• Title/Summary/Keyword: BDM

Search Result 34, Processing Time 0.027 seconds

BDM Rolling of Middle Sized H-beams from a Bloom (블룸을 이용한 중형 H 형강 BDM 압연 공정 연구)

  • Kim, J.M.;Kim, K.W.;Kim, B.M.
    • Transactions of Materials Processing
    • /
    • v.25 no.1
    • /
    • pp.43-48
    • /
    • 2016
  • H-beams are generally produced by hot rolling composed of a Break Down Mill (BDM) and a Finishing Mill (FM). The goal of the current study was to develop BDM rolling of H300x300 beams from blooms slit from slabs. In order to manufacture H300x300 beams, the caliber design and the pass schedule of BDM rolling were proposed for a bloom instead of a beam blank. The proposed BDM caliber design and pass schedule were tested using FE-simulation and pilot tests. For the major shape dimensions, such as flange width, web height, web thickness, as well as BDM rolling loads, a comparative analysis between the FE-simulation and the pilot rolling tests was conducted. The results of FEM analysis and pilot rolling tests showed good consistency. Moreover, BDM rolling loads were predicted to be in the range of allowable rolling loads. It was concluded that the designed BDM rolling is suitable for implementation within current manufacturing capacity.

AN EFFICIENT IMPLEMENTATION OF BDM MIXED METHODS FOR SECOND ORDER ELLIPTIC PROBLEMS

  • Kim, J.H.
    • Journal of the Korean Society for Industrial and Applied Mathematics
    • /
    • v.7 no.2
    • /
    • pp.95-111
    • /
    • 2003
  • BDM mixed methods are obtained for a good approximation of velocity for flow equations. In this paper, we study an implementation issue of solving the algebraic system arising from the BDM mixed finite elements. First we discuss post-processing based on the use of Lagrange multipliers to enforce interelement continuity. Furthermore, we establish an equivalence between given mixed methods and projection finite element methods developed by Chen. Finally, we present the implementation of the first order BDM on rectangular grids and show it is as simple as solving the pressure equation.

  • PDF

Effects of the Myosin ATPase Inhibitor, 2,3-Butanedione-2-Monoxime, on Growth and Dimorphic Switches of Candida albicans

  • Woo, Mi-Young;Jwa, Mi-Ri;Kim, Jin-Mi;Song, Ki-Won
    • Journal of Microbiology and Biotechnology
    • /
    • v.10 no.5
    • /
    • pp.606-611
    • /
    • 2000
  • Dimorphic yeast Candida albicans reversibly switches between the form of yeast and hyphae depending on external conditions. We investigated possible roles of the myosin family in the growth and dimorphic switches of C. albicans with a general myosin ATPase inhibitor, 2,3-butanedione-2-monoxime (BDM). Transition to hyphae as well as proliferation by budding was completely inhibited by BDM at 16 mM. Presence of 16 mM BDM did not affect hyphae-to-bud transition but it blocked budding. The effects of BDM on yeast growth and dimorphic switches were reversible. More than 70% of the BDM-treated cells demonstrated defects in the amount and the polarized localization of F-actin as well as in the shape and migration of the nucleus, suggesting that myosin activities are needed in these cellular processes of C. albicans.

  • PDF

Method of Transforming PDM Overlapping Relationships to BDM Overlapping Relationships in CPM Schedule (CPM 공정계획의 PDM 중복관계를 BDM 중복관계로 전환시키는 방법)

  • Kim, Seon-Gyoo;Yoo, Jae-Woo;Ko, Dae-Gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.144-152
    • /
    • 2012
  • The reason why most scheduling softwares currently using at construction projects adopt PDM (Precedence Diagramming Method) is that it can express an overlapping relationship between activities. However, the overlapping relationships in PDM are represented only by combinations of four overlapping types that connect the start and finish points of two activities, therefore, PDM cannot express efficiently the relationships between any middle points of two activities if they should be represented. This research proposes the method of transforming the four overlapping types of PDM to the overlapping relationships of BDM(Beeline Diagramming Method), new networking technique, that can connect the inter-relationships at any middle points of two activities as well as express multiple overlapping relationships. The proposed method will help not only to improve an efficiency of scheduling but also to upgrade the scheduling technique because BDM technique has a lot of unique advantages in scheduling.

TACT Scheduling & Monitoring of Apartment Finish Works based on the BDM Technique (BDM기법을 적용한 공동주택 마감공사 TACT공정계획 수립 및 운영)

  • Kim, Seon-Gyoo;Yoo, Jae-Woo;Kim, Dong-Sub;Park, Jong-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.3-11
    • /
    • 2014
  • As the recent construction projects have been carried out as a mixed-use complex project that includes architecture, civil, mechanical, electrical, and landscape, as well as become bigger and high-rise with the increased repetitive works, the TACT technique has received more attention as an effective method for achieving a target completion date by securing the continuous works. Although the TACT technique can maintain a steady flow without the interruption of works in order to utilize the resources of the repetitive works, it can not be considered as the systematic scheduling technique because the schedule computations are not possible as well as a critical path can not be recognized. This paper proposes the applicabilities of scheduling and monitoring the TACT schedule by the BDM technique as comparing and analyzing the methodologies for apartment finish works by the Excel, the Primavera(P6) based on the PDM technique, and the Beeliner based on the BDM technique that is a new networking technique, respectively.

