• Title/Summary/Keyword: Apartment Construction Project

Search Result 269, Processing Time 0.029 seconds

Absolute Comparison of Construction Periods between Precast Concrete and Reinforced Concrete Apartment Buildings (PC 및 RC공동주택 골조공사에 대한 공사기간 절대비교)

  • Kim, Ki-Ho;Lee, Bum-Sik;Kim, Jin-Won;Kim, Yeon-Ho;Lee, Dong-Gun;Sohn, Jeong-Rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.293-294
    • /
    • 2023
  • In accordance with recent changes in construction trends, interest in introducing the OSC, such as the Precast Concrete, is increasing in apartment buildings. In domestic studies, studies on the prediction of the construction period of PC apartment buildings through simulation have been conducted, but there is no study on the comparison of the construction period according to the actual construction of Precast Concrete(PC) and Reinforced Concrete(RC). Therefore, this study seeks to grasp the technology of the current PC construction method and to secure the original technology of project management through comparison of the absolute time of frame construction for PC and RC buildings composed of the same plane.

  • PDF

A Study on the Prediction of Civil Construction Cost on Apartment Housing Projects at the Early Stage (사업 초기단계에서 공동주택 토목공사비의 예측에 관한 연구)

  • Ha, Kyu-Soo;Lee, Jin-Kyoo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.9
    • /
    • pp.4284-4293
    • /
    • 2012
  • At the early construction project stage, the most important task is to estimate planned construction costs analyzed with detailed information. Therefore, in this study, Apartment Housing Projects at the Early Stage of Civil Construction Cost of the reasonable and accurate predictions of the Regression analysis to 170 of actual Construction Cost, and dependent variable regression to Civil Construction Cost, location based national land area based on a combination of private land, union land, public land to the use of predictive models by various analyses of the ease and accuracy. As a result, Civil Construction Cost of Apartment Housing Projects by the regression formula for the error rate estimates in national land predictive model 15.59%, private land predictive model 17.53%, union land predictive model 21.86%, public land predictive model 13.08%.

A Basis Study on Assessment Method of Influence Factors about the Shortening of the Construction Time Applying FMEA in Apartment Housing (FMEA를 활용한 공동주택 공기단축 영향요인 평가방법에 관한 기초연구)

  • Ha, Hee-Yoon;Ahn, Byung-Ju;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.383-386
    • /
    • 2007
  • Recently, The percentile of the apartment housing within the apartment construction of domestic is increasing daily. Especially the construction duration in apartment construction is an very important factor which affects project cost. Therefore the construction companies the effort to shorten construction duration. The influence factors of the construction duration are analyzed to shorten construction duration through this tendency. The shown factors are needed to assessment method efficiently. This study is to suggest a method for the assessment of influence factors about the shortening of the construction time in apartment housing based on the FMEA(Failure Mode and Effect Analysis) method.

  • PDF

Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project (사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안)

  • Cho, Tae-Jea;Choi, Jong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.9-17
    • /
    • 2011
  • Project delay is one of the most crucial impact factors in the construction process from a schedule and cost management perspective. This study focused on analyzing the causes of concrete frame work delay in the apartment construction project. According to the analysis of project cost composition, the direct cost of concrete works was highest in most samples. Actual delays of concrete works were analyzed for the six different construction components. Causes of delay were grouped into two categories; preconstruction and construction phases and these two groups were further divided into sub-groups. Analysis results revealed that the most significant delay was occurred in the 1st. floor concrete skeleton work. For each delay factor, implications of delay as well as suggestion(s) for reducing the possibility of schedule delay are provided.

Improved Methods of Cost Sharing in Apartment Remodeling Projects (공동주택 리모델링 사업 분담금 산정의 문제점 및 개선방안)

  • Kim, Jeong-Won;Lee, Dong-Jin;Lee, Min-Joo;Lee, Ji-Hyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.184-185
    • /
    • 2019
  • The purpose of this study is to suggest the improved methods for cost sharing in apartment remodeling projects. Case studies on apartment remodeling projects with different plan type were analyzed and compared. Cost sharing estimated by 'proportional rate method' shows similar results estimated by 'return on investment method' in case of similar area ratio of existing plan to remodeling plan. Otherwise cost sharing estimated by 'proportional rate method' shows great differences comparing the results estimated by 'return on investment method'. Although return on 'proportional rate method' is widely used, it is not proper to estimate cost sharing when each householder's contribution for the project varies, such as considerable differences area ratio of existing plan to remodeling plan. Improved cost sharing method is needed taking into account project contribution and characteristics.

