• 제목/요약/키워드: BIM(building information modeling)

검색결과 812건 처리시간 0.045초

UAV와 BIM 정보를 활용한 시설물 외관 손상의 위치 측정 방법 (Structural Damage Localization for Visual Inspection Using Unmanned Aerial Vehicle with Building Information Modeling Information)

  • 이용주;박만우
    • 한국BIM학회 논문집
    • /
    • 제13권4호
    • /
    • pp.64-73
    • /
    • 2023
  • This study introduces a method of estimating the 3D coordinates of structural damage from the detection results of visual inspection provided in 2D image coordinates using sensing data of UAV and 3D shape information of BIM. This estimation process takes place in a virtual space and utilizes the BIM model, so it is possible to immediately identify which member of the structure the estimated location corresponds to. Difference from conventional structural damage localization methods that require 3D scanning or additional sensor attachment, it is a method that can be applied locally and rapidly. Measurement accuracy was calculated through the distance difference between the measured position measured by TLS (Terrestrial Laser Scanner) and the estimated position calculated by the method proposed in this study, which can determine the applicability of this study and the direction of future research.

Building Integrated Vegetation Systems into the New Sainsbury's Building Based on BIM

  • Lee, Dong-Kyu
    • 한국BIM학회 논문집
    • /
    • 제4권2호
    • /
    • pp.25-32
    • /
    • 2014
  • Today, there is a growing need of environment-friendly buildings, so-called 'green', facilities, and energy saving buildings to decrease environmental pollutants released into cities by construction activities. Green-Building Information Modeling (Green-BIM) is a purpose-built solution which supports to forecast energy consumption of 3-D model of a building by augmenting its primary 3-D measurements (width, height and depth) with many more dimensions (e.g. time, costs, social impacts and environmental consequences) throughout a series of sequential phases in the lifecycle of a building. The current study was carried out in order to integrate vegetation systems (particularly green roof and green wall systems) and investigate thermal performance of the new Sainsbury's building which will be built on Melton road, Leicester, United Kingdom. Within this scope, a 3-D building model of the news Sainsbury's building was first developed in $Autodesk^{(R)}$ $Revit^{(R)}$ and this model was then simulated in $Autodesk^{(R)}$ $Ecotect^{(R)}$once weather data of the construction site was obtained from $Autodesk^{(R)}$ Green Building $Studio^{(R)}$. This study primarily analyzed data from (1) solar radiation, (2) heat gains and losses, and (3) heating and cooling loads simulation to evaluate thermal performance of the building integrated with vegetation system or conventionally available envelops. The results showed that building integrated vegetation system can potentially reduce internal solar gains on the building rooftops by creating a 'bioshade'. Heat gains and losses through roofs and walls were markedly diminished by offering greater insulation on the building. Annual energy loads for heating and cooling were significantly reduced by vegetation more significantly through the green roof system in comparison to green wall system.

BIM 기반 물량산출 자동화를 위한 모델링의 기준제시 (Propose to Modeling standard for automation quantity take-off of BIM-based)

  • 전기현;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.143-144
    • /
    • 2011
  • Recently the construction project is intricately linked to the between participants. it is because construction informations are not integrate. This study suggests 3D modeling standard for integrated construction information. These suggestions can be useful to automation quantity take-off.

  • PDF

SUSTAINABLE AND ENVIRONMENTALLY RESPONSIBLE DESIGN USING BIM: A CASE STUDY OF A RESIDENTIAL PROJECT

  • Hyunjoo Kim;Kwok K. Tam
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.84-87
    • /
    • 2011
  • This paper describes the application of the three sustainable design elements for a residential project in the county of Los Angeles, USA. The first design element is the green building design in which a base model will be created using the Autodesk REVIT MEP program for the analysis by Building Information Modeling (BIM) for the energy analysis modeling process to determine the energy savings for each of the recommended design features. The second element is the Low Impact Development design for the site design using specialty material and structural devices for infiltration and recycling of storm water for reuse. The third element is the application of drought tolerant plant species in the site's landscaping design as a means to conserve water. The construction cost associated with the application of these three elements will be reviewed to determine the practicality and effectiveness of this sustainable design approach.

  • PDF

토목분야 BIM 적용 사례 분석을 통한 발주자 관점에서의 BIM 발전 전략 (Case study of Civil Engineering BIM Projects: Perspective of Korean Public Owners)

  • 김창윤;문현석;나혜숙;김진욱
    • 한국산학기술학회논문지
    • /
    • 제15권12호
    • /
    • pp.7430-7437
    • /
    • 2014
  • 복잡해지고 대형화되고 있는 국내 외 건설 프로젝트의 변화에 따라 건축 토목 분야 설계 패러다임이 점차 2차원 설계에서 3차원 설계로 이동하고 있다. 건축 분야에서는 발주자의 적극적인 요구에 따라 건설 정보의 효율적 관리를 위하여 Building Information Modeling(BIM) 기술을 활용하고자 많은 연구와 노력이 이루어지고 있다. 그러나 토목 분야에서는 발주자 관점에서의 BIM 기술 적용 사례가 건축 분야에 비해 상대적으로 부족한 실정이며, 대부분의 프로젝트의 발주자가 국가나 공공기관인 토목 분야의 특성상 BIM과 관련된 제도나 기술에 대한 인식 미비로 기술 도입에 소극적인 것이 현실이다. 하지만 최근 토목 분야에서도 BIM 기술의 활용가능성에 주목하여 조달청 및 국토교통부와 같은 정부기관과 공사 공단과 같은 기관에서 관련 제도 정비 및 기술 도입에 적극적으로 노력하고 있다. 이에 본 연구에서는 이러한 정책 및 제도 변화에 발맞추어 나아가기 위하여 대표적인 토목공사 발주 공공기관의 BIM대응 전략에 대하여 살펴보고, 각 기관별로 실제 BIM 적용 사례 분석을 통해 토목분야에서의 BIM 기술에 대한 대응 및 발전 전략에 대하여 도출하였다.

