• 제목/요약/키워드: Allowable settlement

검색결과 132건 처리시간 0.034초

얕은 기초에서의 침하문제 (Settlement Problems in Shallow Foundations)

  • 이상덕
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 기초기술위원회 워크샵
    • /
    • pp.53-80
    • /
    • 2002
  • Settlement in the Shallow Foundation are presented. Various practical methods to calculate immediate settlement, consolidation settlement, and secondary compression of the compressive soils under the shallow foundation are summerized. Especially the critical depth for settlement calculation, the contact pressure, the allowable settlement of the shallow foundation are recommended.

  • PDF

항타 및 매입말뚝의 하중-침하량 곡선의 분석 (Analysis of Load-Settlement Curves in Driven and Embedded Piles)

  • 천병식;조천환
    • 한국지반공학회지:지반
    • /
    • 제13권6호
    • /
    • pp.61-70
    • /
    • 1997
  • 매입말뚝공법으로 시공된 말뚝의 거동은 항타말뚝의 그것과는 다르고 또한 여기서 얻어지는 하중-침하량 곡선의 특성도 다름에도 불구하고 이에 대한 기본적인 고찰없이 항타공법에서 적용해 왔던 허용하중 결정방법을 그대로 매입말뚝공법에도 준용하고 있다. 국내의 관련기준에 의하면 허용지지력을 결정하는 방법들이 기준마다 서로 다르고 또한 적용 안전율도 차이가 있어 서로 상충되는 면이 있다. 본 논문에서는 106개 말뚝의 정재하시험을 통해 얻어진 하중-침하량 곡선을 분석하고 이들 결과를 공법별로 비교하였다. 분석결과 일정한 곡선을 기준하여 제시된 각종의 수학적 기법들은 허용지지력을 결정하기 위한 적절한 방법이 아님을 알 수 있었다. 또한 분석결과를 바탕으로 적절한 허용하중 판정방법 및 적용안전율을 제안하였다.

  • PDF

Settlement and Bearing Capacity of Roadbed Subjected to Tilting-train Loading in Various Ground Conditions

  • Jeon, Sang-Soo
    • International Journal of Railway
    • /
    • 제8권2호
    • /
    • pp.35-41
    • /
    • 2015
  • Tilting-train is very attractive to the railroad users in the world due to the advantage of high speed in curved track using pre-existing infrastructure of railway. Tilting-train has a unique allowable speed and mechanism especially in curved track. In this work, when tilting-train is operated with the allowable speed, the behavior of roadbed is evaluated by examining its settlement and bearing capacity. Additionally, the stability of roadbed is estimated as the roadbed is in the condition of soft soil influenced by the weather effects and cyclic train loading. Numerical results show that the roadbed settlement satisfies the allowable settlement when the elastic modulus of upper roadbed should be greater than $5000t/m^2$.

고속철도 궤도 종류에 따른 허용침하량 분석 (Analysis of Allowable Settlement on Tracks of High Speed Railway)

  • 김영호;정상섬;설훈일;한영아
    • 한국지반공학회논문집
    • /
    • 제24권11호
    • /
    • pp.25-34
    • /
    • 2008
  • 본 연구에서는 고속철도 궤도의 종류에 따른 허용침하량 분포 특성을 분석하기 위하여, 기존 경부 고속철도에 사용되었던 자갈도상 궤도와 시공예정인 콘크리트 궤도의 대표단면 및 지반 물성치를 바탕으로 철도 운행 시 레일상부에서 열차하중에 의해 발생되는 침하량을 3차원수치해석을 통해 분석하였다. 특히 콘크리트궤도의 경우에는 원지반의 물성 변화에 따른 침하량 결과를 토대로 말뚝지지전면기초(pile raft foundation) 보강 시 침하 감소 효과를 분석 정리하였다. 본 연구결과, 원지반이 점성토에서는 콘크리트 궤도와 자갈도상 궤도의 사용에 따라 침하량의 차이가 컸으나, 사질토 지반의 경우는 궤도별 침하량 차이가 상대적으로 작게 나타났다. 또한 콘크리트 궤도 단면의 침하량 저감을 위한 말뚝 전면기초 시공의 경우, 무보강 단면의 해석결과보다 지지력이 확보되어 침하량 감소가 나타났으며, 말뚝의 길이가 증가될수록 침하량 감소 효과가 뚜렷하게 나타났다. 하중형태의 경우는 기존 설계에 사용되었던 객차 하중에 의한 침하량보다 기관차 하중에 의한 침하량이 더 크게 발생하여 기관차 하중을 통한 궤도 설계를 할 경우 좀 더 안전측 설계가 가능함을 확인할 수 있었다.