Bandwidth-aware Memory Placement on Hybrid Memories targeting High Performance Computing Systems

  • Lee, Jongmin
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.8
    • /
    • pp.1-8
    • /
    • 2019
  • Modern computers provide tremendous computing capability and a large memory system. Hybrid memories consist of next generation memory devices and are adopted in high performance systems. However, the increased complexity of the microprocessor makes it difficult to operate the system effectively. In this paper, we propose a simple data migration method called Bandwidth-aware Data Migration (BDM) to efficiently use memory systems for high performance processors with hybrid memory. BDM monitors the status of applications running on the system using hardware performance monitoring tools and migrates the appropriate pages of selected applications to High Bandwidth Memory (HBM). BDM selects applications whose bandwidth usages are high and also evenly distributed among the threads. Experimental results show that BDM improves execution time by an average of 20% over baseline execution.

AN EXAMPLE OF REPRESENTING THREE LEVEL'S SCHEDULES WITHIN SCHEDULE HIERARCHY BY BDM TECHNIQUE

  • Seon-Gyoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.445-452
    • /
    • 2011
  • The schedule hierarchy in construction project is generally composed of three levels. The highest level is a milestone schedule and represented by Bar Chart format. The middle level is an integrated project schedule (IPS) and represented by CPM (Critical Path Method) format. The lowest level is a detail working schedule and usually represented by Bar Chart. The traditional scheduling techniques such as ADM (Arrow Diagramming Method) or PDM (Precedence Diagramming Method) cannot represent all kinds of schedule within schedule hierarchy as identical schedule format. However, the BDM (Beeline Diagramming Method) technique can represent all kinds of schedule within schedule hierarchy as identical CPM format. This paper describes the basic concept, principle, interpretation methods, and schedule computation methods of the BDM as a new networking technique that can represent all kinds of overlapping relationships between activities, and then presents an example of representing three level's schedules within schedule hierarchy by the BDM technique.

  • PDF

Schedule Computation Method of Two-way Multiple Overlapping Relationships on BDM Technique (BDM 기법에서 양방향 다중 중복관계 일정계산 방법)

  • Kim, Seon-Gyoo;Noh, Seong-Beom;Lee, Yong-Hyun;Yu, Young-Jeong;Kim, Jin-Bong;Koo, Jae-Oh
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.120-127
    • /
    • 2012
  • Today, most construction projects have been higher, bigger, and more complicated gradually. So the domestic construction companies have been trying to understand overall construction process and relationships between activities, and adopted various management techniques and tools in order to perform a systematic and effective scheduling. However numerous problems have been occurred on the practical applications because most existing scheduling softwares adapt ADM and PDM techniques. One of them, PDM, is so uneffective because it represents the overlapping relationships between two consecutive activities only by the combinations of start and finish points between two activities. In order to supplement the demerit of PDM, Beeline Diagramming Method(BDM) is proposed as a new networking technique, it can represent two-way multiple overlapping relationships between two activities directly. However there are occurring a loop phenomenon on applying two-way multiple overlapping relationships. This research proposes and verifies the schedule computation method of two-way multiple overlapping relationships on the BDM network.

Preparation of Branched Dextran Microspheres of Soluble Interferon-alpha and its Activity In Vitro and In Vivo

  • Hong, Hua;Jo, Jeong-Rang;Yeon, Ji-Hyeon;Hong, Jun-Tack;Jung, Kyung-Hwan;Yoo, Sun-Kyun;Jang, Byeong-Churl
    • Journal of Microbiology and Biotechnology
    • /
    • v.21 no.2
    • /
    • pp.176-182
    • /
    • 2011
  • The study objective was to prepare biodegradable branched dextran microspheres encapsulated with His-tagged interferon-alpha (BDM-hIFN-${\alpha}$) and evaluate its activity in vitro and in vivo. The glycidyl methacrylate derivatized dextrans (Dex-GMA) as precursor was primarily synthesized by substituting hydroxyl groups of either the branched or linear type of dextran with GMA. Dex-GMA microspheres loaded with hIFN-${\alpha}$ was then prepared by the water-in-water emulsion technique. In vitro release and Western blotting experiments demonstrated the retained activity of hIFN-${\alpha}$ released from branched dextran microspheres at 24 h by inducing phosphorylation of signal transducer and activator transcription-1 (STAT-1), a down-stream effector of IFN-${\alpha}$, in HepG2 cells. Animal data further revealed a peak of plasma levels of IFN-${\alpha}$ in rats injected intravenously with BDM-hIFN-${\alpha}$ at 10 min post-injection, but a sharp decline at 2 h. High plasma levels of neopterin, a plasma protein induced by IFN-${\alpha}$, were also detected in rats injected with BDM-hIFN-${\alpha}$ at 10 min post-injection. Notably, plasma levels of neopterin remained high at 4 h, but largely declined thereafter.

Estimation of Project Duration by Probabilistic Linkage Evaluation Technique (PLET) (확률적 연결관계 평가기법(PLET)에 의한 사업공기 추정)

  • Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.44-52
    • /
    • 2014
  • Generally, the most difficult works at scheduling are to estimate the duration of activities and linkages between them because the possibility that the duration and linkages could be exposed to the uncertainties is so high. When estimating a project duration, therefore, the probabilistic estimation of the duration as well as the probabilistic estimation of the linkages between activities should be considered concurrently. The PERT that is one of the most popular techniques applied for the probabilistic estimation of a project duration can not consider the uncertainties of the linkages because it only estimates the probabilistic duration limited to 'FS0' relationship. The purpose of this study is to propose the new method "PLET" for stochastically estimating the project duration based on the probabilistic estimation of the BDM's relationships, and also provide more wide and various probabilsitic information about the project duration by it.