• 제목/요약/키워드: Arrival Management

검색결과 342건 처리시간 0.023초

관제패턴 모델링을 통한 도착예정시간 예측기법 연구 (Aircraft Arrival Time Prediction via Modeling Vectored Area Navigation Arrivals)

  • 홍성권;이금진
    • 한국항공운항학회지
    • /
    • 제22권2호
    • /
    • pp.1-8
    • /
    • 2014
  • This paper introduces a new framework of predicting the arrival time of an aircraft by incorporating the probabilistic information of what type of trajectory pattern will be applied by human air traffic controllers. The proposed method is based on identifying the major patterns of vectored trajectories and finding the statistical relationship of those patterns with various traffic complexity factors. The proposed method is applied to the traffic scenarios in real operations to demonstrate its performances.

도시유역의 내수배제시스템 설계를 위한 유출특성분석 -SWMM의 적용- (Runoff Characteristics Analysis for Interior Drainage Systems in Urban Basin -Application of SWMM-)

  • 최윤영;이영화
    • 한국환경과학회지
    • /
    • 제9권3호
    • /
    • pp.193-199
    • /
    • 2000
  • This study is carried out the analysis of the runoff characteristics for the design of the interior drainage systems by SWMM in urbanization basin. The basin analyzed in this study is Bumuh-chun basin which is located in Susung-gu of Taegu city. Huff method is used for rainfall distribution analysis. The optimal rainfall duration in Bumuh-chun basin is analyzed as about 90 minutes decided from comparison of arrival time and critical duration. Flood flow variation pattern is proposed through the comparison of the results of peak flow and peak time analyzed by SWMM about pre-urbanization and post-urbanization of Bumuh-chun basin. It is known that the variation of arrival time caused by the rapid increase of pavement rate in the upper area shows about 20∼25 minutes faster than pre- urbanization. Therefore, the management of surface water for design of water supply and drainage, and channel alteration has to considered the variation of geological factors according to urbanization.

  • PDF

공통선 신호 시스템의 ISDN 사용자부 신호 지연 분석 (Analysis of ISUP signalling Delay in Common Channel Signaling System)

  • 박철근
    • 한국통신학회논문지
    • /
    • 제25권9A호
    • /
    • pp.1377-1386
    • /
    • 2000
  • As all delays resulting from the signaling network directly affect the response time of network management activity, all control informations have to be transported most efficiently. It is very important to know the performance of the signaling system not only because of smooth network operation but also because of efficient engineering of signaling networks. In this paper, we analyzed mean queueing delay of signaling link for ISUP signaling messages in common channel signaling system by using M[X]/G/1 and M[X]/D/1 batch arrival queueing system. This is because we modeled arrival process of the signaling messages as batch arrival process considering that many kinds of signaling messages are generated at short intervals when a call requests a connection. Analysis was carried out considering different call processing scenario based on ITU-T specification. We also described the numerical results from the different types of queueing models.

  • PDF

A Study on integrated water management system based on Web maps

  • Choi, Ho Sung;Jung, Jin Young;Park, Koo Rack
    • 한국컴퓨터정보학회논문지
    • /
    • 제21권8호
    • /
    • pp.57-64
    • /
    • 2016
  • Initial prevention activities and rapid propagation conditions is the most important to prevent diffusion of water pollution. If water pollutants flow into streams river or main stresm located in environmental conservation area or water intake facilities, we must predict immediately arrival time and the diffusion concentration to the proactive. National Institute of Environmental Research developed water pollution incident response prediction system linking dam and movable weir. the system is mathematical model which is updated daily. Therefore it can quickly predict the arrival time and the diffusion concentration when there are accident of oil spills and hazardous chemicals. Also we equipped with mathematical model and toxicity model of EFDC(Environmental Fluid Dynamics Code) to calculate the arrival time and the diffusion concentration. However these systems offer the services of an offline manner than real-time control services. we have ensured the reliability of data collection and have developed a real-time water quality measurement data transmission device by using the data linkage utilizing a mode bus communication and a commercial SCADA system, in particular, we implemented to be able to do real-time water quality prediction through information infrastructure of the water quality integrated management business created by utilizing the construction of the real-time prediction system that utilizes the data collected, the Open map, the visual representation using charts API and development of integrated management system development based on web maps.

A Batch Arrival Queue with Bernoulli Vacation Schedule under Multiple Vacation Policy

  • Choudhury Gautam;Madan Kailash C.
    • Management Science and Financial Engineering
    • /
    • 제12권2호
    • /
    • pp.1-18
    • /
    • 2006
  • We consider an $M^x/G/1$ queueing system with Bernoulli vacation schedule under multiple vacation policy. where after each vacation completion or service completion the server takes sequence of vacations until a batch of new customer arrive. This generalizes both $M^x/G/1$ queueing system with multiple vacation as well as M/G/1 Bernoulli vacation model. We carryout an extensive analysis for the queue size distributions at various epochs. Further attempts have been made to unify the results of related batch arrival vacation models.

