• Title/Summary/Keyword: Apartment Building Construction Project

Search Result 120, Processing Time 0.022 seconds

A Calculation Model of Site Management Manpower for Apartment Building Construction Project (공동주택의 현장관리 인력 산출모형 연구)

  • Kwon, Gi-Deoc;Kim, Sun-Kuk;Won, Il-Woo;Joo, Jin-Kyu;Lee, Goon-Jae
    • KIEAE Journal
    • /
    • v.11 no.4
    • /
    • pp.47-54
    • /
    • 2011
  • Construction companies find it increasingly necessary to reduce the cost as the construction market has been suffering from a depression and the industrial environment has been changing fast lately. The cost cut demands the productivity management of the field operations, which can be made feasible by assigning an appropriate number of managers on the construction site. However, previous studies are focused on the labor productivity and construction companies take into account only the revenue per worker in organizing the staff. The purpose of this study is to research the model for calculating the field management manpower in accordance with the characteristic of project and site conditions which are usually considered in the beginning of the construction project. The data about apartment building projects of domestic large constructors and factors related to them were statistically analyzed. The results of this study can be used to calculate the necessary field management manpower in accordance with the characteristic of project.

Mathematical Algorithm for Members Erection Period of Beam-Column System PC Apartment Building (보-기둥구조 PC공동주택의 부재 조립기간에 대한 수학적 알고리즘)

  • Kim, Ki-Ho;Lee, Bum-Sik;Kim, Jin-Won;Lee, Dong-Gun;Kim, MIn-Jun;Sohn, Jeong-Rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.117-118
    • /
    • 2023
  • Estimating the construction period at the initial stage of the project and determining whether it is appropriate is very important for the developer's decision-making and the success of the construction company's business. Existing researchers have conducted various studies to calculate the appropriate construction period, but there is no study on the influencing factors and methodology for the construction period of beam-column PC apartment building frame construction. The purpose of this study is to calculate the PC member assembly time using the mathematical algorithm of PC member assembly. The results of this study can be used as basic data to calculate the construction date of the standard floor of PC construction.

  • PDF

Absolute Comparison of Construction Periods between Precast Concrete and Reinforced Concrete Apartment Buildings (PC 및 RC공동주택 골조공사에 대한 공사기간 절대비교)

  • Kim, Ki-Ho;Lee, Bum-Sik;Kim, Jin-Won;Kim, Yeon-Ho;Lee, Dong-Gun;Sohn, Jeong-Rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.293-294
    • /
    • 2023
  • In accordance with recent changes in construction trends, interest in introducing the OSC, such as the Precast Concrete, is increasing in apartment buildings. In domestic studies, studies on the prediction of the construction period of PC apartment buildings through simulation have been conducted, but there is no study on the comparison of the construction period according to the actual construction of Precast Concrete(PC) and Reinforced Concrete(RC). Therefore, this study seeks to grasp the technology of the current PC construction method and to secure the original technology of project management through comparison of the absolute time of frame construction for PC and RC buildings composed of the same plane.

  • PDF

A Basic Study on the Development of Profit Risk Management Model for Apartment Projects (아파트 개발 프로젝트의 수익 리스크 관리모델에 관한 기초연구)

  • Son, Seunghyun;Lee, Sungho;Han, Bumjin;Na, Young-Ju;Kim, Ji-Myung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.215-216
    • /
    • 2022
  • Profit, the performance of an apartment development project, is directly affected by the sales ratio, unit sale price, financial costs, land costs and construction costs. However, these factors fluctuate in response to changes in the environment, including various stake holders, and the profits fluctuate as a result. In order to ensure that profits are managed within target levels, these factors must be able to be predicted, controlled and monitored and managed up to the start, sale, and end stages of the project. The purpose of this study is to develop a profit risk management model for apartment development projects. The results of this study will contribute to the establishment of academic basis for the dynamic management of project profits that fluctuate with time and environment. And in practice, it will help project developers manage their business revenue to the proper level. In addition, the risks that occur from time to time can be identified quantitatively and visually, and it is expected that it will be easier to derive consensus points for smooth business progress by reducing conflicts of interest among stakeholders.

