• Title/Summary/Keyword: Apartment Construction Project

Search Result 270, Processing Time 0.026 seconds

Establishment of Disaster Response and Safety Management Systems in LH

  • Kim, Sang-Yeon
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.56-57
    • /
    • 2015
  • This study is to review and re-establish LH disaster response and safety management system of the construction site and rental apartment complex in order to make an effective response and minimize damage in the face of disaster. I suggest directions for the improvement of disaster management systems. To achieve this, I reviewed the existing disaster response organization and accept opinions of the operating department in order to constitute effective organization which respond quickly and efficiently in emergency, and assigned new roles and responsibilities at each organization. Furthermore, I setup and suggested response manuals for each possible disasters.

  • PDF

Policy Direction in Responses to Demand for Apartment Remodeling (공동주택 리모델링 수요에 대응한 정책 추진방안)

  • Lee, Yeo-Kyung;Kim, Eun-Hee
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.36 no.1
    • /
    • pp.125-136
    • /
    • 2020
  • This study aims to seek a proper policy direction in response to the demand for apartment remodeling. As the research methods, we diagnosed the current status of the remodeling policy and analyzed the demand for apartment remodeling nationwide. According to the result of analysis, we suggested the fundamental direction and tasks for remodeling policies to be pursued at the government level. The results of the study are summarized as follows. First, the result of analysis showed that the demand for environmental improvement(performance improvement) remodeling project was much higher than other types of remodeling projects. The percentage of unit increased-type remodeling that can secure business feasibility is about 10% and only 30% when it comes to reducing project costs. The remaining 70-90% need to be promoted in environmental improvement remodeling projects which dependent on the residents' payment. Second, in order to prepare a policy action plan in response to the demand for apartment remodeling, it is necessary to set up clear policy goals and strategies for apartment remodeling in advance at the national level. Along with proactive goals and strategies, graded policy support should be accompanied per type of remodeling and business demand. We also suggest to simplify administrative procedures and support the R&D research to develop technologies. It would help to utilize the unit increased-type remodeling. On the other hand, for utilizing the environmental improvement remodeling which takes up a relatively high proportion, the policy should take care of as follows: offering housing performance information, rationalizing long term repair reserve, fostering small companies and experts. Finally, apartment management system should be advanced from the perspectives of managing old apartments and institutional foundations such as new construction and customized regulations for differentiated remodeling should be accompanied.

Apartment house project cost schedule for integrated management BIM-based BoQ application plan (공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안)

  • Zheng, Lianyi;Kim, Woong-Gi;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

The policy issues for the apartment remodeling projects (공동주택 리모델링 정책의 현황과 개선방향)

  • Yoon Young-Sun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.42-45
    • /
    • 2002
  • Building remodeling concept includes maintenance & repair and renovation. We have long-term repair plan and special repair fund system for the apartment maintenance & repair, but they do not operate well. And laws and ordinances are being revised in relation with renovation. However, more policy improvement and assistance are needed in order to activate the apartment remodeling project. Especially preferential loan and tax reduction policy and deregulation of building provisions are the main tasks for the apartment remodeling.

  • PDF

A Study on the Analysis of Delay Claim Risk in Apartment Housing Projects (공동주택공사에서의 공기지연 리스크분석에 관한 연구)

  • Kim Jae-Wook;Woo Kwang-Min;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.217-221
    • /
    • 2003
  • This study proposes a new classification system and analysis methodology for time delay risk of apartment projects. And this study proposes the classification of major trades and risk level and risk index by performing expert-oriented interview and survey report on a national scale. The purpose of this study is to present basic data for time delay risk management system through the analysis of risk level, risk index and rank of major 5 trades(earth work, structure work, masonry work, window and door/glass work, and interior finish work) in apartment projects.

  • PDF

City Gas Consumption Analysis per 1m2 according to Exclusive Dwelling Area in Residential Buildings - Focused on case of Ulsan -

  • Yu, YeongJin;Kim, Sangho;Yang, SungPil;Son, Kiyoung
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.734-735
    • /
    • 2015
  • Currently, effective energy management of buildings is necessary because of accelerated global climate change and resource crisis. Especially, in the case of South Korea, city gas consumption occupies 11.8% of the total energy and 39.6% is residential use among them. Therefore, for reducing the city gas consumption, the effectiveness of residential use is needed. To address this issue, the objective of this study is to analyze the difference of the city gas consumption according to the space arrangement in the apartment building. To achieve this objective, an apartment complex having over 1,000 households was selected then, according to the space arrangement such as south-east and south-west, the data of 59.97m2 and 84.96m2 were analyzed by using statistics method. As a result, in 59.97m2 and 84.96m2, the total city gas amount in 2012 showed that 9.2% and 8.4% were more increased at south-west than southeast respectively. In the future, the findings of this study can be used to develop the prediction model of city gas consumption in apartment building.