준비기간을 포함한 다양한 휴가형태에서의 $M^{X}/G/1$ 시스템 분석 (An analysis of the $M^{X}/G/1$ system with various vacations and set-up time)

  • 허선;윤영호;안선응
    • 한국경영과학회지
    • /
    • 제27권2호
    • /
    • pp.111-121
    • /
    • 2002
  • In this paper, we analyze an M$^{x}$ /G/1 with three types of vacation periods including setup time. Three types of vacations are : N-policy, single vacation, and multiple vacation. We consider compound poisson arrival process and general service time, where the server starts his service when a setup is completed. We find the PGF of the number of customers in system and LST of waiting time, with welch we obtain their means. A decomposition property for the system sloe and waiting time is described also.

서버 유휴 시의 고객 집단 도착과 서버 다운이 존재하는 M/G/1 모형의 분석 (M/G/1 queue with disasters and mass arrival when empty)

  • 김진동;양원석;채경철
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2002년도 춘계공동학술대회
    • /
    • pp.841-844
    • /
    • 2002
  • Recently there has been an increasing interest in queueing models with disasters. Upon arrival of a disaster, all the customers present are noshed out. Queueing models with disasters have been applied to the problems of failure recovery in many computer networks systems, database systems and telecommunication networks in this paper, we suffest the steady state and sojourn time distributions of the M/G/l model with disaster and mass alway when the system is empty.

  • PDF

적재작업과 교통사고의 연관성에 관한 연구 (A Study on the Relationship between Loading Work and Traffic Accidents)

  • 김형태;김기홍
    • 대한안전경영과학회지
    • /
    • 제25권2호
    • /
    • pp.91-97
    • /
    • 2023
  • Ensuring the safe arrival of delivery cargo at its intended destination is of utmost importance. Truck drivers play a crucial role in guaranteeing the secure delivery of cargo without any mishaps. However, there are various factors that may lead to delayed arrival of trucks at their destination, such as late departures or prolonged loading operations. The timely departure of cargo transportation is contingent upon several variables, including the driver's experience, cargo volume, and loading time. If the transportation commencement is delayed, it may increase the risk of accidents due to an elevated operating speed. Consequently, we conducted a study to investigate the correlation between cargo loading time, cargo volume, driving experience, and the likelihood of accidents. Our findings indicate that both cargo volume and driver experience can impact the likelihood of vehicle accidents. Furthermore, all factors can have an interactive effect on the occurrence of accidents. However, extending the loading time may mitigate the impact on the likelihood of accidents.

시스템 내 고객 수에 따라 서비스율과 도착율을 조절하는 M/G/1/K 대기행렬의 분석 (Analysis of an M/G/1/K Queueing System with Queue-Length Dependent Service and Arrival Rates)

  • 최두일;임대은
    • 한국시뮬레이션학회논문지
    • /
    • 제24권3호
    • /
    • pp.27-35
    • /
    • 2015
  • 대기행렬 시스템에는 고객들의 대기시간이 지나치게 길어지는 것을 막기 위해 다양한 정책들이 적용되는데, 본 연구에서는 고객숫자에 따른 제어 정책을 갖는 유한용량 M/G/1/K 대기행렬을 분석한다. 고객의 숫자에 따라 서버의 서비스율과 고객의 도착율을 조절하는 정책이다. 두 개의 한계점(thresholds) $L_1$$L_2$($${\geq_-}$$L1)를 설정하고 시스템 내 고객의 숫자가 $L_1$보다 작을 때는 시스템은 보통(또는 상대적으로 느린)의 서비스율(service rate)과 보통의 도착율(arrival rate)을 갖는다. 고객의 숫자가 증가하여 $L_1$이상이고 $L_2$보다 작으면 도착율은 그대로 이지만 서비스율을 증가시켜 빠르게 서비스한다. 이후 고객의 숫자가 더욱 증가하여 $L_2$ 이상이면 고객의 도착율도 작은 값으로 바꾸어 고객을 덜 입장시킨다. 위 정책을 갖는 M/G/1/K 대기행렬을 내재점 마코프 체인과 준-마코프 과정을 이용하여 분석하고 수치예제를 제시한다.

GIS 부분방전 신호와 도착 시간차 분석을 통한 PD발생 위치 추적 (Partial Discharge Position Tracking Method using a GIS Partial Discharge Signal and Arrival Time Difference)

  • 최문규;차한주
    • 전기학회논문지
    • /
    • 제62권9호
    • /
    • pp.1297-1301
    • /
    • 2013
  • This paper analyzes of PD occurrence position through an analysis of the arrival time difference between the GIS partial discharge signal. Because of GIS (Gas Insulated Switchgear) is a facility very important power equipment and as part of the equipment that make up the power system, the stabilization of the power industry, which accounted for 88.5% share of GIS substation in the form of a substation is an important equipment for power supply. In the situation where we are gradually expanding the need for preventive diagnosis in order to improve the efficiency of equipment management and failure prevention for Preventive diagnosis. In this paper as a method for extracting pre-defect of failure of GIS Apply the average value method of calculating the 5 times each using a pulse of the first time of the second pulse (${\Delta}t$) with an oscilloscope generation position PD(Partial Discharge). the results of GIS internal inspection, the partial discharge of the actual the position of the partial discharge was confirmed with an accuracy of about 82% of positions. Arrival time difference in the most effective manner if the partial discharge of GIS internal occurs by applying the averaging method and TOA(Time of arrival) method, the partial discharge occurs you through the measurement and analysis of PD signal occurs was confirmed in the experiment are presented and diagnostic methods location tracking.