems in actual projects is that there is a conflict between conventional ways and newly developed BIM ways. Using both conventional and new technologies leads construction workers to having more work loads, consequently the efficiency and productivity of on-site workers have been decreased. Thus, it is strongly necessary to facilitate 3D BIM models to extract and generate 2D precision drawings in automation, especially using open BIM technologies. Some native BIM authoring tools have limitations in there automatic generation of 2D drawings, and there is no standardized mechanism to generate 2D drawings from heterogeneous applications. For this reason, this paper aims to develop an automated stand-alone program to generate 2D drawings in automation using IFC file, totally independent from various BIM authoring tools. By using the application described in this paper, any type of general drawings such as plan, section and elevation can be extracted without additional efforts. The development approach described in this paper, based on the open BIM technologies, has a strong impact to the current process especially in the perspective of enhancing productivity when we need to find out a trade-off in-between conventional and new approaches.

DEVELOPMENT OF BUILDING INFORMATION MODEL FOR RESOURCES OPTIMIZATION IN CONSTRUCTION PROJECT

  • Gopal M. Naik;Rokhsareh Badamahgan
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.634-639
    • /
    • 2013
  • The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.

  • PDF

Analysis of Substitutability of 2D Electronic Drawing Using the BIM Model -Focusing on the Electronic Delivery System in Road Field- (BIM 모델을 활용한 2D 전자도면 대체 가능성 분석 -도로분야 전자납품체계를 대상으로-)

  • Seo, Myoung-Bae;Ju, Ki-Beom;Kim, Nam-Gon
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.11
    • /
    • pp.441-450
    • /
    • 2013
  • With the recent increase in BIM orders in civil engineering, project owners are supplied with BIM-based products. Due to the lack of related guidelines, however, and the vague regulations on the creation and level of drawings as well as on the products list, many owners receive BIM-based products along with the existing 2D products. This can lead to task overlapping by designers or contractors and can cause the owners to have more data to maintain. If the existing 2D-based electronic supply system is changed to a BIM ordering system to reduce such a burden, it is necessary to examine the 2D products that can be extracted from or substituted for the BIM model so as to minimize the overlapping products. Therefore, in this study, BIM modeling of road construction projects whose enforcement plan by the Ministry of Land and Transportation has been completed was conducted, and based on the study results, the possibility of extracting 2D drawings from a total of 3,767 drawing items was determined. The results showed that 2,549 drawing items (67%) could be extracted as 2D drawings from the BIM model, and in particular, drawing items related to general connection work, earthwork, and amenities work could be most effectively substituted. The results of this study can be used as the base data for reducing the number of 2D drawings or substituting them in developing a BIM-based product supply system in the future.