• Title/Summary/Keyword: BIM(Building information Modeling)

Search Result 800, Processing Time 0.032 seconds

Key Indicators for Evaluating BIM Collaboration Performances.

  • Sacchettini, Lou;Park, Moonseo;Lee, Hyun-Soo;Lee, Jin Gang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.236-240
    • /
    • 2015
  • The accelerating adoption of BIM (Building Information Modeling) is challenging collaboration practices established in the construction industry. The implementation of BIM involves changes in participants work, organization, processes and collaboration methods. Therefore there is a need to be able to measure effectively and accurately collaboration, in order to analyze and determine current practices and their performances in organizations (company, team project) as well as changes required. Previous researches scope from evaluating BIM maturity of an organization to BIM collaboration requirements but lack of proper tools and methods to analyze collaboration performances. This is especially true when it comes to evaluate the efficiency and collaboration performances of processes rather than systems or organizations. Thus this research aims to analyze systematically and comprehensively previous researches proposing diversified methods to evaluate BIM performances and collaboration. Furthermore it aims to suggest key indicators to evaluate collaboration performances of processes and project organizations. This research may contribute to better understanding of collaboration performances within organizations using BIM and further development of evaluation method for analyzing BIM design project.

  • PDF

A Construction safety management system based on Building Information Modeling and Real-time Locating System (위치추적기술을 이용한 BIM기반 건설현장 안전관리 시스템)

  • Lee, Hyun-Soo;Lee, Kwang-Pyo;Park, Moon-Seo;Kim, Hyun-Soo;Lee, Sa-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.135-145
    • /
    • 2009
  • The main goal of construction projects from the past has been enhancing efficiency by reducing cost and time. but, seeing the current condition of safety management of many construction companies nowadays, it is true that not much attention has been paid to safety management for a long time. However, there are paradigm shift from the cost and term of works to safety management in the construction industry, from this circumstance the safety management is evaluated more importantly. Though less accident happens compared to past, the accidents are getting greater because construction projects nowadays are bigger and more complex and monetary loss from the accidents are increasing. Also, the severity is getting greater and even fatal. For this reason, more improved safety management is very necessary. Therefore, we are to propose more efficient system for safety management in this thesis. Technical parts for developing system include many technique such as Real Time Locating system, and other techniques like Monitoring module based on BIM, Data Mart, Alarm are also applied together. Through this system, in the construction site, safety management is performed more effectively and widely because the system can manage the human resource and fluid situation. Also, safety manager can conduct more systematically and advanced safety management through human resource dominated safety management.

Analitic study of the PSC box structure based on BIM (BIM기반의 PSC 박스 구조물의 해석기법)

  • Lee, Heon-Min;Park, Jae-Geun;Jo, Sung-Hoon;Choi, Jung-Ho;Shin, Hyun-Mock
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.179-180
    • /
    • 2009
  • Recently Development of construction system that subjective operators share and control information efficiently based on the three-dimensional space and design information throughout life cycle of construction project is progressing dynamically. In this study, therefore, we research about interface method between 3-D modeling data for civil-structure-design, especially psc-box-girder design and analysis program, and analysis method of the psc box structure based on BIM(Building Information Management)

  • PDF

A Study on the Development of a Construction Field Management Model based on BIM (BIM기반 건설현장 관리모델 개발에 관한 연구)

  • Jun, Young-Woong;Lee, Myoung-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.127-135
    • /
    • 2010
  • As the amount of construction information used in the growing construction field increases, the importance of efficient construction field management has been growing. Accordingly, this study aims to identifythe application situation and possibility of BIM through theoretical examinations and domestic & overseas case studies of BIM, and attempts to suggest an approach to the formulation of an efficient construction field management model through the implementation of phase-oriented and cooperation entity-oriented analysis in the construction field. In the future, the conclusions of this study should be used to formulate an actual construction field management model and apply it in the field.

A Study on Information Visualization using Building Information Modeling (BIM을 이용한 정보 시각화에 관한 연구)

  • Cha, Gi-Chun;Park, Seunghee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.4170-4175
    • /
    • 2015
  • The global warming has been recognized as a serious problem. To solve this problem, the country of all the world have conducted techniques such as energy saving and reduction of greenhouse gas. The 30% of total energy is being consumed by buildings domestically and BAS/BEMS are being operated for the management of building energy. But, BEMS is unsatisfactory condition to manage the energy efficiently. In this study, We investigate real application on Chamsaem elementary school as a target buildings and develop 3D Web Browser platform. The spatial information of target buildings is described with used BIM and the energy information is presented for facilities operation and electricity consumption in floor and facility. We perform the quantitative evaluation based on ISO/IEC 9126 and operate this system for two months. in result, energy decreased by about 16%. We expect that the proposed 3D Web Browser system will bring operating efficiency improvement of the current BEMS.

Interoperability Analysis for BIM software Based on User-defined Properties (BIM 소프트웨어 호환성 분석 : 사용자정의 속성정보인 GBS를 중심으로)

  • Kang, Seunghee;Ha, Jiwon;Ju, Taehwan;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.99-109
    • /
    • 2016
  • The utilization of Building Information Modeling (BIM) has increased in order to enhance the integration of information for management and resources throughout the construction projects. Therefore, various BIM softwares have been used under open BIM environments in the building and plant construction industry. However, it has obstructive factors due to the lack of interoperability. In order to address this problem, this study conducted an interoperability analysis of BIM software focused on user-defined properties for enhanced function and efficiency. Result of the analysis shows that authoring tools have more interoperability problems than viewer tools and simulation tools have. In terms of interoperability, user-defined properties outperforms than those of system basic properties and logic data. Therefore, it was found that functional improvement and workload minimization in BIM can be attained by applying the GBS (an user-defined property for automatic manipulation of BIM proposed by Jung et al. 2013) that enables automatic link between geometric data and non-geometric data. In this respect, this study concludes that the application of user-defined property (e.g. GBS) can be an effective method for information integration throughout construction projects.