  • PDF

A Study of the Decision Making System in adopting Off-Site Construction Method in the Initial Stage Considering the Building Project Characteristics -Focused on Structure Work of Apartment Housing- (건축 프로젝트 특성을 고려한 초기 단계에서의 Off-Site Construction 공법 도입 여부 의사 결정 시스템 개발 - 공동주택 골조공사 중심으로 -)

  • Lee, Sungho;Cha, Heesung;Son, Bosik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.89-97
    • /
    • 2022
  • Recently, various problems such as reduced productivity, insufficient inflow of skilled manpower, reduced quality, and concerns about increasing safety accidents have appeared in the domestic construction industry. Stakeholder of construction project are considering the Off-Site Construction (OSC) method rather than the conventional on-site construction as an alternative. Despite the importance of decision making in the early stage of the adoption of OSC, there is a lack of methodologies for rational decision making. In this study, a decision making system has been developed to derive the final construction cost score by deriving the project characteristics, selecting the construction difficulty index, and developing a cost model for each construction method alternatives to calculate the standard construction cost. Using this system, the OSC method can be effectively evaluated in terms of its feasibility in the early stage of construction

Improvements in the Business Process Model for the Aged Apartment Remodeling Project - In Case of the Number of Units Increased - (노후 공동주택 세대수 증가형 리모델링의 사업프로세스 개선)

  • Kim, Kyungrai;Yoon, Youngho;Kim, Chunhag
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.45-53
    • /
    • 2016
  • As the number of units increased by vertical extension is recently allowed according to the Housing Law, the aged apartment remodeling projects using the same allowed method are pursued in several apartment complex located in Bundang and Pyungchon. However, progress of the projects is not advanced due to uncertainty of the process. Therefore, the purpose of this study is to improve a business process model for the aged apartment remodeling in case of the number of units are increased for the remodeling union to pursue the remodeling project easily. In order to improve the process model, requirements for the Housing Act are analyzed, the existing process model is developed based upon the requirements, uncertainty of the existing process is examined and a to be process model is proposed to eliminate the uncertainty. Many architects and engineers are consulted to discuss the uncertainty and process model. This model will help the Government to reform the Housing Act and remodeling unions to pursue the aged apartment remodeling.

POST-OCCUPANCY EVALUATION (POE) AFTER THE EXPANSION OF AN APARTMENT PARKING LOT

  • Park, Jin-Gu;Oh, Kyung-Taek;Ryu, Gyu-Seok;Jung, In-Su;Lee, Chan-Sik
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1559-1563
    • /
    • 2009
  • Despite the serious lack of parking lots, studies on parking lot expansion are insufficient; research on users' satisfaction following parking lot expansion is practically nonexistent. Therefore, this study sought to provide basic data for the parking lot expansion of old apartments by comparatively analyzing users' satisfaction before and after the parking lot expansion through a questionnaire survey that targeted residents benefiting from the expanded parking lot. Results revealed a low post-occupancy satisfaction with the parking lot expansion despite the parking lot expansion and improvement of the parking lot environment. This was because the parking lot was not expanded up to the second basement floor due to the lack of appropriate parking space. Other factors included the construction cost burden and lack of connectivity of the basement parking lot with elevators. The results actually raise the need for the establishment of an optimally suitable expansion plan and development of method and technology requiring lower cost and shorter construction period in the design and construction processes for parking lot expansion. Through post-occupancy evaluation (POE) after parking lot expansion, this study quantitatively identified the problems associated with the parking lots of old apartments and ensuing expansion effects. The findings in this study can be used as basic data to seek a suitable diagnosis and evaluation method for the parking lots of old apartments.

  • PDF

Preference Analysis on the Reconstruction and Remodeling of Old Aged Apartment in Daejeon Area (대전지역 노후화된 아파트의 재건축과 리모델링에 대한 선호도 분석)

  • Park, Sun-Gyu
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.4 no.2
    • /
    • pp.180-186
    • /
    • 2016
  • There are many apartment buildings with the government's policy of increasing the supply of residential houses in Korea. Roughly 60% of the Korea population are living in apartment buildings. Since the 1970s, the Korean economy has grown enormously, the economic and social structure was radically transformed to industrialization and urbanization step. A village has grown into a large town in Korea and apartment buildings was constructed to solve national housing shortage by the Korean government and the construction company. Since the 2000s, this apartment buildings which was built in the 1970s and 1980s had become gradually deteriorated. So, reconstruction and remodeling project of apartment buildings have been come into request in Korea. There are two way to improve the residential environment. The one is remodeling of apartment buildings and the other is reconstruction of that. Therefore, we carried out questionnaire and survey study of the preference on the reconstruction and remodeling of old aged apartment which were located in daejeon province. As a result, the preference rate of remodeling is increasing instead of reconstruction because reconstruction of apartment buildings takes more money and needs long construction period.