1 |
Ryu, H. G., Kim, S. J. (2016). Implications Deduction through Analysis of Reverse Engineering Process and Case Study for Prefabrication and Construction of Freeform Envelop Panels, Journal of The Korean Institute of Building Construction, 16(6), pp. 579-585.
DOI
|
2 |
Shin, T. S., Yang, J. M. (2009). A Proposal for the Automation Process of Creating Shop Drawings in Steel Constructions, Journal of the regional association of architectural institute of korea, 11(4), pp. 267-274.
|
3 |
Wang, H. K., Choi, J. H. (2019). Data-driven Interactive Planning Methodology for EPC Plant Projects, Korean Journal of Construction Engineering and Management, 20(2), pp. 95-104.
DOI
|
4 |
Chin, S. Y. (2016). The Truth of 2D Drawing Extraction from BIM, Magazine of KIBIM, Winter 2016. pp. 27-30.
|
5 |
Ministry of Land, Infrastructure and Transport. (2018). Department of Technology Policy, Smart construction technology roadmap for construction productivity innovation and safety enhancement, pp. 1-26.
|
6 |
EOM, J. U., Shin, T. S. (2010). A Study on the Automation of the Connection modeling for Steel Structures based on BIM, Journal of Korean Society of Steel Construction, 22(1), pp. 99-108.
|
7 |
EOM, J. U., Shin, T. S. (2011). A Development of Interface Module between Structural Design and Detail Design based on BIM, Journal of Korean Society of Steel Construction, 23(1), pp. 113-124.
|
8 |
Jang, S., Lee, G. (2018). Process, productivity, and economic analyses of BIM-based multi-trade prefabrication-a case study, Automation in Construction, vol. 89, pp. 86-98.
DOI
|
9 |
Ham, N. H., Moon, S., Kim, J. H., Kim, J. J. (2018). Downloaded 565 times Case Studies Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project, Journal of Construction Engineering and Management Vol. 144, Issue 6 (June 2018), https://doi.org/10.1061/(ASCE)CO.1943-7862.0001498
DOI
|
10 |
Isolda, A. J., Florian, M., Norman, H., Timothy, W., Guillaume, H. (2017). Potential benefits of digital fabrication for complex structures: Environmental assessment of a robotically fabricated concrete wall, Journal of Cleaner Production. 154, 2017, pp.330-340.
DOI
|
11 |
Kaner, I., Sacks, R., Kassian, W., Quitt, T. (2008). Case Studies of BIM Adoption for Precast Concrete Design by Mid-sized Structural Engineering Firms, ITcon Vol. 13, pp. 303-323.
|
12 |
Kim, B. J., Kim, Y. J., Chin, S. Y. (2018). A development of a checklist to check the consistency of BIM and drawings at the construction documentation phase, Journal of KIBIM, 8(1), pp. 33-42.
DOI
|
13 |
Kim, B. J., Ju, H. W., Jang, M. S., Kim, B. J., Chin, S. Y. (2016). An Analysis on Design Error Issues of BIM Conversion Design Projects through Case Studies, Journal of KIBIM, 6(2), pp. 47-57.
DOI
|
14 |
Kim, H. J. (2017). Analysis of BIM utilization in construction site, Construction Technology, Ssangyong Construction, pp. 68-73.
|
15 |
Kim, J. K., Yoo, M. Y., Ham, N. H., Kim, J J., Choi, C. S. (2018). Process of Using BIM for Small-Scale Construction Projects - Focusing on the Steel-frame Work -, Journal of KIBIM, 8(2), pp. 41-50.
DOI
|
16 |
Nahangi, M., Haas, C. T. (2014). Automated 3D compliance checking in pipe spool fabrication, Advanced Engineering Informatics, vol. 28, no. 4, pp. 360-369.
DOI
|
17 |
Kim, S. J., Park, Y. M., Park, J. J. (2017). Review of Freeform Buildings using CNC T-BAR System, Journal of Academic and Technical Papers, Journal of The Korean Institute of Building Construction, 17(1), pp. 60-61.
|
18 |
Lee, J. S., Kwon, N. H., Ham, N. H., Kim, J. J., Ahn, Y. H. (2019). BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea, https://doi.org/10.1155/2019/4163625 (Jul. 03. 2019).
DOI
|
19 |
Lim, C. H. (2017). Application of 3D Information to Reduce Rework, Thesis (Master) - Hanyang University Graduate School of Engineering: Plant Engineering Major 2017. 2
|
20 |
Neelamkavil, J., Ahamed, S. S. (2012). The Return on Investment from BIM-driven Projects in Construction. IRC-RR-324, National Research Council, Canada, 2012.
|
21 |
Oh, H. O., Jung, J. H., Lee, J. C. (2013). A Guideline for Structural Drawings Based on BIM, Journal of the Architectural Institute of Korea Structure & Construction, 29(3), pp. 39-46.
DOI
|
22 |
Park, S. M., Ryu, J. R., Woo, S. H., Choo, S. Y. (2016). A Proposal for Required Drawing Information Standard and Its Effectiveness for Writing BIM-Based Construction Consent Documents, Journal of the regional association of architectural institute of korea, 18(2), pp. 19-26.
|
23 |
Public Procurement Service (2017). Facility Project Basic Guide for Applying BIM, v1.32, https://www.pps.go.kr/mobile/item/domesticView.dom?boardSeqNo=3127&pageIndex=1&boardId=PPS089 (Jul. 15. 2019).
|