  • PDF

The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction (벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究))

  • Kim Joon-Ho;Kim Gwang-Hee;Cho Hyung-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

Effectiveness Analysis of the Construction Schedule for PC Apartment Buildings using a Tower Crane (타워크레인을 적용한 대단지 PC공동주택의 공정계획 효용성 분석)

  • Kim, Ki-Ho;Lee, Bum-Sik;Lee, Dong-Gun;Kim, Min-Jun;Sohn, Jeong-Rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.105-106
    • /
    • 2023
  • In project projects where various factors arise, the construction company's initial establishment of a reasonable process plan reduces various variables and potential risks. In order to create a densely written initial process plan, it is necessary to compare the economic feasibility of time and money by reflecting Slack time. Through this, site managers can lead a successful project based on reasonable and stable construction.

  • PDF

A Basic Study on City Gas Consumption Difference according to the exclusive dwelling area

  • Kim, Sang Ho;Yang, Sungpil;Yu, Yeongjin;Son, Kiyoung
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.732-733
    • /
    • 2015
  • Currently, since the total energy amount has been increased continuously, the effort for energy efficiency of apartment building is necessary. Although the previous studies have been focused on the issue. Almost studies are about the simulation by applying the energy analysis tools and a lack of studies have been conducted the data analysis about real city gas amount of apartment building. Therefore, the objective of this study is to analyze the city gas consumption difference according to the exclusive dwelling in apartment building. To address this issue, the descriptive, correlation, analysis of variance (ANOVA) statistics are used in this study. As a result, in the case of annual total amount, the city gas is increased as the size of the exclusive dwelling area is increased. In the future, the findings of this study can be used as a basic material to develop the prediction model of city gas in apartment building.

  • PDF

Delay Factors Based on the Importance of Finish Work in Apartment Construction Project (공동주택 마감공사 중요도 기반 작업지연 요인 분석)

  • Lee, Seung-Hoon;Lee, Sang-Hyo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

  • PDF

Relationship Analysis of Field Work in Beam-Column System Frame Work of the Precast Concrete Public Apartment Building (보-기둥구조 PC공동주택 골조공사 작업관계 분석)

  • Kim, Ki-Ho;Kim, Jin-Won;Kim, MIn-Jun;Lee, Dong-Gun;Sohn, Jeong-Rak;Lee, Bum-Sik
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.41-42
    • /
    • 2022
  • This study analyzed the process related to the linkage between on-site work targeting the middle size Precast Concrete(PC) public apartment building with beam-column system and prepared on-site works flow relationship diagram in which the wet process consists of core Critical Path(CP) to prepare a network diagram of the Precedence Diagram Method(PDM). Through this study, it is expected that it will be possible to maximize the project management capability by suggesting a method to minimize risk factors and the optimized process management of the beam-column system PC public apartment building.

  • PDF

Improved Methods of Cost Sharing in Apartment Remodeling Projects (공동주택 리모델링 사업 분담금 산정의 문제점 및 개선방안)

  • Kim, Jeong-Won;Lee, Dong-Jin;Lee, Min-Joo;Lee, Ji-Hyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.184-185
    • /
    • 2019
  • The purpose of this study is to suggest the improved methods for cost sharing in apartment remodeling projects. Case studies on apartment remodeling projects with different plan type were analyzed and compared. Cost sharing estimated by 'proportional rate method' shows similar results estimated by 'return on investment method' in case of similar area ratio of existing plan to remodeling plan. Otherwise cost sharing estimated by 'proportional rate method' shows great differences comparing the results estimated by 'return on investment method'. Although return on 'proportional rate method' is widely used, it is not proper to estimate cost sharing when each householder's contribution for the project varies, such as considerable differences area ratio of existing plan to remodeling plan. Improved cost sharing method is needed taking into account project contribution and characteristics.

  • PDF