Study on Development for Plan Model of Tunnel construction by using Arena;on focused NATM (ARENA를 활용한 터널공사계획모델 개발에 관한 연구;NATM공법을 대상으로)

  • Lee, Si-Wook;Kim, Ok-Ki;Woo, Sung-Kwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.872-875
    • /
    • 2007
  • Estimation of total construction period and cost in the early stage of the project is very important. Simulation is one of the method considering proper compound such as tools, materials for effective construction management and estimating and analysing affected factors to construction through making suitable process. This study is to develop the model by using Arena simulation considering limited facts like blast time in a subway tunnel construction of both sides inner city. Developed model is easily useful type by using Visual Basic program, and can obtain total construction period and cost as a result. It could be used as a decision making tool in early stage of the construction.

  • PDF

Simulation Study of Consolidated Transportation (공동수송의 시뮬레이션 연구)

  • 이장룡;변의석
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.4
    • /
    • pp.56-62
    • /
    • 2003
  • Recently, in order to stay at predominance in the global infinity competition, most of companies have been reducing the cost in many fields of industry First of all, the reduction of the logistics cost have been recognized greatly as the company value rises. But, the current situation of domestic logistics cost is very weak compared with Japan, U.S.A., etc. A rate of logistics cost out of GDP is still high compared with the competitors. The reduction of the transportation cost from overall logistics cost is most urgent subject. One of the methods to make a domestic transportation system efficient is the consolidation. In this paper. we try to compare the consolidated transportation model for a cost reduction with individual case. We also analyze the efficiency of consolidated transportation using simulation program with Arena of System Modeling Company.

A Study on the Comparison of the Capacity of Waiting Anchorage Design according to the Port Operation Method - Focusing on Busan New Port -

  • Park, Jun-mo;Yang, Hyoung-Seon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.25 no.3
    • /
    • pp.251-258
    • /
    • 2019
  • This study was conducted to propose an effective port operation method in terms of the design capacity of waiting anchorage by comparing the ratio and the number of waiting anchorage according to the port operation method of Busan New Port. For this, the Arena simulation program compared the rates of waiting vessels according to the application of the multi-user terminal, liner terminal and hybrid liner terminal operation methods. As a result, analysis suggested the necessary anchorage space can be reduced to about 18 % when using the multi-user terminal operation method and about 15.6 % when using the hybrid liner terminal operation method, as compared with the liner terminal operation method. Specifically, it was effective to apply the multi-user terminal operation method in terms of the anchorage capacity to be designated to Busan New Port. This study can apply to the designation of the new anchorage in the Busan New Port by reflecting the contents of the design of the anchorage in accordance with the port operation method.

Optimal Number of Spare Engines and Modules for Aircraft Types (항공기 유형을 고려한 최적 예비엔진 및 모듈 소요 산출)

  • Jeon, Tae Bo;Sohn, Young Hwan;Kim, Ki Dong
    • Journal of the Korea Society for Simulation
    • /
    • v.26 no.3
    • /
    • pp.35-46
    • /
    • 2017
  • Spare engine plays an important role for securing readiness of military strength during unexpected fault occurrences and field/depot planned maintenances. The purpose of this research is to present an approach towards the optimal number of spare engines/modules for diversity of aircraft types. We first reviewed two representative approaches, METRIC and meta model. We then investigated military aircrafts and categorized them into 5 types with regard to the engine type and number of engines/modules per aircraft. Through rigorous investigation of planned/non-planned maintenance of each type, we drew parameters and variables involved. As known, due to the complexity of the problem, it is impossible to develop a simple mathematical model with a closed form solution. Based on the airbase operation and maintenance logic with parameters/variable drawn, we developed a simulation model using ARENA well representing real field exercises. For the optimal solution, we applied OptQuest. It has shown that the program developed generates reliable results through a set of case examples.

A Simulation Study for Analyzing an on-Demand Semiconductor Wafer Process (주문형 반도체 웨이퍼 공정분석을 위한 시뮬레이션 연구)

  • Kim, Ki-Young;Lee, Jung-Ho;Kang, Chang-Ho;Kim, Kap-Hwan
    • IE interfaces
    • /
    • v.18 no.1
    • /
    • pp.22-34
    • /
    • 2005
  • This paper introduces a simulation model which is based on the process analysis of a semiconductor company. The objective of the simulation modelis not only to estimate the overall performancesof the company but also to evaluate the performances of various operation rules for shop floor control. First, in order to develop the simulation model, a time study is performed for each process after analyzing the processes for the company. Second, by using ARENA, a simulation model is constructed based on the process analysis and the time study. After the simulation model is tested and run, its results are discussed.

Job Shop System Analysis through DBR Simulation (DBR 시뮬레이션을 통한 Job Shop 시스템 분석)

  • Shim, Yun-Seop;Byeon, Ji-Hwan;Hwang, Soon-Hyun;Jeon, Tae-Bo
    • Journal of Industrial Technology
    • /
    • v.31 no.B
    • /
    • pp.51-58
    • /
    • 2011
  • Simulation plays a pivotal role in the analysis of complex systems. In this study, a job shop manufacturing system has been analyzed through DBR (Drum-buffer-rope) simulation. Specific attention has been put to examine the rate of due-date achievement. We first derived key factors affecting the system performance. We then developed ARENA simulation program based on DBR of TOC (Theory of Constraints) concepts. Based on the performance measure, factors, and experimental design, we obtained the results. We have drawn meaningful results through examination of the results. The results obtained from this study may provide a good base for practical applications.