Evaluation of the Structural Stability of Rammed Earth Construction :The Case Restoration Project of the Stone Pagoda at Mireuksa Temple Site in Iksan

  • Min, Hwang-Sik;Choen, Deuk-Youm
    • Architectural research
    • /
    • 제20권3호
    • /
    • pp.65-73
    • /
    • 2018
  • The restoration of foundations supporting the immense load of the stone pagoda at Mireuksa Temple Site prioritizes securing its structural stability. But so far, rammed earth construction is still not easy to determine the structural stability. This paper aims to emphasize that a scientific experimental study was conducted on a rammed earth construction, to identify its methodology and obtain objective data about structural stability of the foundation work. An experimental study fabricated specimens from the soil that had been removed during the excavation survey, determined the allowable bearing capacity through plate load tests, and compared the results with the predicted stress after reassembly of the stone pagoda to estimate the structural stability. Then, the repair method was selected based on the experimental study result. The evaluation method of the restoration of foundations consisted of an examination of the allowable bearing capacity and settlement. The allowable bearing of the reinforced foundation was more than twice the contact pressure under the stacked stones of the pagoda. The possibility of settlement of the rammed earth foundation soil layer during the pagoda assembly is expected to be very low because the settlement amount of the reformed soil layer is less than half of the settlement of the stabilized existing soil layer.

콘크리트궤도 토공노반의 허용잔류침하량 결정에 관한 연구 (Study of Determination of Allowable Residual Settlement of Concrete Track Roadbed for High-Speed Railway)

  • 이일화;양신추;장승엽
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1121-1125
    • /
    • 2007
  • An active application of concrete track is being expected for the future construction of Korean railroad. For the successful concrete track construction and design in earthwork areas, the residual settlement should be reasonably estimated using the proper method. The concrete track is extremely vulnerable to the damage of residual settlement. However, at the transition areas such as bridge approach, differential settlement will likely occur due to difference of stiffness, poor drainage and poor ground treatment. The maintenance is very difficult for excessive settlement on existing line, it is need to constrain the residual settlement in step of design. In this paper, it is performed the determination of the allowable residual settlement through various study to understand the residual settlement behavior of concrete track roadbed.

  • PDF

콘크리트궤도 침하복원을 위한 궤도/노반 인터페이스부 그라우팅이 주행안정성에 미치는 영향 (Effect of Settlement Restoration Grouting between concrete track/Roadbed on the train service stability)

  • 이일화;이성진;이태균;강태호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.796-804
    • /
    • 2008
  • Various design factors should be considered in order to apply the concrete slab track system on the soil/rock roadbed. One of the important factors is the settlement of roadbed. This settlement of concrete track should be supervised under the allowable settlement limit. If the settlement of roadbed under the concrete track exceed the allowable limit, the train serviceability will considerably come down and furthermore the fatal disaster may happen. Therefore, in this paper we introduced a digitalized grouting method as a settlement restoration method that can be suitably adopted to the concrete slab track. And we also evaluated the train service stability through the analysis of the track behavior according to the difference of the stiffness between the grouted part and the original roadbed.

  • PDF

철도의 곡선반경 및 캔트에 따른 노반의 침하 및 지지력 산정 (Estimation of the Roadbed Settlement and Bearing Capacity According to Radius of Curve and Cant in Railroad)

  • 전상수;엄기영;김재민
    • 한국방재학회 논문집
    • /
    • 제7권1호통권24호
    • /
    • pp.29-38
    • /
    • 2007
  • 틸팅차량의 안정성 확보를 위해 궤도부담력과 주행안정성 검토가 이루어졌으며, 틸팅차량이 궤도부담력과 주행안정성 검토에 의해 산정된 허용속도로 운행될 경우 레일이음매 하부 노반침하에 대한 연구가 수행되었다. 열차 주행시 레일이음매와 장대레일에 작용하는 충격량이 다르기 때문에 장대레일 하부 노반에 대한 안정성 검토가 추가적으로 필요하다. 본 연구에서는 장대레일에 대하여 노반의 침하량 및 지지력을 수치해석을 통해 검토하고 허용침하량 및 허용지지력과 비교하여 노반의 안정성을 검토하였으며 레일이음매와 장대레일 하부 노반의 침하량 및 지지력을 비교 분석하였다. 그 결과, 장대레일 및 레일이음부 하부 노반의 침하량은 허용침하량의 71.2% 및 88.8%, 응력은 허용지지력의 10.4% 및 12.1%로 나타났다.

침하된 콘크리트궤도 및 구조물의 복원을 위한 PRCG공법 (PRCG Method to restore settled concrete track and structure)

  • 이일화;이성진;이수형;강태호;신학용
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.866-871
    • /
    • 2010
  • Various design factors should be considered in order to apply the concrete slab track system on the soil/rock roadbed. One of the important factors is the settlement of roadbed. This settlement of concrete track should be supervised under the allowable settlement limit. If the settlement of roadbed under the concrete track exceed the allowable limit, the train serviceability will considerably come down and furthermore the fatal disaster may happen. Therefore, in this paper we introduced a PRCG(pressurized rapid-hardening cement grouting) method as a settlement restoration method that can be suitably adopted to the concrete slab track.

  • PDF