  • PDF

Development of an Effective Time Scheduling Mechanism of the Structural Framework for the High-rise Apartment Housing -Focusing on One Cycle Time Scheduling Mechanism of Typical Floor- (아파트 골조공사의 공기단축 및 효과적 공정운영 방안 -기준층 사이클 공정분석을 중심으로-)

  • Han Choong-Hee;Bang Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.87-96
    • /
    • 2004
  • The construction duration in apartment construction is an important factor which affects project cost. Henceforth, the time shortening is essential to retrench project cost and project risk when there adopt Five-Day Workweek and introduce apartment sales after completion of construction. Therefore, the purpose of this study is to examine closely the affecting factors on the duration of framework which forms about $40\sim50\$ percent of total time in apartment construction by analyzing the schedule mechanism of typical floor and to show the reasonable time shortening methods by case study. The shown schedule mechanism and basic schedule table can utilize as a guideline in case of scheduling of framework in the existing construction method. Also, the shown time shortening methods by three case studies will guide the direction and process of time shortening while there need time shortening in many-sided projects.

An Analysis of Influence Factors for the Remodeling Project Management of Apartment Buildings -Focused on Construction Phase- (공동주택 리모델링 사업관리를 위한 영향요인 분석 -시공단계를 중심으로-)

  • Shim, Gyu-Jung;Seo, Jong-Min;Na, Young-Ju;Song, Yong-Sik;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.8 no.5
    • /
    • pp.77-83
    • /
    • 2008
  • Housing development, particularly apartment buildings, has been increasingly growing due to the construction promotion policy of the government since the 1980s. However such a volume-oriented policy results in unfavorable side effect of substandard quality and early deterioration in line with the expansion in volume. As part of measures to deal with the problems, rebuilding and remodeling have surfaced as alternative recently. Remodeling is expected to create the more benefits, compared to the rebuilding, in cost, efficiency and duration. To come up with the solution to such a challenge, it's necessary to analyze the influence factors of remodeling. Hence, the study was intended to compare the remodeling in the aspect of influence factors. The results of this study is expected to the propose of effectual management factors of the remodeling construction.

Development of Prediction Model of Subcontract's Bidding-Ratio for Private Apartment Projects (민간 공동주택 하도급 낙찰률 예측모델 개발)

  • Jang, Ki-Suk;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.250-251
    • /
    • 2021
  • A subcontract work order is the basis of the construction process and consists of the root and trunk of the construction industry. The construction process through a subcontract work order is an important element of project success, and it is the basic unit of creating profit in the construction industry. Therefore, correct analysis and forecasting of subcontract work orders allow correct estimation of construction cost and profit which is the foundation of corporate decision making. This study has started to provide predictions of subcontractor's bidding-ratio for decision-making. Since the actual project data has been used in this study, the contribution level of the model is highly expected in actual field. The statistical confidential level of adjusted decision coefficient is concluded low because of limited sample numbers. However, its accuracy and confidence level can be increased through increasing sample numbers, considering more variables, and studying of reducing error.

  • PDF

Investigation on the Manpower Staffing Plan Utiling Density Analysis Method (밀도분석에 의한 공동주택 현장관리 인력 배치계획 분석)

  • Kwon, Gi-Deoc;Kim, Sun-Kuk;Sohn, Hyo-Won;Choi, Jae-Hwi;Lee, Dong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.119-123
    • /
    • 2010
  • Recent economic slump has highlighted the needs for the construction industry to develop strategies to improve productivity and overhaul organization structure. Notably, it is urgent to improve productivity of apartment building construction projects that account for about half of the aggregate revenue of building construction projects in Korea. As construction site management manpower staffing plan has close relation with the productivity of building construction, it is essential to staff construction sites adequately in consideration of site conditions and characteristics. However, construction companies of Korea are still far from developing site management manpower staffing plan in reference to quantitative standards. Therefore, this research aims to analyze site management manpower staffing plan of apartment building construction project by means of density analysis. To be more specific, site organization charts and staffing plans of apartment building construction projects put together by large construction companies in Korea are studied and essential resources and their mobilization time of apartment building construction projects are examined. Conclusions herein will provide basic inputs to subsequent studies of apartment building construction site management manpower staffing standards.

  • PDF

건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.

  • PDF