  • PDF

Inventory policy comparison on supply chain network by simulation technique

  • Park, Nam-Kyu;Choi, Woo-Young
    • Journal of Navigation and Port Research
    • /
    • v.34 no.2
    • /
    • pp.131-136
    • /
    • 2010
  • The aim of the paper is to solve the problem of customer reduction due to the difficulty of parts sourcing which impacts production delay and delivery delay in SC networks. Furthermore, this paper is to suggest the new inventory policy of MTS in order to solve the problem of current inventory policy. In order to compare two policies, a LCD maker is selected as a case study and the real data for 2007 years is used for simulation input. The maker uses MTO policy for parts sourcing which has the problem of lead time even if it has some advantage of inventory cost. Based on current process. The simulation program of AS-IS model and TO-BE model using ARENA 10 version is developed for evaluation. In a result, the order number of two policies shows that MTO is 52 and MTS is 53. However the quantity of order shows big difference such that MTO is 168,460 and MTS is 225,106. Particularly, the lead time of new inventory policy shows much shorter that that of MTO such that MTO 100 is days and MTS is 16 days. In spite of short lead time by MTS policy, new policy has to take burden of inventory cost per year. Total inventory cost per year by MTS policy is US$ 11,254 and each part inventory cost is that POL is US$ 1,807, LDI is US$ 2,166 and Panel is US$ 7,281. The implication of the research is that the company has to consider the cost and the service simultaneously in deciding the inventory policy. In the paper, even if the optimal point of deciding is put into tactical area, the ground of decision is suggested in order to improve the problem in SC networks.

A Study on the Simulation Model for Outpatient Waiting Time Reduction (외래환자 대기시간 단축에 대한 시뮬레이션 모델 연구)

  • Chung, Tae Joon;Yoon, Jin Sook;Yoo, Sun Kook
    • Journal of Korea Multimedia Society
    • /
    • v.23 no.3
    • /
    • pp.460-467
    • /
    • 2020
  • The medical service, accompanied by various disease and disease of modern people, must collect various information about patients through various tests, and demand continued to increase. As a result, interest in waiting time for medical services is rising, and various studies are underway to reduce waiting time. However, medical procedure is complex and diverse in the procedure of the services need to be conducted for each procedure. In this study, we are going to propose ways to improve the waiting time of the test procedures that are basically experienced by outpatients through the simulation experimental method. Based on the actual measurement data, the Arena Simulation program was used to implement the hospital's ophthalmic examination model and alternative model. Through this analysis, the waiting time of the examination procedure, the size of the queue, and density of the waiting room were analyzed.

Study on Optimal Appointment Pattern using Plastic Surgery Appointment Data (성형외과 예약 고객 데이터를 반영한 최적 예약 패턴 연구)

  • Choi, Jiyeon;Chung, Yerim
    • Korea Journal of Hospital Management
    • /
    • v.23 no.3
    • /
    • pp.87-103
    • /
    • 2018
  • Purpose: This study investigates the best appointment pattern which can enhance customer's satisfaction and hospital's efficient management reflecting plastic surgery clinic's service characteristics. Methodology: The data of this study is obtained from Plastic surgery Clinic which is located in the civic center. By collecting and analyzing the data, we build the simulation model using ARENA. Based on 5 appointment patterns that was suggested in formal appointment scheduling studies, we experiment 3 simulation models; 'Basic Appointment Pattern' that has no restriction, 'Restriction on Second Customer' that restricts the number of second customer's in each slot, 'Restriction on Process Time' that restricts the number of second customer who has long process time in each slot. We can check robustness of the appointment patterns by experimenting on off-peak day and peak day, during peak season. Findings: This study confirms that these 2 restrictions can give a better result than 'Basic Appointment Pattern' that just simply distributes customers by number. Especially, the performance of Triangle-like pattern which is the best appointment pattern in the formal study has been improved by adding restrictions. Based on 'DET', 'Restriction on Second Customer' shows a better result. Meanwhile, based on 'E(WT)', 'Restriction on Process Time' shows a better result. Overall, based on 'DET+E(WT)', 'Restriction on Second Customer' shows a better result. Practical Implications: The purpose of each hospital may alter as demand for plastic surgery grows increasingly. Thus, each hospital should be always prepared to introduce appointment pattern for changed purpose. In order to respond flexibly to these changes, it is necessary for medical personnel to improve the awareness or for hospital to create an environment by constructing appointment program so that medical personnel does not need to put more labor on work.

Using Simulation to Predict the Number of Recovery Bed and Waiting Time as Increasing Client for Sleep Endoscopy Check in Health Service Center (건강검진센터에서 위장 및 대장 수면 내시경 검사 증가에 따른 필요 회복실 침상 수 및 대기 시간 예측 시뮬레이션)

  • Lee, Hee-Joo
    • The Journal of the Korea Contents Association
    • /
    • v.10 no.2
    • /
    • pp.35-42
    • /
    • 2010
  • The increasing regular medical check up rate for early diagnosis in disease has increasing sleep endoscopy rate because of reduction with discomfort. The purpose of this study was to determine the number of recovery bed as increasing sleep endoscopy rate using check up time, waiting time & recovery time at a general hospital in Seoul. This study was analyzed using ARENA 10.0 program. At present and as increasing of sleep endoscopy rate 10%, 20% was increased recovery time, waiting time & the rate of bed inflection. So at present, the number of recovery bed has to increase for client's safety and as increasing of sleep endoscopy rate 10%, 20% has to increase 3 and then waiting time decreased in 2 minutes.