PC 및 RC공동주택 골조공사에 대한 공사기간 절대비교 (Absolute Comparison of Construction Periods between Precast Concrete and Reinforced Concrete Apartment Buildings )

  • 김기호;이범식;김진원;김연호;이동건;손정락
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.293-294
    • /
    • 2023
  • In accordance with recent changes in construction trends, interest in introducing the OSC, such as the Precast Concrete, is increasing in apartment buildings. In domestic studies, studies on the prediction of the construction period of PC apartment buildings through simulation have been conducted, but there is no study on the comparison of the construction period according to the actual construction of Precast Concrete(PC) and Reinforced Concrete(RC). Therefore, this study seeks to grasp the technology of the current PC construction method and to secure the original technology of project management through comparison of the absolute time of frame construction for PC and RC buildings composed of the same plane.

  • PDF

사업 초기단계에서 공동주택 토목공사비의 예측에 관한 연구 (A Study on the Prediction of Civil Construction Cost on Apartment Housing Projects at the Early Stage)

  • 하규수;이진규
    • 한국산학기술학회논문지
    • /
    • 제13권9호
    • /
    • pp.4284-4293
    • /
    • 2012
  • 건설사업 수행의 초기단계에서 가장 중요한 과제는 적정 예정공사비를 산정하는 일이다. 따라서 본 연구에서는 공동주택 건설사업 초기단계에서 합리적이고 정확한 토목공사비의 예측을 위하여 170개의 공사비자료를 활용한 회귀분석을 실시하였고, 종속변수인 토목공사비를 지역위치에 따른 전국, 부지조건에 따른 사유지, 조합부지, 공공부지로 구분하여 다양한 분석을 함으로써 예측모델의 이용의 편리성과 정확성을 높였다. 회귀식을 이용한 공동주택 토목공사비의 예측 결과 오차율은 전국 적용 예측모델 15.59%, 사유지 적용 예측모델 17.53%, 조합부지 적용 예측모델 21.86%, 공공부지 적용 예측모델 13.08%로 나타났다.

FMEA를 활용한 공동주택 공기단축 영향요인 평가방법에 관한 기초연구 (A Basis Study on Assessment Method of Influence Factors about the Shortening of the Construction Time Applying FMEA in Apartment Housing)

  • 하희윤;안병주;이윤선;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.383-386
    • /
    • 2007
  • 최근 국내 건설공사에 있어서 공동주택이 차지하는 비율은 나날이 증가하고 있다. 건설공사에서 공기는 직접적으로 건설사업비에 영향을 미치기 때문에 매우 중요하다. 따라서 국내에서도 공기단축을 위해 많은 노력을 하고 있는 실정이다. 이러한 추세에 따라서 공기를 단축하기 위해서는 공기에 영향을 미치는 중요요인을 분석하고, 도출된 요인들을 효과적으로 평가하기 위한 방법이 필요하다. 본 연구에서는 공동주택의 공기단축에 미치는 영향요인을 평가하는 방법으로 FMEA 기법을 제안하고자 한다.

  • PDF

사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안 (Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project)

  • 조태제;최종수
    • 한국건축시공학회지
    • /
    • 제11권1호
    • /
    • pp.9-17
    • /
    • 2011
  • 건설프로젝트에서 공기지연은 공정 및 공사비 관리 측면에서 핵심 관리사항에 해당된다. 본 연구는 아파트 건설공사에서 직접비의 상당부분을 차지하는 골조공사를 대상으로 공사부위별 공기지연 수준을 분석하고 대책을 제시한 실증연구로 10개 현장의 공사비 비중분석 결과에 기반하여 골조공사에서 지연이 발생하는 부위의 순위, 원인 등을 분석하였다. 분석결과 1층 골조공사에서 가장 큰 지연이 발생하는 것으로 나타났으며 지연원인을 다양한 분류에 의거하여 분석하고 대책을 제시하였다.

공동주택 리모델링 사업 분담금 산정의 문제점 및 개선방안 (Improved Methods of Cost Sharing in Apartment Remodeling Projects)

  • 김정원;이동진;이민주;이지형
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.184-185
    • /
    • 2019
  • The purpose of this study is to suggest the improved methods for cost sharing in apartment remodeling projects. Case studies on apartment remodeling projects with different plan type were analyzed and compared. Cost sharing estimated by 'proportional rate method' shows similar results estimated by 'return on investment method' in case of similar area ratio of existing plan to remodeling plan. Otherwise cost sharing estimated by 'proportional rate method' shows great differences comparing the results estimated by 'return on investment method'. Although return on 'proportional rate method' is widely used, it is not proper to estimate cost sharing when each householder's contribution for the project varies, such as considerable differences area ratio of existing plan to remodeling plan. Improved cost sharing method is needed taking into account project contribution and characteristics.