Surface 및 Solid 방식의 비교를 통한 Parametric 기법의 토공물량산출 방법 (Parametric Quantity Take-Off of Earthwork by Comparing the Use of Surface and Solid Models)

  • 황희석;이재홍;김태영
    • 한국BIM학회 논문집
    • /
    • 제8권1호
    • /
    • pp.56-62
    • /
    • 2018
  • There exists no precedented case of quantity take-off, using parametric modeling, from BIM-based irregular structures. Civil 3D provides earthwork quantity take-off based on surface modeling. Generally, designers should enter data into the specification additionally after extracting quantity estimation from earthwork modeling design. The objective of this report is to suggest the method from quantity take-off to specification of BIM-based earthwork quantities. We intend to investigate earthwork take-off method by Civil3D and explain why parametric information extraction is required for quantity estimation and specification and how information of earthwork quantity based on solid and surface modeling is connected to open quantity take-off module. It is highly expected that this suggestion would be the practical methodology of earthwork quantity take-off and specification in the field of civil engineering.

시설물 유지관리를 위한 BIM 데이터 입력기준 개발방안 : 건축 기계설비를 중심으로 (Development Method of BIM Data Modeling Guide for Facility Management : Focusing on Building Mechanical System)

  • 원지선;조근하;주기범
    • 설비공학논문집
    • /
    • 제25권4호
    • /
    • pp.216-224
    • /
    • 2013
  • Facility data is created throughout the design and construction phase. But the most facility managers bear significant costs that arise from the lack of interoperability with facility lifecycle. This paper is concerned with the way to collect facility data using BIM technology. The aim of this paper is to suggest BIM data modeling guide for the facility management using the information that need to be delivered from design and construction phase to operation and management phase. The BIM data modeling guide focus on the properties of mechanical equipment. It is to be hoped that this study will contribute to collect facility data from as-built BIM data and to build facility management system database without difficulty.

BIM기반 건축물 설계 과정에서 실시간 에너지 성능 분석을 위한 기술 개발에 관한 연구 - 열관류율 분석을 중심으로 (A Study on the Development of the Technology of Evaluating the Performance of Energy - saving in the BIM-based Design Process in the Real Time Manner Focused on the Analysis of Coefficient of Overall Heat Transmission)

  • 이윤길;조원준
    • KIEAE Journal
    • /
    • 제13권1호
    • /
    • pp.29-37
    • /
    • 2013
  • This study intended to introduce the method of designing an eco-friendly building based on BIM(Building Information Modeling) and BIM-based application. The proposed application aimed to generate the environmental performance of the designed alternative automatically in real-time manner in the process of architectural design. We focused on the feasibility of BIM-based eco-friendly design process and the applicability of the developed application for the architectural design practice. In this manner, in the end of paper, we proposed the so-call EcoBIM which is the performance evaluation module for the designed alternative using BIM in the real-time manner and the new design process with it. EcoBIM generate the coefficient of overall heat transmission of wall, roof and slab of the designed alternative with their physical characteristics such as thickness, thermal resistance and so on.

BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구 (A Study on the Automated Estimating System using BIM based Library)

  • 한정훈;남상혁
    • 한국BIM학회 논문집
    • /
    • 제1권2호
    • /
    • pp.12-18
    • /
    • 2011
  • 건설 프로젝트 생애주기 전반에 걸쳐 생성되는 정보를 3차원 모델을 기반으로 관리하는 BIM (Building Information Modeling) 기술은 계획, 설계, 구조해석은 물론 견적 및 3차원 시뮬레이션을 통한 시공계획 등 공사관리 업무를 통합하는 방향으로 발전하고 있다. BIM 기반 견적모델은 3차원 모델의 사용 용도에 따라 상세수준의 차이와 모델정보의 차이를 보이는데, 본 연구에서는 교량 구조물을 대상으로 하여 견적을 위한 모델의 LOD 수준을 파악하였다. 또한 건설정보 분류체계에 적용되는 라이브러리의 클래스를 정의하고 Microstation의 API를 이용하여 클래스의 파라메터를 추출하여 파라메터와 연동되는 Resource의 물량정보를 산출한다. 견적 모델과 상이하게 모델링된 모델에서 하위 모델을 계층화 하고 견적수준으로 병합함으로써 BIM 기반 토목 라이브러리를 통한 견적자동화시스템을 검증하였다.

BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안 (Improvement of BoQ Documents for the BIM based Quantity Takeoff)

  • 안지원;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제7권2호
    • /
    • pp.16-24
    • /
    • 2017
  • It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.