A Study of the Establishment of Small and Medium Sized Architectural Design Firm BIM Environment based on Virtual Desktop Infrastructure (가상 데스크톱 인프라(VDI) 기술을 활용한 중소규모 설계사의 BIM 사용자 별 데스크탑 자원 할당 전략에 관한 연구)

  • Lee, Kyuhyup;Shin, Joonghwan;Kwon, Soonwook;Park, Jaewoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.78-88
    • /
    • 2016
  • Recently BIM technology has been expanded for using in construction project. However its spread has been delayed than the initial expectations, due to the high-cost of BIM infrastructure development, the lack of regulations, the lack of process and so forth. In design phase, especially, collaboration based on BIM system has being a key factor for successful next generation building project. Through the analysis of current research trend about IT technologies, virtualization and BIM service, data exchange such as drawing, 3D model, object data, properties using cloud computing and virtual server system is defined as a most successful solution. In various industrial fields, cloud computing technology is utilized as a promising solution which can reduce time and cost of hardware infrastructure. Among the cloud computing technology, VDI is receiving a great deal of attention from it market as an essential part cloud computing. VDI enables to host multiple individual virtual machines by using hypervisor. It has an advantage to easy main device management. Therefore, this study implements a step-by-step user's DaaS by analyzing the desktop resource data of the workers from Pre-design phase to Schematic design, Design develop and Construction design phase. It also develops BIM environment based on test of BIM modeler and designers in architectural design firm. The goal of the study is to enable the cloud computing BIM server. It provides cost saving, high-performance quality of working environment and cooperation's convenience and high security when doing BIM work in small and medium sized architectural design firm.

Proposal of BIM Application Process to Improve BIM Applicability of Basic Design in Heavy Civil Projects (토목 분야 기본설계 단계 BIM 적용성 향상을 위한 BIM 적용 프로세스 제안)

  • Song, EunSol;Moon, SoYeong
    • Land and Housing Review
    • /
    • v.13 no.3
    • /
    • pp.115-123
    • /
    • 2022
  • Recently, the adoption of BIM technology in domestic civil engineering projects has continually increased both in its numbers and scope. However, the BIM model was developed and used after the 2D design was developed instead of creating the BIM model from the conceptual design phase. BIM must be used throughout every phase of design and construction to use BIM for its original purpose. However, if BIM application is applied in heavy civil projects without a step-by-step guideline, it can confuse the market and face industry resistance to using BIM. Therefore, BIM is currently being used step by step in the civil engineering field by using BIM as a conversion design. However, the BIM conversion design method, currently being performed in the Preliminary design stage, has many difficulties due to low work efficiency. This paper analyzes the existing process of converting a 2D design into a 3D BIM model while addressing the issues related to its low work efficiency. To this end, a novel approach to 2D to BIM conversion for the design development stage is proposed.

Design and Constructability Improvement of 3D Concrete Formworks through Analysis of Construction Applications (3차원 콘크리트 거푸집의 설계 및 시공성 개선)

  • Park, Seong-Jun;Dong, Ngoc Son;Kang, Hwirang;Shim, Chang-Su
    • Journal of KIBIM
    • /
    • v.7 no.1
    • /
    • pp.1-8
    • /
    • 2017
  • Aesthetic design guidelines of bridges were developed in many countries. As iconic structures, bridges need to be attractive and durable as they serve many generations. In this paper, a new design process of concrete structures considering 3D shapes and texture was proposed. The 3D design needs to consider function, economy, advanced technology, tradition and local culture. 3D printers enable the combination of artistic design and engineering design for concrete structures. Parametric modeling with iconic design was utilized to produce 3D formworks. As a pilot project, a railway bridge girder was designed and the proposed technologies were applied. Detail requirements to improve constructability and quality of concrete surfaces were derived. From the pilot applications, design guidelines were suggested.

Considerations for Developing a SLAM System for Real-time Remote Scanning of Building Facilities (건축물 실시간 원격 스캔을 위한 SLAM 시스템 개발 시 고려사항)

  • Kang, Tae-Wook
    • Journal of KIBIM
    • /
    • v.10 no.1
    • /
    • pp.1-8
    • /
    • 2020
  • In managing building facilities, spatial information is the basic data for decision making. However, the method of acquiring spatial information is not easy. In many cases, the site and drawings are often different due to changes in facilities and time after construction. In this case, the site data should be scanned to obtain spatial information. The scan data actually contains spatial information, which is a great help in making space related decisions. However, to obtain scan data, an expensive LiDAR (Light Detection and Ranging) device must be purchased, and special software for processing data obtained from the device must be available.Recently, SLAM (Simultaneous localization and mapping), an advanced map generation technology, has been spreading in the field of robotics. Using SLAM, 3D spatial information can be obtained quickly in real time without a separate matching process. This study develops and tests whether SLAM technology can be used to obtain spatial information for facility management. This draws considerations for developing a SLAM device for real-time remote scanning for facility management. However, this study focuses on the system development method that acquires spatial information necessary for facility management through SLAM technology. To this end, we develop a prototype, analyze the pros and cons, and then suggest considerations for developing a SLAM system.