  • PDF

아파트 골조공사의 공기단축 및 효과적 공정운영 방안 -기준층 사이클 공정분석을 중심으로- (Development of an Effective Time Scheduling Mechanism of the Structural Framework for the High-rise Apartment Housing -Focusing on One Cycle Time Scheduling Mechanism of Typical Floor-)

  • 한충희;방종대
    • 한국건설관리학회논문집
    • /
    • 제5권4호
    • /
    • pp.87-96
    • /
    • 2004
  • 건설공사에서 공기는 매우 중요한 요소로 건설사업비에 미치는 영향이 크다. 선진국들은 공기단축을 통한 건설사업비 절감을 위해 노력하고 있다. 국내에서도 공기단축의 필요성을 절감함으로써 공기단축을 위해 많은 노력을 기울여 왔지만, 그 효과는 아직 미미한 것으로 나타나고 있다. 향후 주 5일 근무제가 시행되고, 후분양제가 도입될 경우, 건설사업비 절감이나 리스크 관리측면에서 공기단축은 필수불가결한 요인이 될 것이다. 공기를 효과적으로 단축하기 위해서는 공기에 영향을 미치는 중요요인과 공정 메커니즘을 명확하게 분석해야 한다. 이러한 사항들이 규명될 때 효과적인 공기단축이 가능해져 건설사업비를 줄일 수 있게 될 것이다. 이에 본 연구에서는 아파트 건설공사에서 공기의 $40\sim50\%$를 차지하는 골조공사의 기준층에 대한 공정메커니즘을 분석하여 골조공사의 공기에 영향을 미치는 요인들을 규명하고자 한다. 또한, 도출된 요인들을 효과적으로 활용할 수 있는 방법들을 사례 분석함으로써 합리적인 공기단축방안을 제시하고자 한다.

공동주택 리모델링 사업관리를 위한 영향요인 분석 -시공단계를 중심으로- (An Analysis of Influence Factors for the Remodeling Project Management of Apartment Buildings -Focused on Construction Phase-)

  • 심규정;서종민;나영주;송용식;김선국
    • KIEAE Journal
    • /
    • 제8권5호
    • /
    • pp.77-83
    • /
    • 2008
  • Housing development, particularly apartment buildings, has been increasingly growing due to the construction promotion policy of the government since the 1980s. However such a volume-oriented policy results in unfavorable side effect of substandard quality and early deterioration in line with the expansion in volume. As part of measures to deal with the problems, rebuilding and remodeling have surfaced as alternative recently. Remodeling is expected to create the more benefits, compared to the rebuilding, in cost, efficiency and duration. To come up with the solution to such a challenge, it's necessary to analyze the influence factors of remodeling. Hence, the study was intended to compare the remodeling in the aspect of influence factors. The results of this study is expected to the propose of effectual management factors of the remodeling construction.

민간 공동주택 하도급 낙찰률 예측모델 개발 (Development of Prediction Model of Subcontract's Bidding-Ratio for Private Apartment Projects)

  • 장기석;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.250-251
    • /
    • 2021
  • A subcontract work order is the basis of the construction process and consists of the root and trunk of the construction industry. The construction process through a subcontract work order is an important element of project success, and it is the basic unit of creating profit in the construction industry. Therefore, correct analysis and forecasting of subcontract work orders allow correct estimation of construction cost and profit which is the foundation of corporate decision making. This study has started to provide predictions of subcontractor's bidding-ratio for decision-making. Since the actual project data has been used in this study, the contribution level of the model is highly expected in actual field. The statistical confidential level of adjusted decision coefficient is concluded low because of limited sample numbers. However, its accuracy and confidence level can be increased through increasing sample numbers, considering more variables, and studying of reducing error.

  • PDF

밀도분석에 의한 공동주택 현장관리 인력 배치계획 분석 (Investigation on the Manpower Staffing Plan Utiling Density Analysis Method)

  • 권기덕;김선국;손효원;최재휘;이동훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.119-123
    • /
    • 2010
  • Recent economic slump has highlighted the needs for the construction industry to develop strategies to improve productivity and overhaul organization structure. Notably, it is urgent to improve productivity of apartment building construction projects that account for about half of the aggregate revenue of building construction projects in Korea. As construction site management manpower staffing plan has close relation with the productivity of building construction, it is essential to staff construction sites adequately in consideration of site conditions and characteristics. However, construction companies of Korea are still far from developing site management manpower staffing plan in reference to quantitative standards. Therefore, this research aims to analyze site management manpower staffing plan of apartment building construction project by means of density analysis. To be more specific, site organization charts and staffing plans of apartment building construction projects put together by large construction companies in Korea are studied and essential resources and their mobilization time of apartment building construction projects are examined. Conclusions herein will provide basic inputs to subsequent studies of apartment building construction site management manpower staffing standards.

  • PDF

건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.

  • PDF